rock cut 中文意思是什麼

rock cut 解釋
巖石掘進
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • cut : vt (cut; cutting)1 切,割,截,斬,砍(樹),剪(發等);切斷,割下;採伐;剪下;修剪,刈。 I h...
  1. In the northern tract of the scablands, the water cut backward into the rock and caived the grand coulee, a gorge twice as high as niagara ' s and several times wider

    在疤地的北部,洪水回切人巖石,削刻出大峽谷,有尼亞加拉的兩倍高,好幾倍寬。
  2. Now curling stones are cut from hard rock, rounded and polished, and fitted with a wooden handle

    與過去不同的是,現在的溜石用硬性巖石製成,磨得又圓又滑,還配有一個木製的把手。
  3. Geochronology research on the volcanic rock profile of the gazha cun group in the wuyii basin indicates that the 40ar - 39ar age of the post - collision volcanic rock is 12 - 14ma. and the granite that cut the volcanic rock is 10. 84ma

    羊應鄉火山巖樣品中透長石及黑雲母的~ ( 40 ) ar - ~ ( 39 ) ar定年結果確認該區存在後碰撞火山巖,其噴發年齡在11ma左右。
  4. Adopting the rhombus cut and the mid - deep - hole smooth blasting technology to realize fast heading in rock drift

    採用直眼菱形掏糟中深孔爆破技術實現巖巷快速掘進
  5. Discusses the optimizing process of treatments of the main technical problems, which include the construction schedule, the field plan and t he balance of earth and rock works, method of the river closure and cofferdams sections, procedure and time of the river colsure, form of the cutoff, construct ion of the cut - off walls

    論述了三峽大江截流及二期圍堰實施過程中的施工進度計劃、料場規劃與土石方平衡、截流方式與圍堰斷面形式、截流進占程序和時段、防滲形式、防滲墻施工等主要技術問題的優化完善過程
  6. If the charge used is too large, the rock can become sintered so that the cut used is a failure.

    如裝藥量太大,巖石就會擠死,使掏槽失敗。
  7. And they re words we need to hear. because a rock is something that is seen and heard throughout the bible. in the very beginning when god starts to make himself known to abraham, he tells him to use a rock, an unhewn rock, one that is not cut

    這是我們要聽到的話,因為我們經常在聖經中聽見磐石,在起初神跟阿伯拉罕介紹自己,便叫阿伯拉罕用磐石,就是未經雕琢完整的石做壇來獻祭。
  8. And build an altar unto the lord thy god upon the top of this rock, in the ordered place, and take the second bullock, and offer a burnt sacrifice with the wood of the grove which thou shalt cut down

    26在這磐石(原文作保障)上整整齊齊地為耶和華你的神築一座壇,將第二隻牛獻為燔祭,用你所砍下的木偶作柴。
  9. This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided

    故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明挖隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。
  10. S went and cut the strongest olive - tree he could find, stripped off its branches, inserted it in the hole, and used it as a lever. but the rock was too heavy, and too firmly wedged, to be moved by any one man, were he hercules himself

    在十分鐘的勞動之後,這道墻屈服了,露出一個可以伸進一條手臂的洞口,唐太斯砍斷了一棵他所能找到的最結實的橄欖樹,削丫枝,插入洞里,把它當撬棒用。
  11. The geologic condition in mountainous district is complex variable, in different geologic, it is very difficult to find the most economically design scheme. stability of 14 high - cut slopes in guangdong province is analyzed with typical rock mass structure analysis method and stereographic projection method, and with the numerical simulation method udec this paper simulated the excavation and reinforcement courses of the important slopes. some conclutions and suggestions are based the analysis above

