rock line 中文意思是什麼

rock line 解釋
巖面線
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. Then following the clew that, in the hands of the abb faria, had been so skilfully used to guide him through the daedalian labyrinth of probabilities, he thought that the cardinal spada, anxious not to be watched, had entered the creek, concealed his little barque, followed the line marked by the notches in the rock, and at the end of it had buried his treasure. it was this idea that had brought dant

    唐太斯根據法里亞神甫囑咐他的方法認真推敲手中的線索,他想,紅衣主教斯帕達,為了不讓別人發現他的行動,曾到過這個小灣,把他的小帆船藏在裏面,然後從山峽中循著留記號的這條小徑走,在小徑盡頭的大巖石處埋下了他的寶藏。
  2. Under the guidance of the theories of sedimentation, paleontology, stratigraphy, reservoir geology and digenesis, synthetically applying the methods of the conjunction of spot - line - surface, macro - microscopic and field - indoor, there is a comprehensive study for the upper permian series in stratum, rock, sedimentary facies and diagenesis, especial for the type and characteristics of sedimentary facies, in the paper. based on the above, the vertical evolutionary model of the sedimentary environment is explained by the study of the elevation profile and transverse profile and the regional geological characteristics

    本文主要是以沉積學、古生物學、地層學、儲層地質學等相關理論為指導,運用點線面、野外與室內、宏觀與微觀相結合的方法,並藉助普通顯微鏡、陰極發光顯微鏡等手段對川西地區北部上二疊統的地層、巖石、沉積相以及成巖作用進行了研究,尤其是對沉積相的類型及特徵作了詳細的劃分與闡述。
  3. However geological information is fully recorded in the remote sensing image, which made it possible for the choosing of this area as a dissection point to extract complex structural information of orogenic belt in west china. taking fully advantage of multi - band image richly bearing concealed geological information in combination with remote sensing analysis and structure analysis, to anatomy the supracrustal composition and structure of orogenic belt with the regional linear structures and their partitioned block and schistous geological masses as the macro - frame ( in corresponding to structure units and structure segments ) and with the rock masses, structure - rock assemblages, line - featured and belt - featured structures as well as penetrative and non - penetrative foliation ( primary stratum and trans position layering ) and folds as the texture and structure elements. the methods of how to distinguish granulite > ductile - shear zone, imposed fold, different deformed belts -

    因而,本文選擇這一地區作為我國西部地區從遙感圖像上提取造山帶復雜結構構造信息的解剖區,充分利用遙感圖像多波段反映物質屬性的特點和圖像處理提取隱含信息的優勢,採用遙感解析?構造解析相結合的研究方法,以區域線狀構造及由它劃分的塊狀、片狀地質體為宏觀骨架(對應于構造解析劃分的構造單元、構造均勻區段) ,以地質體中的巖石巖體、構造巖石組合,線狀、帶狀構造,透入性、非透入性面狀(原始層理、新生面理)和褶皺等構造作為用於解析的結構構造要素,進行造山帶表殼組成和結構構造解析研究。
  4. The study and treatment of the unstable rock imperils of the provincial road line s

    211線危巖病害的研究及處治
  5. The anchor line fouled on a rock

    錨索纏在一塊巖石上
  6. One of country rock to flash petrochemical industry dolomite rock of dali completely, exploit out with the jade while exploiting, enclosing yu yu s surface, this kind of stone wraps up the stone of the jade and jade boundary line and clear, can separate

    圍巖一種是透閃石化白雲石大理巖,在開采時同玉一起開采出來,附於玉的表面,這種石包玉的石與玉界線清楚,可以分離。圍巖另一種是透閃石巖。
  7. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與隧道洞軸線小角度相交,對隧道圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  8. The investigation and study showed that caused by the influencing factors of unit of tectonics, structures of floor rock stratum, conditions of landform, seismic intensities, fault, thickness of malan loess, the distribution of seismic loess landslides is very asymmetrical, which mainly show shapes of patch, belt, line, and there are different development characteristics in different regions

    現場調查顯示,受大地構造單元、基底巖層結構、地形地貌條件、地震烈度、斷裂構造和馬蘭黃土臨空厚度等因素影響,地震黃土滑坡的展布形態較為復雜,在空間上分佈很不均勻,常表現為片狀、帶狀和線狀展布,並在不同區域有不同的發育特點。
  9. Line oilers for pneumatic rock drills

    氣動鑿巖機用注油器
  10. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在拱頂、右拱肩、右邊墻時對地下洞室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下洞室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下洞室設計原則的幾點新內容。
  11. Fixed protection should be placed on clear rock within the line of climbing

    固定支點應沿著攀登路線,設置於顯見的巖石上。
  12. The essential elements and process of gas reservoir formation of ordovician in ordos basin have been annalysed systematicly and scientificly by means of the theory and method of organic geochemistry and tectonic geology in this dissertation. the several advanced techniques, such as gas generation thermal simulation, on - line individual gas compounds carbon isotope determination ( py - gc - c - ir - ms ), the analysis technique of light hydrocarbons and biomarkers in natural gas, gas migration simulation and gas carbon isotope determination in fluid inclusions, have been applied to focuse on the study of the gas generation mechanism of souce rock, correlation between gas and source rock, reservoir formation history, migration direction, charging road in detail

