regulation project 中文意思是什麼

regulation project 解釋
調節工程
  • regulation : n 1 規則,規程,規章,條例。2 控制,管理,限制,(情慾等的)節制。3 調整,調節,整頓。4 校準;穩...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. In fact, the affected 2. 1 ha fishpond habitats are portions of the committed mitigation wetland habitats for the shenzhen river regulation project stage ii and thus should be mitigated under the captioned project rather than being excluded from the calculation of the habitat compensation requirements

    落馬洲總站需填平2 . 1公頃作為深圳河擴闊二期工程濕地彌償的魚塘,但環評報告卻沒有計算此影響。
  2. This paper introduces the basic structure, system composition, applicable condition, main parameters and construction procedure of the first walking underwater bed leveling machine in china, and describes the construction quality and efficiency of bed leveling in yangtze estuary deepwater channel regulation project

    摘要簡要介紹我國第一臺步履式水下基床整平機的基本結構、系統組成、適用條件、主要技術參數和施工工藝,並對其在長江口深水航道治理過程中進行基床整平的實際施工質量和工效作了說明。
  3. Application of gps - rtk bathymetric survey technique without tidal observation in yangtze estuary channel regulation project

    無驗潮水深測量技術在長江口航道治理工程中的應用
  4. Semi - circular composite dikes are one of the main structures in yangtze estuary channel regulation project

    摘要半圓體混合堤是長江口深水航道治理工程中堤壩主要結構型式之一。
  5. The special - purpose semi - circular caisson installation barge, anding no. 1, built and used for the second phase of the deep waterway regulation project in the changjiang estuary has been technically renovated into a special - purpose caisson launching barge, which, after the renovation, has become a horizontally submerging semi - submersible barge capable of shore touching and bottom resting

    摘要介紹了對原用於長江口深水航道治理二期工程施工的專用半圓沉箱安裝船「安定一號」的技術改造,使之成為一艘沉箱下水專用船舶。
  6. Despite having spent hk 1, 700 million on this shenzhen river regulation project, the shenzhen government still thinks the river is too polluted and that the next course of action is to spend a further rmb 950 million to build a pumping station at sha tau kok and a 13 km long pipe to bring water from mirs bay to flush the shenzhen river

    雖然這項深圳河調整工程耗資港幣17億,但深圳特區政府認為河道污染情況仍然嚴重,因此計劃進行次階段工程:耗資9 . 5億人民幣在沙頭角與建一座抽水站和13公里長的管道,把大鵬灣海水引進深圳河。
  7. By the turn of the century. the design of various flood control schemes for the river indus is progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    多項梧桐河防洪計劃的設計工作正在進行,預計完工日期可配合深圳河治理工程,目的是在二零零二年或之前,可減低發生水浸的危險。
  8. Protection against flooding is being improved in the area. the construction works for some of the flood control schemes for the river indus are progressing with completion dates to tie in with the shenzhen river regulation project so as to relieve the risk of flooding by 2002

    梧桐河防洪計劃多項工程正進行得如火如荼,竣工日期均已訂出,務使工程與深圳河治理工程配合,以期在二零零二年或之前減低水浸風險。
  9. This paper presents a detailed introduction to the structure, design and application effect of innovative soft mattress applied in yangtze estuary deepwater channel regulation project

    摘要對長江口深水航道治理工程中採用新型軟體排護底的結構型式、設計方法以及應用效果作一介紹。
  10. Study on regulation project for xuliujin joint - baimao sand bank section of yangtze river

    長江徐六涇節點和白茆沙河段治理工程研究
  11. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江口深水航道治理工程整治建築物工程和疏浚工程的設計條件和施工條件,並在此基礎上介紹一、二期工程設計方案的優選情況,以及工程實施過程中以動態管理為主要內容的施工組織管理情況。
  12. Analysis of bed deformation of the channel regulation project at lubao shallow reach of beijiang river

    沖積性河流淺灘整治水位與整治線寬度確定
  13. The placing technique of soft mattress for bottom protection is a key technique for yangtze estuary deepwater channel regulation project, the requirements to which include high efficiency, high quality, mechanization, automatic positioning and underwater detection

    摘要護底軟體排鋪設工藝是長江口深水航道治理工程的一項關鍵技術,其要求高效、優質、機械化,並實現信息化自動定位和水下檢測。
  14. In the northern new territories, one of the critical flood mitigation undertakings is the shenzhen river regulation project, which is aimed at improving the downstream outlet for several major rivers in sheung shui and ta kwu ling

    在新界北部,較重要的防洪工程包括治理深圳河計劃? ?目的是提高位於上水及打鼓嶺地區的主要河流出口的排洪能力。
  15. This paper describes the application of semi - circular breakwater at home and abroad and the design innovation and optimization of semi - circular jetty in yangtze estuary deepwater channel regulation project, esp. the design of estuary jetty structure using semi - circular floating caissons ; a new calculation method for wave forces acting on the submerged semi - circular estuary jetty and the optimization design method for semi - circular structures are recommended

    摘要介紹半圓型防波堤和河口導堤在國內外的應用概況及在長江口深水航道治理工程中對半圓型導堤的設計創新和優化半圓型浮式沉箱的導堤結構型式,提出堤頂淹沒情況下半圓型導堤波浪力的計算方法以及半圓型結構的優化設計方法等。
  16. The scope of work included the shenzhen river regulation project at the beginning and gradually extended to cover pollution control and cleaning - up operations, such as the scavenging of floating refuse of the river in recent years

    范圍由初期的河道改善工程,逐漸擴展至污染控制及清理,也包括清理河面飄浮垃圾。
  17. In view of the technical problems of softening of foundation soil and reduction of bearing capacity of the breakwater under the action of repeated wave loads during the execution of the second phase of the deepwater waterway regulation project in the changjiang estuary, tianjin port construction corporation has successfully developed safer, higher quality and highly efficient technology and special - purpose marine craft and machinery for laying deepwater sand blankets and offshore installation of prefabricated drains, which were more suitable for the working conditions in the changjiang estuary, and has also explored the construction technology for prefabrication of caissons with rubber anti - sliding plates, to ensure the efficient implementation of the engineering measures against softening of foundation soil

    摘要針對長江口深水航道治理二期工程施工過程中遇到的堤身在波浪重復荷載作用下地基土出現軟化、承載力降低的技術難題,第一航務工程局成功開發了適合長江口工況的安全、優質、高效的深水砂被鋪設和海上塑料排水板打設施工工藝及專用船機設備,探索了一整套帶橡膠阻滑板的沉箱預制施工工藝,確保了抗軟化工程措施的有效實施。
  18. Fair competition in the works contracts for the shenzhen river regulation project

    深圳河治理計劃工程合約的公平競爭事宜
  19. The standard k - e model is adopted to simulate the flow of practical channel regulation projects. the numerical results show that the velocity distribution of flow in the regulation project river reach are mainly controlled by the geometries of natural river

    最後將標準k一:紊流數學模型應用於實際航道整治工程應用中,引入相應的邊界條件,數值模擬了整治河段水流的三維流動過程。
  20. The government of the hong kong special administrative region ( hksar ) and the shenzhen municipal government ( smg ) today ( november 21 ) signed an entrustment agreement on the third river improvement contract of the stage iii of the shenzhen river regulation project

    香港特別行政區政府及深圳市政府今日(十一月二十一日)就治理深圳河第三期工程的第三份主河道建造合約簽署委託協議書,以繼續?手合作,紓緩邊境兩岸地區的水浸威脅。
分享友人