research project index 中文意思是什麼

research project index 解釋
科研計劃索引
  • research : n. 1. 仔細搜索 (for, after)。2. 〈常 pl. 〉研究,調查,探測;追究。vt. ,vi. 追究;調查,研究 (sth. , into sth. )。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • index : n (pl es dices )1 索引。2 指標,標準,標志。3 示[食]指 (=index finger)。4 指數。5 【印刷】指...
  1. The paper is one part of national science fund project study on the theory and method of performance management presided by professor of harbin institute of technology yingjun - feng and management and scientific research project of the first group of china aviation study on corporate top and middle - level executives performance evaluation and motivation model presided by my supervisor professor lujie - wang, comprehensive introduce the condition of domestic and oversee research and analyze the relationship between executives holding corporate stock and executives " performance under corporate governance. and also discuss corporate stakeholder governance and advancement of corporate executives performance and probe into influence of corporate executives behavior model on executives performance and set up corresponding performance evaluation index to appraise corporate advance and middle - level executives performance from the balanced scorecard

    本論文作為哈爾濱工業大學馮英浚教授主持的國家自然科學基金項目「績效管理的評價理論與方法研究」和導師王魯捷教授主持的中國航空工業一集團公司管理科研基金項目「企業中高級管理者績效評價與激勵模式研究」課題的一部分,綜合國內外對此問題研究的現狀,從公司治理的角度,分析公司治理下管理者持股與管理者績效之間的關系,探討企業利益相關者治理與企業管理者績效之間的規律,以及探討企業管理者的行為模式對企業管理者績效的影響,並且從綜合記分卡體現的維度建立相應的績效評價指標。
  2. In accordance to the defects presented in using the chinese road asphalt technical standards to assess the asphalt performance as well as the facts that the shrp test equipment of usa can not be widely employed in china since its being very expensive, the shrp rheological concept is utilized in the research project to carry out the exploration of the rheological properties of modified and non - modified asphalt by using conventional tests such as penetration and ductility. the conclusions obtained by using the conventional test rheological index to assess asphalt performance are compared with those by using the shrp rheological index and their certain correlation are found

    針對目前我國道路石油瀝青技術標準評價瀝青路用性能存在的種種缺陷,以及美國shrp試驗設備因其昂貴性而暫時無法在國內大量推廣應用這一事實,本課題試圖利用shrp流變思想,採用針入度、延度等常規試驗設備進行改性及非改性瀝青流變特性的研究,並將常規試驗流變指標評價瀝青路用性能的結論與shrp流變指標評價結論作比較,找出它們之間的相關關系,從而肯定了採用常規試驗設備進行瀝青流變特性及路用性能研究的有效性。
  3. Project pursuit can be used to project high dimensional data to low dimensional space and find the optimum projection vector of data in one dimension space by data character of research units, which can comprehensively evaluate the value and direction of every index

    該方法可以依據樣本自身的數據特性尋求最佳投影方向,從而判斷各評價指標對綜合評價目標的貢獻大小和方向。
  4. The strength is a main mechanics performance index of the concrete. it has always been a focus of material scientific research of concrete. models about mechanics characteristic of concrete were mostly the understanding based on material macroscopical level of concrete in the past. its main characteristic turns the material ideal with heterogeneous, nonuniform nature into the even, continuous body and carry on modeling. this kind simplified and met project practice ' s demands to a certain extent, but it is difficult to study the influence produced toward strength of material of structure of the microcosmic or the mescoscopic within the concrete material with this kind of method

    以往有關混凝土力學特性的模型大多是基於混凝土材料宏觀層次的認識,其主要特點是把具有多相、非均勻性質的材料理想化為均勻、連續體進行建模,這種簡化盡管在一定程度上滿足了工程實踐的需要,卻難以用這種方法來研究混凝土材料內部微觀或細觀結構對材料強度所產生的影響,不能說明材料內部結構如孔結構變化時強度的變化規律,也不能用於指導如何改進材料的組成和微觀結構而達到提高混凝土強度的目的。
  5. This paper focuses on the research and measurement of customer satisfaction of hunan power transmission and substation construction company, based on the analysis of their market environment and marketing status quo, and comes out with the conclusion that the construction process of projects, the relationship with the customers, and the service quality are the key factors impacting the satisfaction of power project customers. upon this conclusion, this paper presents new idea to exploit market, and appreciate tactic of marketing mix for electric power construction companies, that is, transferring the focus on those indices for the sake of themselves such as market rate, margin rate etc, to the customer satisfaction index that reflecting customers ’ requirement, and from the phase of ‘ sale ’, to the phase of ‘ do ’ ; at the same time, this paper establishes a set of scientific model and methodology for the marketing decision of power construction companies, instead of the decision making by intuition