    應用有機地球化學和構造地質學理論和方法對鄂爾多斯盆地奧陶系天然氣地質研究中薄弱環節成藏要素和作用進行了系統科學分析。利用烴源巖生氣定量熱模擬技術、熱模擬在線碳同位素實驗技術、氣體輕烴和生物標志物分析技術、運聚成藏物理模擬技術和包裹體中碳同位素分析技術等多種先進的實驗技術對烴源巖的生氣機理、氣源和混合比、成藏史、充注路徑、運移方向和構造作用與成藏關系等問題進行了深入的研究,在前人研究的基礎上,經過本次大量的實驗分析和綜合研究,提出了一些新的認識。
  13. The vast controlled rock blasting technology of new double - line railway

    新建鐵路復線大量石方控爆技術
  14. Application on foundation of rock anchorage in projects concerning transmission line

    送電線路工程中巖石錨樁基礎的應用
  15. A heavy surf thundered and burst over an outjutting rock ; lowering storm - clouds covered the sky ; and, outside the line of surf, a pilot - schooner, close - hauled, heeled over till every detail of her deck was visible, was surging along against a stormy sunset sky

    怒濤澎湃,拍擊著一片橫空斜出的峭壁;孕育著風暴的黑雲低垂,布滿天空;浪濤線外一艘領港船正乘風前進,船身傾斜,甲板上的一切都清晰可辨。
  16. The study shows that the most likely sliding path is located shallowly under the rock bed and the sliding path runs close to a line from tensile area at dam heel to dam toe. staircase sliding paths buried less than 14 meters bellow dam heel are also dangerous, but they are not the most dominant

    研究表明,最危險滑移路徑處于壩基面以下淺層,滑移通道為從上游壩踵拉裂區沿近直線方式向下游壩趾滑出;正常蓄水位時, 9b 、 4b壩段最危險滑移路徑安全系數分別為k _ s = 4 . 15 、 3 . 05 。
  17. Beneath his gaze the dew - fogs dipped and crept to the hollow places, then stole away in line and column, holding skirts and clinging subtly at the sheltering corners where rock hung over grass - land, while the brave lines of the hills came forth, one beyond other gliding

    在他的凝視之下,蒙蒙的霧氣緩緩散落潛向谷底,繼而絲絲縷縷地溜走,籠住峭壁,狡黠地隱匿於懸在草地之上的巖石中,隨即群山的雄姿逐漸呈現,山巒也越發清晰。
  18. Basing on the theory of shape geometry, the distribution of rock blasting fragmentation are discussed, fragmentation of blasting experimentation of different charging construction appears shape character, and the relation of explosive ratio, line of weakness and distribution of blasting fragmentation are confirmed by regression, the relation of function of explosive ratio of distant loading and consecutive loading are confirmed by contrasting different distribution of blasting fragmentation of charging construction, a new approach will be put forward for optimized of bore net parameter and forecast of distribution of blasting fragmentation

    回歸分析了爆破試驗的炸藥單耗、底盤抵抗線與爆破塊度分維數之間的函數關系,對比不同裝藥結構爆破塊度的分維數,得出了同等條件下間隔裝藥與連續裝藥炸藥單耗差值的關系,以及裝藥結構對巖石爆破塊度分佈影響的規律。根據對巖石爆破破碎塊度分佈分形規律的研究,找出了預測孔網參數優化、爆破塊度分佈新的途徑。
  19. As one part of the research program of study on reliability of stability of high rock slope and optimization of support, the thesis does further study on blasting and achieves some results as follows : ( 1 ) the interaction of shock wave and explosive gas due to blasting is the important cause to the destroy of the rock. the rock in the line of every hole is easiest to be destroyed while single - row blasting. dynamic loads of blasting can be simplified to triangular loads

    本文作為「巖質高邊坡穩定可靠性與支護結構優化研究」研究課題的一部分,對邊坡工程中的爆破施工進行了深入的研究,主要取得了以下成果: ( 1 )沖擊波和爆生氣體的共同作用是引起巖石破壞的重要原因;單排爆破中炮孔連心線上最容易破壞;爆破動力荷載可以簡化成三角形荷載。
  20. The improper excavating will bear capacity, water permeability, natural structure and geological structure worsenning the base rock of foundation., this ca n ' t be allowed to the water conservancy project building, especially to block water building. lt will not only increase the expenses happened of the remedy measure, but also lengthen building straight line time limit for a project of construction

    開挖不當將降低基巖的承載能力、增大基礎的透水性、惡化基巖的天然結構和地質構造,這對於水工建築物,特別是擋水建築物是不能允許的,同時將會增加採取補救處理措施所發生的費用,延長建築物施工直線工期。
分享友人