rib steel 中文意思是什麼

rib steel 解釋
肋鋼
  • rib : n 1 【解剖學】肋骨;【烹】排骨。2 (船等的)肋材;(葉)主脈;葉肋。3 (昆蟲的)翅脈;(鳥的)羽...
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  1. New type of steel bifurcation with inner crescent rib

    內加強月牙肋鋼岔管新型結構
  2. The cyclo - hoop effect which steel tubular has exert to the concrete shows the character of heterogeneous in the arch rib section, the same to the axial direction. the paper verifies the change of the material poisson ration and the concrete grade will make the cyclo - hoop effect obvious alteration, the change of the cyclo - hoop effect and the stress redistribution of the section produced by the shrinking and creeping of the concrete and the expensive concrete on the section

    在鋼管混凝土拱肋斷面上,鋼管對內填混凝土的環箍效應具有非均勻性,在拱軸方向上環箍效應也呈現非均勻性。驗證了材料的橫向變形系數、混凝土標號等參數的變化將引起環箍效應的明顯改變;混凝土的收縮、徐變和膨脹混凝土的應用導致鋼管混凝土的環箍效應發生變化並使截面的應力發生重分佈;並總結了其變化的基本規律。
  3. Based on the former overseas and domestic study on the sheeting diaphragms effect of fender structure, the " rib - diaphragm " shear model is applied to multi - story steel structure according to its character in this paper, and the result is satisfactory

    本文結合國內外對鋼結構圍護結構蒙皮效應的研究,針對多層鋼結構側移的特點,將「肋-板」結構的抗剪單元應用在多層鋼結構的框架當中,取得了很好的效果。
  4. Abstract : experimental researches on normal section ultimate fle xural strength of prestressed reverse - rib - slab with excessive steel bar were m ade, and according to chinese norm ( gbj10 - 89 ) and american norm ( aci ) in which s train harmony analysis method was adopted, its ultimate strength was calculated, these make us further realizse the ultimate flexural strength of prestressed r everse - rib - slab with excessive steel bar

    文摘:通過疊合結構中預應力超筋倒肋薄板正截面極限承載力的試驗研究,分別採用規范gbj10 - 89中的受彎構件、偏心受壓構件的計算公式及美國aci規范中的應變協調分析方法計算了極限承載力,從而更清楚地認識了配有高強鋼絲的超筋倒肋板的極限承載力計算問題。
  5. Abstract : based on the analysis of influence of tubular rib construction on heat transfer area on steel blank and heat transfer space in furnace, a t - shape support system for tubular rib is presented, by which the construction of wholly overhead furnace hearth can be realized for large and medium scale continuous reheating furnaces, making furnace gases to come into full contact with steel blank, raising space utilization ratio of furnace chamber and improving heat exchange

    文摘:分析了爐筋管結構形式對傳熱空間、坯料受熱面積的影響;提出採用t形支撐技術優化爐筋管,可實現大、中型連續加熱爐的全架空爐底,使爐氣與坯料表面充分接觸,提高爐膛空間利用率,可較大幅度提高爐膛熱交換。
  6. This paper introduces the development and present situation of concrete - filled steel tube arch bridge in the world ; generally analysis the mechanism, construction technology, construction equipment of the job practice ; advance the entire scheme of the long - span concrete - filled steel tube arch rib construction ; at last give the analysis the concrete scheme of the concrete - filled arch rib construction. this paper declares the reference value of the study through the above

    本文介紹了國內外大跨度鋼管混凝土拱橋主拱肋施工的發展和現狀;綜合分析了拱橋施工的機理、技術和設備情況;提出了大跨度拱橋主拱肋施工的完整解決方案,最後通過具體橋梁施工方案的設計分析,說明了本項研究成果的現實參考價值。
  7. Steel forgings ; design of drop and press forgings ; machining allowances, drafts, edge radii, fillet radii, base thicknesses, wall thicknesses, rib widths, and rib radii

    鋼鍛件.落鍛和壓鍛設計.第2部分:加工余量拔模斜度
  8. Experimental study on mechanic behaviors of concrete - filled steel tubular rib arch under in - plane loads

    鋼管混凝土肋拱面內受力全過程試驗研究
  9. Thus it is necessary to study moment resistance, rotation stiffness and rotation capacity of the joints. in this paper, six specimens on end - plate composite beam - to - column joints and two specimens on end - plate composite beam - to - column joints were designed to subject to static load. the factors of m - characteristics about semi - rigid composite joints, including bolts, profiled steel sheeting, beam, column, stiffen rib and reinforcement, are studied

    本文設計了6個端板型鋼-混凝土組合樑柱節點與2個端板型純鋼樑柱節點,通過對這些試件的靜力荷載試驗,重點研究了端板型鋼-混凝土組合節點的彎矩-轉角性能的影響因素,包括高強螺栓、壓型鋼板、型鋼梁、型鋼柱、加勁肋,以及混凝土板內縱向鋼筋配筋率等。
  10. This paper applies nonlinear finite element program bsnfem to analyze the behaviors of eccentrically braced steel frames under cyclic load. the study that comprehensive and systematic analyze the factor of links length, thickness of links flange, distance of links rib, thickness of links rib and angle of brace to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel frames have been some studied before. this paper fills the black in the filed factor of high - span ratio, brace stiffness and brace - to - beam connections to be changed affect energy - dissipation capacity of d shape and k shape eccentrically braced steel trames and any factor to be changed affect energy - dissipation capacity of y shape eccentrically braced steel frames