    本文結合廣東某省道沿線14個高陡巖石邊坡的開挖和支護方案的選擇設計,運用常用的巖體結構分析方法和赤平投影方法對邊坡的穩定性進行了分析,採用udec數值模擬方法對一些重點邊坡的開挖支護進行了模擬,得出了以下一些結論: 1 、邊坡支護形式的選擇應遵循「安全綠色、水土保持、恢復自然、環保之路」的設計原則。
  12. According to the geological data which was gained by exploration investigation, establishing a geological model which can reflect rock mass characteristics ; with analyzing the internal and exterior factors synthetically, the deformation and possible failure mechanism and mode of the cut slopes was confirmed which combines with stereoic projection and other techniques ; the stabilities of the 14 high slopes are estimated synthetically by applicable design codes and guidelines. with the estimate result and some other analysis methods, the rock mass mechanical parameters of slope are identified ; as a results, 14 high slopes fall into 4 categories based on rockmass characteristics and discontinuities. the stability and deformation of some typical slopes was analyzed with distinct element method by udec ; the safety factor of some dangerous slopes are calculated by rigid limiting equilibrium method for comparison

    首先著重研究影響邊坡穩定性的內在因素,主要是通過地質勘探、測量、現場觀測等手段取得研究區地質體的基礎地質資料,建立起能夠反映地質體結構特徵的地質模型;隨后綜合分析潛在的內外部影響因素,並結合赤平投影對邊坡可能的失穩模式或破壞機製作出判斷;運用已有巖體質量分類方法對沿線14個高陡邊坡穩定性進行初步的評價,並結合試驗研究、經驗判斷、工程類比等手段確定了坡體的巖體力學參數;根據穩定性初步評價結果將研究區14個高陡邊坡按開挖方式分為4大類,並利用離散元程序udec對各類典型高陡邊坡進行了穩定性計算分析;對潛在危險邊坡利用剛體極限平衡法求出了不同工況下的安全系數。
  13. It will lengthen as a result of headwater erosion and, thereby, will cut a valley through both hard and soft rock.

    由於向源侵蝕的結果,它不斷延長並且穿過軟硬巖石從中切出一條河谷來。
  14. Abstract : this paper gives the fe simulating analysis of the effect on road construction in the process of mine open - cut, analysis and evaluates stability of road foundation during many rock material steps excavation, concludes that the different conditions, for example, the rock caves, steps and the dis tance between the steps and road have influence on the road foundation stability

    文摘:針對礦山在地下開采轉為露天開采過程中,原地采區域在露天采場臺階開挖過程中對露天采場公路建設及運營的影響,進行了數值模擬分析,並對通過各種巖體介質的露天采場公路路基在臺階開挖和汽車運營過程中的穩定性進行了分析評價,得出了在不同條件下,如空洞地區、臺階材料介質、材料界面、開挖臺階與公路距離等對路基穩定性影響的評價。
  15. Rock cut slope

    切割石坡
  16. The author in this paper through studying comprehensively the high rock slope of k32 and k34 in jing - zhu express highway. assesses and analyzes the stabilizing ability of the high rock cut slope, analyzes and decisions the current situation and the trend of the stabilization ability and the reinforcement types, optimizates design and construction parameters, concludes the study results of optimizating design and construction of high rock slope in express highway

    本文通過對京珠高速公路湖北大悟段k32和k34公里巖石高邊坡進行綜合研究,評價分析了巖石高邊坡開挖后的穩定性;分析確定了高邊坡穩定性現狀和變化趨勢及加固形式;優化了設計和施工參數,總結出了高速公路高邊坡優化設計和施工的研究成果。
  17. The persian faravahar is carved on the rock - cut tombs of the achaemenid kings at bisetoon in iran, and varies from one carving to the other

    波斯人的法拉瓦哈圖案雕刻在石制的阿切曼尼國王墳墓上,位於伊朗的貝撒頓里,這些雕刻各有不同。
  18. On performance of anchor pile in reinforcement of stratified rock cut

    樁加固順層石質路基工作性狀的研究
  19. Construction technique of deep - borehole smooth blasting used in rock cut

    中深孔光面爆破技術在巖巷施工中的應用
  20. Atmospheric pollution surface weathering of rock - cut stone carving in nanxiangtang

    大氣污染對南響堂石窟石雕表面風化的影響
分享友人