rock above water 中文意思是什麼

rock above water 解釋
明礁
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • above : adv 1 在上面;在頭上;【宗教】在天上。 in the room above 在樓上房間里。2 上級;(河)上流;以上。...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. He landed on a flat rock that jutted above the surface of the water.

    他跌落在一塊突出水面的巖石上。
  2. Based on the above, another mathematics model for calculation about saturation index ( complex compounds considered / unconsidered ) which can reflect water - rock interaction ' s state has been built up, moreover newton - raphson which is a iterative way has been used to resolve the mathematics model, the results show that si ' s value accord better with practice when complex compounds are considered.

    在此基礎上,建立了旨在反映水-巖(或礦物)系列間反應狀態的飽和指數si的數學模型,採用newton - raphson迭代法進行求解。在計算中,分別考慮絡合物的影響和不考慮絡合物的影響。結果表明,基於考慮絡合物的影響所求得的si值比較符合實際。
  3. The theoretical analysis shows that any human activities, responsible for the changes of rock, air, water, soil and biology inside or outside the caves, will influence inevitably cave animals in terms of such levels as molecule, cell organelle, cell, tissue, organ, system, individual, population, society and ecosystem. these effects can be observed on cave animal ' s shape - building, activity, tissue structure, metabolism, space - time distribution, biothythm, structure of population and society, food chain, bio - relation, diversity of population and society, and function of the above - mentioned levels

    理論分析表明,凡是能夠引起地表和洞穴巖石、空氣、水、土壤、生物等變化的一切人類活動都不可避免地使洞穴動物在分子、細胞器、細胞、組織、器官、系統、個體、種群、群落和生態系統各級層次上產生效應,這些效應具體表現在影響洞穴動物形態建成、行為、組織結構、新陳代謝、時空分佈、生物節律、種群和群落結構、食物鏈結構、生物關系、種群和群落多樣性以及各層次所表現的功能的多少、快慢、強弱等方面。
  4. The worked surface is approximately 2m above the highest water mark, which is a rather low position compared to similar rock carvings

    石刻離開最高水位約二米,就同類型石刻的位置而言,這是一個頗低的位置。
  5. Ay, there's the rock, showing its chin above the water.

    啊,原來這塊礁石在這兒哪,它從水底伸出了脖子。
  6. Article 34 in the case of earth - fetching, sand - digging or quarrying in areas in danger of land - collapsing or land - sliding or where mud - rock flow is liable to occur, as designated by the local people ' s government at or above the county level, the department of water administration under the people ' s government at or above the county level shall order the cessation of the above law - breaking acts and the adoption of remedial measures, and shall also impose a fine

    第三十四條在縣級以上地方人民政府劃定的崩塌滑坡危險區、泥石流易發區范圍內取土、挖砂或者採石的,由縣級以上地方人民政府水行政主管部門責令停止上述違法行為、採取補救措施,處以罰款。
  7. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  8. Due to the contribution of matrix suction to the shear strength of rock mass and the harmful function of temporary additional water load are considered, the checking computation result of the above mentioned method conforms to reality better than those of the previous methods

    該程序考慮了非飽和帶基質吸力對巖體抗剪強度的貢獻以及暫態附加水荷載的不利作用(若具備含水量與巖體強度指標之間的關系,還能考慮水對巖體的軟化作用) ,使計算結果更貼近實際。
  9. A plank - paved roadway was built some 1, 000 years ago above water and beneath the rock for salt and rice transport

    古淺道建於長江水位以上,已有1000年的歷史了,古淺道主要用作運輸食鹽和穀物的通道。
  10. The darker rock on the left appears to have always been above the water line, even before the drought began

    左邊顏色較深的看來即使在乾旱發生之前也一直都在水面上。
  11. The moon had risen, and its light was already glancing here and there on the water above them; but the extremity of the rock where they stood still lay in shadow.

    月亮已經升起來了,在他們的上游,水面上到處閃爍著月光,但是在他們站立著的巖石附近還被罩在陰影之中。
分享友人