reservoir capacity 中文意思是什麼

reservoir capacity 解釋
產能系數
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. As the valley was situated in a high area, the water supply scheme utilised gravity flow. however, the reservoir had a small capacity of just 27 million gallons, only 38 % the size of its pokfulam counterpart

    由於峽谷位處高地,供水方法仍可以利用水向低流的原理,讓水塘存水順勢流往山下區域,省去興建抽水站的工程。
  3. The reservoir had a storage capacity of 185 million gallons and a catchment area of 90 acres

    85億加侖,集水區面積為90英畝。
  4. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  5. Reservoir capacity of cambrian carbonate of foreslope facies in danzhai and sandu, eastern guizhou

    黔東三都-丹寨地區寒武系斜坡相碳酸鹽巖的儲集性
  6. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  7. In the eroded infertile soils of the yangtze river watershed there was an obstacle to the use of “ soil reservoir ”, that is, the storage capacity of “ soil reservoir ” had been severely lost because of soil erosion

    長江流域的侵蝕劣地「土壤水庫」需要承受更多的攔蓄雨水任務,但這些侵蝕劣地土壤區存在著調用「土壤水庫」的障礙。
  8. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河抽水蓄能電站二期工程泥沙調度方案,對多個方案的水庫淤積損失、過機沙量、取水口附近的泥沙淤積和水流流態,進行了水庫沖淤研究。
  9. When to realize the elementary goal of the reservoir regulation, the concept of " firm capacity " is used in the diagram, while to realize the higher goal, the " base capacity " is used

    為實現水庫調度的初級目標時,調度圖中使用的是「保證出力」的概念;而為實現水庫調度的高級目標時,調度圖中使用的是「基礎出力」的概念。
  10. It will change the hydraulic conditions of the river, such as widening the water surface, decreasing water - flow velocity and purification capacity of water body in reservoir area meanwhile, many problem will be encountered, such as a large quantities of pollution in cities and towns, harmful matters in pesticide and fertilizer in reservoir area, poisonous pollutants in rainfall, accidental discharge of municipal wastewater or industrial sewage, limits of low economic level and urbanization etc.

    該水域的水力學條件發生變化,水流速度減緩,岸邊污染帶加寬,水體的環境容量降低;三峽庫區城鎮污水處理廠和廠礦的有害廢水處理設施不可避免地會發生事故排放;成庫期內庫區城鎮污水的治理很難達到水質要求,以及三峽庫區目前較低的經濟和城鎮化水平制約,庫區城鎮供水面臨的水環境問題日漸突出。
  11. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的水情接近保證水位或者安全流量,水庫水位接近設計洪水位,或者防洪工程設施發生重大險情時,有關縣級以上人民政府防汛指揮機構可以宣布進入緊急防汛期。
  12. Effect of tributary reservoir capacity on flood risk in protected area

    支流防洪庫容對防洪區的洪災風險影響研究
  13. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水庫工程供水系統則可挑選運行費用低的、入庫水量較多的某個水庫,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。
  14. The ground base of the newly added chute in 4 tailings reservoir at dexing copper mine is characterised by thick weathered layer, loose structure, fractured zone and landslip mass accumulation. as a result, the ground has a great subsidence and inefficient carrying capacity. in view of this, the grouting technology was adopted to reinforce the chute ground base. the on - site testing shows that the subsidence of the chute has been efficiently controlled and the carrying capacity of the ground base improved so that the stability requirement has been met

    潘洛鐵礦主要使用的采礦方法是淺眼落礦的全面法和留礦全面法. 23礦體160m以上礦段上部為氧化礦和風化巖層,形成擠壓爆破和鬆散巖石覆蓋下的放礦條件.介紹了無底柱分段崩落法在該礦體開采中的應用.實際使用獲得的各項技術經濟指標還比較理想
  15. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高壩大庫工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  16. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  17. Imagine if a seismic sensor instrument or water fracs for measuring oil reservoir capacity could be dynamically controlled and refined with on - demand grid technologies

    假設有一個地震傳感器設備和用來探測石油含量的水文設備可以動態地進行控制,並能進行精化來很好地利用隨需應變的網格技術。
  18. Application of differential global positioning system in reservoir capacity measurement at hydropower station

    技術在水電站庫容測量中的應用
  19. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少水庫庫容淤積損失,加大排沙量,會造成在發生洪水時期水庫內含沙量加大,抽水時會有更多的泥沙過機,機組因泥沙而磨損。
  20. The reasons of wreckage of the reservoir are as follows : the inadequate, inefficient and outdated information about the reservoir, the lower anti - flood standard and the supervisor ' s ignorance of the reduction of reservoir capacity owing the a accumulated soils over years. so setting up the 3d model of danjiangkou reservoir : and mastering relevant information on water resources matter significantly not only to the dispatch and regulation of danjiangkou reservoir, but also to the forthcoming project of " water in the south to the north "

    水庫失事的原因多為:水文資料不足和未及時掌握水庫有關的水文資料,信息滯后,選用的防洪標準偏低;運行多年,庫內泥沙淤積使有效庫容大幅度減少而管理者對此又未及時掌握等。可見建立丹江口水庫三維模型,及時掌握有關水文資料,不僅對丹江口水庫的調度和管理,而且對即將實施的南水北調都有著深遠的意義。
分享友人