reservoir water supply 中文意思是什麼

reservoir water supply 解釋
水庫供水
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • supply : vt ( plied) 供給;供應;配給;補充,填補,彌補(不足、損失等)。 Cows supply us (with) milk ...
  1. Additionally in 1939, the government added filter beds to the aberdeen lower reservoir. due to these improvements, the network of water supply was further widened and even remote areas, such as ap lei chau, could receive fresh water

    政府並於1939年,在鴨利洲及香港仔下塘各增建濾水池,使水塘的供水能伸延至鴨利洲一帶的偏遠地區,供水網路得以擴張。
  2. As the valley was situated in a high area, the water supply scheme utilised gravity flow. however, the reservoir had a small capacity of just 27 million gallons, only 38 % the size of its pokfulam counterpart

    由於峽谷位處高地,供水方法仍可以利用水向低流的原理,讓水塘存水順勢流往山下區域,省去興建抽水站的工程。
  3. Nilometer is widely used in the system of automatic detection and automation in many water supply such as oil industry, chemical industry, metallurgy industry, electric power, irrigation works, reservoir, bulk plant, pumping station, towns water and so on. and it is a important tool in these fields

    水位、閘位計廣泛應用於石油、化工、冶金、電力、水利、水庫、油庫、泵站、城市供水等領域的自動檢測和控制系統中,是這些領域不可缺少的一種重要工具。
  4. The result of a case study demonstrates that the proposed flood limit water level of biliuhe reservoir can go up suitably, along with the step - by - step raise of water supply

    計算結果表明,隨著大連市用水量的增加,碧流河水庫汛限水位可適當抬高。
  5. The tai po water treatment works together with the butterfly valley primary service reservoir in kowloon and the 12km long treated water aqueduct connecting the two waterworks form the tai po water scheme. this is one of the biggest water supply projects that the water supplies department ( wsd ) has undertaken in recent years

    大埔濾水廠連同九龍的蝴蝶穀食水主配水庫,以及連接濾水廠和配水庫的十二公里長食水輸水管道,組成大埔濾水廠供水計劃,是水務署近年來進行的其中一項最龐大的供水工程計劃。
  6. In this paper the present situation of water supply source and the existing problem in shangzhou city is analyzed, and the countermeasure is advanced to intensify the unified management of water resource, to develop the surface water of erlongshan reservoir and improve the utilization efficiency of water resource

    本文分析了目前商州市城區供水水源現狀及存在問題,並提出了加強水資源統一管理、開發二龍山水庫地表水、提高水資源利用率等解決對策。
  7. The heiquan reservoir is the key project for the irrigation of huangshui river base and the water supply of xinin city

    黑泉水庫是為解決湟水流域灌溉和西寧市供水問題而興建的大型水利樞紐工程。
  8. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  9. As they were situated directly in the proposed reservoir site, they were resettled in tai long wan, a western coastal area of lantau island and a resettlement area in tsuen wan. others, whose land was included as part of the catchment area, or affected by the construction of the catchwaters, faced a different situation. among them, the residents of pui o including lo wei village and sun wei village, ham tin, law uk, san shek wan, upper cheung sha and lower cheung sha village, tong fuk and shui hou village suffered from disturbance to their natural water supply

    一些被興建引水道影響或被辟為集水區的村落,如貝澳老圍村、新圍村、咸田村、羅屋村、散石灣、長沙上村、長沙下村、塘福村及水口村,原來流經村落的河流及地下水源,因主要水流被引水道堵截,農田無足夠水灌溉,早造開耕嚴重不足,居民須往他鄉運水,以應付日常生活急需及維持灌田。
  10. Sprayed concrete applied to inlet consolidation of water supply tunnel in dongfeng reservoir reservoir

    噴射混凝土在東風水庫輸水洞進口加固工程中的應用
  11. The existing reservoir water - supply operation rules focuses on the single water supply, paying little attention to multipurpose water supply with different priority and reliability

    摘要已有的水庫供水調度規則研究偏重於單一目標供水,對于有著不同優先級和保證率的多個供水目標的研究不足。
  12. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水庫工程供水系統則可挑選運行費用低的、入庫水量較多的某個水庫,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。
  13. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  14. The reservoir water supply contract differs from contract for water supply in contract law and conveyance of water right contract

    水庫供水合同區別于合同法中的供用水合同和水權轉讓合同。
  15. The characteristic of public benefit determines that the reservoir water supply contract has special nature in contract party, terms, performance of contract and contractual liability

    水庫的公益性使水庫供水合同在合同主體、內容、履行、免責事由上都具有獨特性。
  16. The result is of importance significance for the reliability of water supply during irrigation periods and the control methods of reservoir operation based on the concept of pollutant sluicing before water supply

    對以後農業灌溉期水庫供水安全保障措施實施以及「先沖污后供水」的水庫供水運行調度方案制訂,具有重要的指導意義。
  17. The author defined the risk of water supply in plain reservoir through the probability if the water demand is bigger than project ' s carrying capacity, and elaborated the risk analysis of water supply source system and the simulation method

    以供水工程承擔的供水外來負荷大於工程本身的承載能力的概率定義了平原水庫供水水源系統的風險,闡述了供水水源系統風險分析及模擬方法。
  18. Considering natural and social characteristics, the ecological restoration of water and soil conservation is proposed for rivers, reservoir entrance and reservoir region to purify water and ensure sustainable development of water supply

    結合水庫水源地的自然、社會特點,提出對保護區內澗河、入庫口門、庫區等處及水土保持生態修復的設想,使水體水質得到凈化,進而保證水庫供水的可持續發展。
  19. Introduction of yingnahe reservoir water supply project headquater in dalian

    大連市引英入連應急供水工程指揮部
  20. Primary service reservoir water supply

    主配水庫
分享友人