ring installation 中文意思是什麼

ring installation 解釋
安裝活塞環
  • ring : n 1 圈,環,輪;戒指,指環,耳環,鼻圈,鐲子(等);【運】吊環。2 輪狀物;【植物;植物學】年輪;...
  • installation : n. 1. 就職,就任,就職禮。2. 裝置,設備。3. 安裝;設置;安置。4. 軍事設施。
  1. High integrity shutoff gate valves can be used for hot tapping or in pipeline services where a soft pig is used if the seat ring installation lugs are removed

    高度完全關閉閘閥可以用在熱水龍頭,或拆卸閥座環安裝吊耳後,用在採用軟鐵塊的管路中。
  2. Position the fuser film sleeve into heater, and the end of the film with ground ring should be in good contact with the conductive rubber gear of pressure roller or the conductive brush after installation

    請在安裝新定影膜前,在塑料架與定影膜接觸的部位均勻塗上硅脂,盡量在有棱的地方多塗點,以保證定影膜與塑料架的充分潤滑。
  3. Aerospace series - studs, in titanium alloy ti - p64001, with serrated locking ring in corrosion resisting steel - installation and removal procedure

    航空航天系列.鈦合金ti - p64001制帶鋸齒型鎖環的耐腐鋼螺柱.安裝和拆卸程序
  4. The gauges can be supplied with a cover ring, triangular front ring or mounting flange as required for the installation conditions

    根據不同的安裝條件,我們為壓力表配備了一個蓋墊圈一個三角外圈或裝配法蘭。
  5. The gauges can be supplied with a rear mounting bracket, cover ring, triangular front ring or front mounting flange as required for the installation conditions

    根據不同的安裝條件,我們可以提供一個后裝配支架一個蓋墊圈一個三角外圈或前裝配法蘭。
  6. Pipes and fittings of unplasticized poly vinyl chloride with ring seal socket for non pressure underground drainage and sewerage - part 3 : quality control and installation

    非壓力地下排水和污水排放用帶環形密封承口的硬聚氯
  7. Precompressed rings. each braided graphite ring is preformed and compressed to 4, 000 psi ( 275 bar ) at installation to ensure extreme tightness at high packing strain

    預壓環。每個辮狀石墨環在安裝時都經過預制和在4 , 000psi ( 275bar )壓力下壓縮,以保證在包壓應變下保持最大的緊固。
  8. The widely differing conditions governing installation, particularly in the case of the ring shaped load cells, will often require different designs of casing and fastenings

    尤其是對于環形壓力測量元件,控制安裝的條件如存在巨大差異,則通常要求不同的外殼和緊固件設計。
  9. Works were completed including lamp installation for road b2 and b6, revamp and lamp installation for lake - ring road, civil works of 2 public wcs and refuse station

    全面完成了b2 、 b6道路路燈建設工程、環湖路改造和路燈安裝工程、經開園兩座公廁垃圾站土建已完成。
分享友人