    本次研究在對湖南送變電公司市場環境和企業營銷現狀進行分析的基礎上,進行湖南送變電公司顧客滿意度調查和測評,得出了工程產品的施工過程、最終輸出以及與顧客關系、服務質量是影響送變電公司顧客滿意度的主要因素的結論,據此改進市場營銷組合策略,為送變電施工企業市場開拓打開了新的思路,將市場營銷策略選擇的著眼點從市場佔有率、利潤率等基於自身需要的指標上轉移到體現顧客需求的顧客滿意度指標上,將關注重心從產品銷售階段轉移到送變電工程產品施工階段;同時也為送變電公司進行營銷決策建立一種科學合理的模型和方法,避免憑自己的直覺作出營銷決策。
  6. Among these, the first part makes use of the second - hand information to carry out the research for the market demanding and the history prices of the end project products. the experience is relied on determine the price needed in the analysis of long - term investment decisions ; the second part analysizes the project investment decision by the way of using some long - term investment decision theories such as recovery period method, npu, net present index method and remuneration included methods, etc. meantime, it makes the risk analysis for the project and determines the risk elements and proposes some measures and guidance in risk management

    其中,第一部分對企業及項目情況進行了介紹,並使用二手資料的方式對項目產成品的市場需求及歷史價格進行了調研,根據經驗法確定了長期投資決策分析中所需的產品價格;第二部分對進行長期投資決策分析的理論進行了闡述,利用回收期法、凈現值法、凈現指數法和內含報酬率法等長期投資決策理論對項目的投資決策進行分析,並對項目進行了風險分析,確定了風險因素,提出了風險管理中為避免風險應當採取的一些措施和方法。
  7. The results of the study illustrate that, ( 1 ) economic analysis is the key factor of the project ' s success or failure, so it is necessary for the market survey based on facts and proper analysis, ( 2 ) key pre - research proposal and successful implement is the most influence on the construction success or failure, so the management team should pay attention to the proper proposal, ( 3 ) the construction process can be guided by the generalization process index

    文章認為: ( 1 )經濟分析是建設項目成敗的決定性因素,因此如實的市場調查及科學的數據分析非常必要; ( 2 )重大方案的預研及成功實施是決定項目施工成敗的關鍵,因此科學的預研施工方案值得項目管理人員重視; ( 3 )項目進度可用綜合進展率來量化並可進行進度的宏觀控制。這些研究成果對業主進行同類項目管理有非常重要指導意義。
  8. In order to solve two difficulties in the present conceptual design of torpedo, this paper introduces many new ideas into the original theories, and gives a new synthetic conceptual design theory for torpedo. one of the difficulties is that we have no a index which can represent various performances of torpedo, the other is that the coupling relationships among various subsystems and disciplines are ignored in the design process. the new ideas involve the study about operational effectiveness, life circle cost, risk and research schedule, which can be used together to evaluate a design project

