release capability 中文意思是什麼

release capability 解釋
脫開性能
  • release : vt 1 放(箭等),投(炸彈);解放,釋放(囚犯、俘虜等);使免除;救出;解除(痛苦、債務等) (fro...
  • capability : n. 1. 能力,才能,本領。2. 性能;容量;功率,生產率。3. 〈pl. 〉潛在能力。
  1. Impatient and because these females are extremely easy generation insecurity angst, alone depression, sad sadness, dejected disappointment, angry wait for depressed mood, suffer undesirable mood for a long time to perverse stimulate, law of airframe life division happens disorder, function of nerve internal system is maladjusted, bring about core condition unbalance then, immune force drops, can make thymus is generated decrease with the thymus element that release, the monitoring capability to cell of the mutation inside body mixes cell of lymphocyte, huge bite gobble up ability to drop, incidental cancer is swollen

    由於這些女性極易產生緊張焦慮、孤獨壓抑、悲哀憂傷、苦悶失望、急躁惱怒等抑鬱情緒,長期受不良情緒剌激,機體生命節律發生紊亂,神經內分泌系統功能失調,進而導致內環境失衡,免疫力下降,可使胸腺生成和釋放的胸腺素減少,淋巴細胞、巨噬細胞對體內突變細胞的監控能力和吞噬能力下降,輕易發生癌腫。
  2. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  3. In order to accomplish the global performance of the forklift truck, the author founds the mathematical model of the stability calculation, driving capability calculation, lifting capability calculation through the trials, design experience and national criterions. and then, the author carries out the mathematical model with the delphi language and makes it a release software

    為了實現平衡重式蓄電池叉車的總體性能參數確定,首先通過試驗、設計經驗以及國家標準,建立蓄電池叉車性能參數設計計算? ?穩定性計算、行駛性能計算、起升性能計算的數學模型,然後將數學模型用delphi語言編成具有人機對話功能的設計軟體。
  4. Telecommunications - interactions between the operator services network capability and release to pivot

    電信.控制器服務網路容量和釋放中樞間的交互作用
  5. Abstract : based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    文摘:結合魚劍口電站壩下消能防沖試驗研究成果,對低壩樞紐寬尾墩的水流特點、摻氣特性、寬尾墩對大壩泄流能力和壩面壓力的影響以及寬尾墩的消能效果等問題進行了初步探討,提出了合理地使用寬尾墩結合輔助消能設施可有效地解決壩下覆蓋層深,地質條件差,抗沖能力弱的低壩樞紐的消能防沖問題,從而為具有低水頭,大單寬流量,低佛氏數特點的低壩樞紐泄洪消能開辟了一條新途徑,可供有關低壩樞紐設計與試驗工作者借鑒與參考
  6. 830 planning schedule with release capability transaction set

    具有發布功能的計劃表事務處理組
分享友人