    對耗能梁段的長度、耗能梁段腹板的厚度、耗能梁段翼緣的厚度、耗能梁段加勁肋的間距、耗能梁段加勁肋的厚度、支撐的夾角等因素的改變對d形、 k形偏心支撐鋼框架耗能的影響,前人已有一些研究,本文對這些因素的影響進行了全面系統的分析,完善了理論分析的不足;而結構高跨比、支撐剛度、支撐與梁的連接形式等因素對d形、 k形偏心支撐鋼框架破壞機理的研究以及各種因素對y形偏心支撐鋼框架破壞機理的影響,則很少有人涉及,本文對此也進行了深入系統的分析,填補了這一研究空白。
  11. Asymmetric construction of steel pipe concrete arch rib tied arch bridge

    鋼管混凝土拱肋系桿拱橋不對稱施工
  12. Detection of arch rib concrete density of a concrete - filled steel pipe arch bridge

    鋼管混凝土拱橋拱肋混凝土密實性檢測
  13. Construction technique of back pouring of tie rod arch bridge arch rib steel pipe concrete

    鋼管混凝土系桿拱橋拱肋混凝土倒注施工技術
  14. Arch rib is the key point during the process of the long - span concrete - filled steel tube arch bridge construction

    主拱肋施工是大跨度鋼管混凝土拱橋施工的關鍵環節。
  15. It is a top load bridge with a clear span of 288m, which is maximum one of the same structural system in asia. the main arch rib uses 8 steel tube of 920mm joined by web members and transverse truss to form a space truss. the soldier piles on the arch are made of bent frame to make the shape both artistic and novel

    梅溪河大橋為一凈跨達288米的上承式鋼管混凝土拱橋,是目前亞洲同類橋型中跨度最大的橋梁,其主拱肋採用8根920mm的鋼管,通過腹桿及平聯形成鋼管混凝土空間桁架,拱上立柱亦採用鋼管混凝土排架,造型新穎美觀。
  16. Then calculate the member individually, including the calculation of load - behavior capacity, the calculation of high strong bolt with the method of connection with beam, the design method of stiffening rib, etc. the text educed the above - mentioned formula theoretically. 5. linking with windmill flat engineering example in the third youth flat engineering of yi zhuang development area, beijing, it and steel frame constitute the steel frame ? steel shear wall with slit system respectively are analyzed the whole structure by ansys and satwe

    既利用剛度等效的原則,把其轉換為工程計算軟體可以計算的支撐體系,然後對構件進行單獨計算,包括承載力的計算、和梁接合方法? ?高強螺栓的計算、加強肋的設計方法等內容; 5 、帶縫鋼板剪力墻與鋼框架形成鋼框架? ?帶縫鋼板剪力墻結構體系,結合北京亦莊經濟開發區青年公寓三期工程中的風車公寓工程實例,分別採用ansys和satwe進行了結構整體分析,兩者的計算結果相吻合。
  17. The paper puts great emphasis on studying the mechanical performance and the carrying capacity of concrete - filled steel tubular ( cfst ), verifies the cyclo - hoop effect which steel tubular has exert to the concrete in cfst through the tridimensional finite element analysis of the entity of the arch rib, and proves that the cyclo - hoop effect is utilized to increase the axial compression cfst member carrying capacity

    本文著重研究了鋼管混凝土結構的力學性能及承載能力,通過對拱肋實體所作的三維有限元分析,驗證了鋼管混凝土拱橋中鋼管對混凝土的環箍效應,證明了由於環箍效應的存在,使內填式鋼管混凝土軸壓承載力大大提高。
  18. The experimental method of the model test with 1 : 6 scale based on the work mechanism of bearing of steel y - pipe strengthened inside with crescent rib in combination with surrounding rock mass simulated by composite materials is adopted and the regularity of their participant capacity to bear inner water pressure is analyzed in this paper

    摘要本文結合實際工程採用幾何比尺為1 : 6的物理模型試驗方法,用不同材料分層組合模擬圍巖,對水電站內加強月牙肋鋼岔管與圍巖聯合承載的工作機理、圍巖分擔內水壓力的規律進行分析。
  19. Third, a theoretic approach based on total theory of plasticity is for the first time applied to analyze elastoplastic torsion rigidity of the tubular, and the results are well proved by the test data. also for the first time, the plastic stability of the spiral skew stiffening shell is studied. it is shown in the experiments that there is the comparability between the stability of the members at plastic limit and that of the thin - shelled steel tubular with the spiral skew stiffening concrete rib

    本文首次分析了扭轉作用下的螺旋斜向加勁殼的塑性穩定性問題,還根據試驗觀象的觀察,對構件在塑性極限時的狀態,簡化為內壁襯朽螺協剎向加勁混凝土肋的薄壁鋼管的塑性穩定問題,利用塑性殼體穩定理論進行了探討。
  20. Standard specification for closed rib steel pipe with diameter of 36 in. 900 mm or less, polymer precoated for sewers and drains

    排污和排水用聚合物預塗的直徑為36英寸或不足36英寸的閉合肋鋼管的標準規范
分享友人