    本文針對魚雷總體設計中目前存在的兩個突出技術難題: ( 1 )缺乏能夠全面反映魚雷總體設計性能的指標( 2 )對魚雷總體設計中各部分組成、各學科間的耦合關系,沒有合適的分析和求解方法在原魚雷總體設計理論和方法的基礎上,引進了作戰效能、壽命周期費用、風險和研製周期的概念,來全面反映魚雷設計的性能、經濟性、風險性和時間性等指標;在優化設計中,採用多學科設計優化方法作為優化演算法,構建了一種新的魚雷總體綜合設計方法。
  9. In the paper, the integrated research of characters, objectives, models, principles, index system and affecting factors of trans - boundary water resource allocatio is done : ( 1 ) the research progress in the trans - boundary water allocation in the past 10 years is summed up, and then the new development tendencies related are concluded ; ( 2 ) the key issues and difficulties on transboundary water allocation are judged through the analysis on the characters of trans - boundary water resource in both aspects of the natures and the international laws ; ( 3 ) the water allocation models as the whole allocation, the project allocation and the integrated watershed planning allocation are systematically analyzed ; ( 4 ) the technical index system is brought forward, their affecting items are discussed, and the major index are defined based on the analysis of allocation principles of the trans - boundary water ; and ( 5 ) the relative suggestions for the allocation of trans - boundary water resources in china are put forward

    摘要綜合研究了跨境水資源分配的特點、目標、模式、原則、指標體系和影響等因素:對近10年來跨境水資源分配的研究進行了總結,歸納出新的發展趨勢;從自然和國際法兩方面屬性分析跨境水資源的特點,判識跨境水分配的核心問題和難點;系統地分析了全局分配、項目分配和流域整體規劃分配等分水模式;在分析跨境水資源的分配原則基礎上,提出了分水技術指標體系,並探討了其影響因數和主要指標的確定;結合這些研究,對我國的跨境水資源分配,提出了相關建議。
  10. 3 ) find out the project post - evaluation index system of the highway sustainable development through the study on the research achievements of our predecessor, the extensive exploration, the use of the frequency statistic law and the main factors analysis method to analysis, distinguish and select the factors which can affect the

    3 )結合前人的研究成果,通過廣泛的調查研究,運用頻度統計法,主成分分析法對影響高速公路建設項目可持續發展的因素進行分析、識別和篩選,得出影響高速公路建設項目可持續發展后評價的指標體系。
  11. We use the tianjin sunac corporation as the case to analyze. through from the targeted consumers research to implement of advertising, we get the reason of project sell like hot cakes by layer index

    以天津融創集團時代奧城項目作為案例進行分析,從目標人群的研究到廣告主題及相關活動的開展,運用層級指標進行分析,最終論證了時代奧城項目的熱銷原因。
  12. Project for post - doctor research : the transparency index for chinese listed companies, including the framework designation and one or two years index data bank

    本次招收博士后的主要研究計劃:完成關于中國資本市場信息披露與透明度指數的研究與開發工作。
  13. The thesis has introduced the basic situation of shenglong co, ltd and the background of this investment project in the first part ; in the second part, this paper introduced basic theories and status of evaluation in vc decision procedure, research in foreign countries ; the third part is core and focus of the thesis, it analyze the procedures for evaluation in the vc of our country on the basis of summarizing the foreign ripe theory, put forward train of thought about appraising procedures for vc enterprise in different stages, designed an index system for evaluation in vc project of china, and analyzed how to appraise by quantification ; at last, on the basis of the third part, the thesis introduced vc project of " shenglong co, ltd " in detail, showing the application of the theory in the reality

    論文在第一部分介紹了勝隆公司的基本情況和該投資項目的背景;在第二部分則介紹了風險投資的基本理論、評價在風險投資決策流程中的地位和國外對風險投資評價的研究狀況;第三部分是本論文理論研究的核心和重點,在總結國外成熟理論的基礎上對我國風險投資評價的具體內容進行分析,提出按階段劃分的我國風險企業評價程序的思路及不同階段的評價要點,設計了一個針對中國風險投資項目評價的指標體系,並就如何將評價量化進行了分析;在第三部分的基礎上,論文最後詳細介紹了對勝隆公司投資項目進行評價的過程,展示了理論在實際案例中的應用。
  14. The article, by comparison, analysis and research, also points out that in the process of optimization and innovation, many versatile problems should be paid full attention and studied such as the contradiction between project investment and technology level, the difference between superior d esign index and lower operation index and the contradiction between low investment and high running cost

    通過比較分析和研究提出了在新型干法水泥生產線的優化和創新過程中必須充分注意研究項目投資和技術水平的矛盾、優良設計指標和較低的運行指標間的差異以及低投資和高運行成本間的矛盾等多方面的問題。
分享友人