reservoir water 中文意思是什麼

reservoir water 解釋
熱儲水
  • reservoir : n. 1. 貯藏所;貯氣筒;貯水池,水庫;貯水槽,水槽;貯存器;貯油器,油筒,油箱;貯墨管;【解剖學】貯液囊。2. (知識、精力等的)貯藏,蓄積。vt. 貯藏;在…設貯藏所[貯水槽]。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. Erlongshan reservoir water quality was evaluated for class and class by monitoring continuously indexes and was unable to meet the requirement of central drinking water source due to higher cod ( subscript mn ), tn and tp and eutrophic environment

    摘要連續監測和分析了二龍山水庫的水質,對水污染程度進行了評價,水庫高錳酸鹽指數、總氮和總磷超標嚴重,呈現富營養化狀態,總體水質為類和類,已無法滿足集中式生活飲用水水源地的水質要求。
  2. Baf has many advantages, such as small volume, little covering earth and hydraulic retention time ( hrt ), high treatment efficiency and effluent water quality, low investment and running cost etc. baf has been used widely for many years in the world and been used to treat several wastewater in our country. in this paper, baf was studied on guanting reservoir water source treatment with pilot scale and homemade expanded clay as filtration media

    曝氣生物濾池( biologicalaeratedfilter ,簡稱baf ,或biologicalfiltrationoxidizationreactor ,簡稱biofor )工藝具有體積小、容積負荷高、水力負荷大、水力停留時間短、所需基建投資少、處理出水水質好等特點,國外已廣泛應用,國內也在多個行業的水處理中成功應用。
  3. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司馬、旗嶺、馬灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘壩和八級抽水站。
  4. Based on the study of the engineering geological conditions, using fem method to calculate the baseground stress distribution of bridge pier and analysis the stability of slope under different conditions, such as, reset condition, under the bridge load and affected by the changing reservoir water level

    在對橋址區工程地質條件研究的基礎上,採用有限元法方法計算了橋荷載施加前後及水庫水位變動情況下橋址區斜坡應力分佈特徵,並對斜坡穩定性進行了分析。
  5. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽水庫蓄水后,滑體內的地下水位將明顯抬高,庫水以下的滑帶力學參數會進一步降低,受滑體內地下水揚壓力及水庫水位降落時滲透壓力的影響,四道溝滑坡在控制工況下可能整體失穩。
  6. Overall investigation of physiochemical features and biological factors of reservoir water quality were conducted in daoguanhe reservoir from 1999 to 2002. at the basis of these investigations, integrate evaluation of trophic state and environmental status was made. theoretical base for the reasonable utilization of fishery resource and ecological management of environment were provided using bio - manipulation technique and ecoenergetics means

    1999 ? ? 2002年全面調查了武漢道觀河水庫的水質理化特性和生物因子,在此基礎上綜合評價了水庫的營養狀態和環境現狀,並利用生物操縱技術和能量生態學手段,為水庫漁業資源的合理利用和漁業環境的生態學管理提供理論基礎。
  7. The existing reservoir water - supply operation rules focuses on the single water supply, paying little attention to multipurpose water supply with different priority and reliability

    摘要已有的水庫供水調度規則研究偏重於單一目標供水,對于有著不同優先級和保證率的多個供水目標的研究不足。
  8. Abstract : based on the investigation of the engineering geological environment and the displacement monitoring of no. 2 landslide at jindong town, the landslide revival mechanism with the relationship of the landslide revival with the human s engineering activity which included mining gold, evening ground for building, ascending and descending of the reservoir water are discussed

    文摘:在對廣元市金洞鄉號滑坡的工程地質、地質環境進行詳細研究和對滑坡復活變形進行監測的基礎上,論證金洞鄉號滑坡復活變形與採金、建鎮平場、庫水消漲等人類工程活動之間的相互關系及其復活機制。
  9. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水庫工程供水系統則可挑選運行費用低的、入庫水量較多的某個水庫,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。
  10. Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks

    水庫水位浸潤線標高和殘坡積土與基巖接觸界面標高較接近,而使此高程的防滲能力更加薄弱,這也是此壩體的隱患之一。
  11. During the process of modeling, three conditions of reservoir water level ' s ascending, slowly descending and sharply descending are considered

    模擬過程中分別考慮了庫水位上升、庫水位緩慢下降和庫水位驟降三種工況條件。
  12. Special water and soil conservation areas, water source, water quality, water quantity protected areas, and important reservoir water collecting areas shall be avoided

    八、避免位於特定水土保持區、水源、水質、水量保護區或重要水庫集水區?圍內。
  13. The reservoir water supply contract differs from contract for water supply in contract law and conveyance of water right contract

    水庫供水合同區別于合同法中的供用水合同和水權轉讓合同。
  14. The characteristic of public benefit determines that the reservoir water supply contract has special nature in contract party, terms, performance of contract and contractual liability

    水庫的公益性使水庫供水合同在合同主體、內容、履行、免責事由上都具有獨特性。
  15. According to the relationship between different sensitive degree of monitoring displacement and quantity of monitoring information, the sensitive zones of displacement to the fluctuation of reservoir water level are divided into different degrees by the approach of fuzzy pattern recognition

    根據位移的變化對庫水變化敏感程度的不同與監測信息量獲取大小的關系,採用模糊模式識別方法對三峽庫區水庫型滑坡位移場變化對水庫水位變化的敏感程度進行數值分區。
  16. The dam protected height is determined as 15m higher above reservoir water level during initial reservoir impounding period in order to preventing surge damage caused by landslide

    李家峽水電站壩前號滑坡屬有蠕滑活動的老滑坡,體積為1845 104m ~ ,為預防滑坡涌浪危害,初期蓄水期間壩前設防高度15m 。
  17. When analyzing network ' s capability, the new method and the method based on conventional bp algorithm are respectively applied to predicting reservoir water saturation in lin pan - shui oil field. the result shows that the former is more improved than the latter in the convergent speed and the error precision

    在進行性能分析時分別用新方法和基於傳統神經網路的方法建立臨盤水油田儲集層含水飽和度預測模型,前者比後者在收斂速度和誤差精度上有較大的提高。
  18. Secondly, to analyze seismic response of the concrete gravity dam, subspace iterative method was applied to compute free vibration period of the dam, time integration method was built up for the seismic time history analysis and formulation of coupled vibration of reservoir water and dam were also deduced

    其次,針對混凝土重力壩的地震響應分析問題,採用子空間迭代法計算了大壩的自振周期,建立了地震時程分析的逐步積分方法,並且推導了庫水和壩體耦合振動的理論公式。
  19. The method is applied to constructing the prediction model of the reservoir water saturation in logging interpretation of oil field

    應用該方法建立了油田測井解釋中儲集層含水飽和度的預測模型。
  20. Model test study on landslide under rainfall and reservoir water fluctuation

    雨水及庫水作用下滑坡穩定模型試驗研究
分享友人