removal project 中文意思是什麼

removal project 解釋
遷建項目
  • removal : n. 1. 移動,遷移;撤退;折卸。2. 排除;除去;切除;殺害;【林業】皆伐,終伐。3. 撤職;調職。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. The renovation project covers more than ten jobs including road leveling, addition of road side lamps, afforestation along roads, sewage removal and pipe laying, three - dimensional rectification for street side buildings, flat - to - slope modification for street side residential buildings, tidy - up of shop signs and posts, advertisement clean - up, combination of multi - posts to one and city furniture renewal etc

    改善項目涵蓋了平整道路、增設路燈、沿線綠化、截污納管、沿街建築立面整治,沿街住宅平改坡、店招店牌梳理、廣告整治、多桿合一、城市傢具更新等十多項之多。
  2. From 1996 to 1998, as a project manager, i finished the studies on simple constructed venturi water film scrubber desulphurization technology and equipment for small and medium _ sized coal _ fired power plant. such studies are one of the projects required to rack one ' s brain with emphasis by ministry of science and technology in " ninth _ five _ year " plan. on the basis of the aboved researches, being entrusted with jiangxi provencial electric power bureau and guizhou provincial electric power bureau, we conducted the engineering feasible researches and preliminary design for nanchang power power plant and guixi power plant in jiangxi province, guiyang power plant in guizhou province, yongji power plant and taiyuan thermal power plant no. 2 in shanxi province to use venturi water film scrubber simple constructed desulphurization technology. the major technical targets of above consultation are around 70 % of desulphurization rate and improved dust removal efficiencies comparing with original efficiencies. the key features of this new technology are advanced and practical, low in investment cost, small in land occupied, suit for renovating the existing power plant and suited to chinese conditions

    1998年完成了"九.五"國家科技攻關項目< >的開發工作.在此基礎上,受貴州省電力局,江西省電力局,山西省電力局的委託,分別對貴陽發電廠,南昌發電廠,貴溪發電廠,永濟發電廠,太原第二熱電廠等進行了簡易脫硫技術的工程可行性研究以及初步設計等.上述咨詢內容中的主要技術指標是脫硫效率達到70 %左右,並可提高原除塵器的除塵效率.有投資低,佔地面積小,適合老廠改造,技術先進實用等特點
  3. Where the building of any of the structures or facilities referred to in the preceding paragraph requires the extension, modification, removal or destruction of the original structures or facilities, the unit constructing the new project shall bear the expenses for extension or modification and the expenses for the compensation of losses, unless the original structures or facilities were built in violation of the relevant regulations

    因修建前款所列工程設施而擴建、改建、拆除或者損壞原有工程設施的,由后建工程的建設單位負擔擴建、改建的費用和補償損失的費用,但原有工程設施是違章的除外。
  4. For those investors who invest in industrial projects, can be provide land by agreement according to administrative transfer standards. after paying for the migration ' s removal, aftercare and plant compensation once, the land transfer charge of the project can be returned from the tax subsistence of the local financial department handed in by the enterprises to support the development of the enterprise

    對工業項目,可以協議方式供地,項目投資者除拆遷補償費、安置費和青苗補償費一次性到位外,其土地出讓金由投資方墊付后,從項目所產生的地方稅收中由財政分期列支,用於支持企業發展。
  5. Soil infiltration capability of project of removal lands from cultivation for afforestation and grass planting in beichuanhe watershed

    北川河流域退耕還林還草工程土壤滲吸性能研究
  6. According to the experience of the removal program of xiaopengxianguan, this paper talks about the problems in this sort of project, such as the procedure of survey and design, the rehabilitation of the surrounding and the building

    摘要依據廣州小蓬仙館遷建中的經驗和教訓,介紹文物建築遷移工程中,應注意有關勘察設計程序、新址環境復原和建築復原的問題。
  7. With request of modern production technology, it is further more important to design the automatic control technology of the whole dust removal system properly. this paper. gives the overall argumentation to the development during the project practice about the automatic control technology in the dust removal system

    隨著現代生產工藝的要求,適宜地設計整個除塵系統的自動化控制也變得更加重要,本文就布袋除塵系統中的自動化控制技術,對在項目實踐中的開發進行較全面的論述。
  8. This article links to the plant no. 6 project, studying the measure of pressure reduction and energy removal of large caliber and long distance water delivery pipe in big difference of elevation and topographical form area. the writer gives new measure of pressure reduction and energy removal, according to the theory of pressure reduction and energy removal, planning a composite energy removal construction, and put to use effectively in many water supply projects. it is the first example that people use concrete construction to remove high pressure in large caliber and long distance water pipe in china

    本文結合西寧市第六水源工程,對高差大、地形地貌復雜地區大口徑長距離輸水管道消能減壓措施進行了研究探討,提出了全新的減壓消能方案,根據減壓消能原理,自行設計出了綜合式消能構築物,並應用於多項輸水工程中,效果良好,成為國內首例採用鋼筋混凝土構築物消除大口徑長距離輸水管道較高壓力的案例。
  9. Any removal or dismantling involving a site to be protected for its historical and cultural value, if considered specially necessary for a project, shall be agreed to by the people ' s government at the same level as the site itself and by the department for cultural administration at the next higher level

    因建設工程和特別需要而必須對文物保護單位進行遷移或者拆除的,應根據文物保護單位的級別,經該級人民政府和上一級文化行政管理部門同意。
  10. Content of the project : set up a new heat & ache removal raw material medicine production line. sales revenue is estimated to increase by rmb200 million yuan, tax turnover, 35 rmbmillion yuan

    項目內容:新建年產2500噸解熱鎮痛原料藥生產線,預計新增銷售收入2億元,利稅3500萬元。
  11. Analysis of main points of selecting cofferdam removal scheme for chaozhou water supply junction project

    潮州供水樞紐圍堰拆除方案選擇要點淺析
  12. Concrete construction techniques in winter and quality control of xihe gate risk removal and reinforcing project

    西河閘除險加固工程混凝土冬季施工技術與質量控制
  13. Greenhouse gases - part 2 : specification with guidance at the project level for quantification, monitoring and reporting of greenhouse gas emission reductions or removal enhancements

    溫室氣體.第2部分:溫室氣體輻射降低或消除增強的量化監測和報告的規范與設計級指南
分享友人