rock stress state 中文意思是什麼

rock stress state 解釋
巖石應力狀態
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  • stress : n 1 壓力,壓迫,緊迫,緊張。2 【語音】重音;重讀;【詩】揚音;語勢,著重點。3 重要(性),重點,...
  • state : n 1 〈常作 S 〉國,國家;〈通例作 S 〉(美國、澳洲的)州;〈the States〉 美國。2 國務,政權,政府...
  1. The mechanical index or parameters of rock is similar to those of other materials, they are understood and accepted easily. however geostress is one inner stress stored up in rock mass, it isn " t rock - mass " inhesion characteristics like mechanical index, but it is a mechanical state in rock masses. the stress state is generally different in similar engineering rock mass but in different space

    巖石的力學性質和指標,類同其它材料的力學性質和指標,容易被人們認識和接受;而地應力是蓄存在巖體內部的一種內應力,並不是巖體的一種固有特性,而是巖體中存在的一種力學狀態,同類巖體的地應力狀態因地而異。
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  3. Finally, respect to the beam effect induced by special high ratio of modulus of elasticity of baise gravity dam, the sensitivity analysis are carried out to study the relation among displacement, stress state of dam and rock bed parameters

    最後,針對百色重力壩特殊的高彈模比地質條件所致懸臂效應,對壩體及壩基的變形和應力狀態與壩基力學參數之間的關系進行了參數敏感性分析。
  4. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌結構選型角度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與變形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  5. Main content in simulation is the spatio - temporal evolution of the set of descriptive variables characterizing tectonic mineralization state under coupling of various processes as following : ( 1 ) variables related to forming and property of ore - forming fluid, such as dissolution rate of minerals ( include metal minerals ) in rock, concentration and saturation of aqueous species in fluid, temperature, pressure, and ionic strength etc. ; ( 2 ) variables related to structural deformation and fluid flow, such as stress, deformation rate, fracture network, porosity, fracture permeability ; ( 3 ) variables related to precipitation and mineralization, such as nucleation rate of gangue and metal minerals, accumulation precipitation of various minerals, etc. ; ( 4 ) spatio - temporal coupling relation of various variables above, such as the coupling relationship between spatio - temporal evolution of fracture permeability and flow and focus of fluid and ore - forming

    模擬的主要內容是在各種過程耦合作用下,以下描述構造成礦體系的主要變量的時空演化:與成礦流體的形成和性質有關的變量,如地層中礦物(包括成礦物質)的溶解速率、流體中各組分的濃度與飽和度、流體溫度、壓力、離子強度等;與構造變形和流體運移有關的各變量,如應力與變形速率、巖石孔隙度、構造(斷裂)滲透率等;與沉澱成礦有關的變量,如礦物(金屬礦物和脈石礦物)的成核速率、各礦物的沉澱量等;上述各有關變量間的時空耦合關系,如斷裂滲透率時空演化與流體流動、匯聚和成礦的耦合關系等。
  6. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  7. To control deformation of a deep soft rock tunnel, an engineering experiment of unloading blast in high stressed soft rock was carried out at xieqiao coal mine, huainan mining group corp, which improves fully the stress state of surrounding rock mass and controls effectively the amount of rock deformation and its stable time

    摘要為控制深部軟巖巷道的變形,利用爆破卻壓技術,對淮南礦業集團謝橋礦高應力軟巖巷道進行了爆破卸壓工程試驗,充分改變圍巖應力狀態,使巷道的變形量及穩定時間得到了很好的控制。
  8. On the basis of the site measurement, lab and numerical simulations, it is pointed out that there is usually a broken state zone existed around a deep excavation ; this zone has many special characteristics and is a comprehensive index to represent the action of both earth stress and rock mass strength on the stability of underground projects

    在現場實測、物理和數值模擬的基礎上,提出深埋地下工程的圍巖中普遍存在破裂狀態,並認為這一破裂狀態區域具有許多特殊的性質和規律,是一個反映地應力和巖體強度對地下工程穩定性作用的綜合指標。
  9. Study on the effect of the circulate loading on the young ' s model of rock in a low stress state

    低應力水平下循環載荷對巖石楊氏模量影響的研究
  10. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后圍巖的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的圍巖穩定性,其結果與實際開挖情況基本吻合,針對圍巖穩定性評價的結果,提出了錨固方案,運用等效概化原理考慮錨桿的作用,建立了採用系統錨桿加固后的地下廠房圍巖的三維彈塑性模型,運用非線性有限元分析了加固效果,結果表明錨固作用明顯,圍巖變形明顯減小,圍巖內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  11. The working stress state and the stability of typical blocks of baise rcc gravity dam are computed and studied based on the 3d non - linear finite element method ( fem ) and rigid body - spring element method ( rbsm ). the analysis of failure process, failure mode, failure mechanism of the dam are studied with overload method and combined method in which rock strength parameters are decreased while water load is overloaded to a certain degree. in this paper, the following works are done

    本文充分發揮有限單元法和剛體彈簧元法的優點,對百色rcc重力壩典型壩段( 9b 、 4b )地基穩定安全性進行數值分析和計算,從超載法、綜合法等不同角度,對壩基穩定性開展研究,分析壩體和壩基破壞過程、破壞形態和破壞機理,確定壩基可能的滑動路徑和滑移模式,評價工程的穩定安全性。
  12. Firstly, the displacement, stress, strain fields and the working state of dam body and foundation are evaluated by fem. by overloading the upstream water level and reducing rock strength parameters, the failure process of dam foundation is simulated and the failure mode and paths are determined. the results show that when overload method is used, damaged area develops from up - stream to down stream with failure front stays near the interface between dam body and bedrock

    首先採用非線性有限單元法對壩體及壩基在不同荷載工況下的變位、應力應變狀態展開分析,評價各工況下壩基的運行狀態,而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,追蹤巖體破壞狀態的發展演變過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑。
  13. Abstract : based on the analysis of the main causes of stope chute failure, flac3d numerical calculation software is used in the systematic study of the mechanical state of the surrounding rock before and after the chute reinforcement from the aspects of the stress distribution of rock mass, the plastic fractured region and the movement of rock mass so as to disclose the fracture mechanism of the surrounding rock and the mechanical system of the reinforcement engineering

    文摘:在分析造成采場溜井破壞的主要原因基礎上,應用flac3d數值計算軟體,從巖體應力分佈、塑性破壞區和巖體移動等方面,系統研究了溜井加固前後的圍巖力學狀態,揭示了圍巖破壞機理和加固工程的力學機制。
  14. The result shows : the stress state of rock - bolt can be improved by grouting surrounding rock ; combined whole section bolting - shotcreting - grouting support can improve the stress distribution, and can decrease the size of plastic zone in surrounding rock, resulting in a loop bearing structure near by the periphery of roadway and the long - term stabilization of the surrounding rock

    結果表明:注漿能夠改善錨桿受力狀況;全斷面注漿與錨噴聯合支護能夠改善圍巖應力分佈狀況,縮小圍巖塑性區范圍,在巷道周邊形成圓形承載拱,從而保證圍巖的長期穩定。
  15. The main conclusion made from the test is that the rock mechanics properties are always changed and mainly affected by stress state and saturation of pore fluid during developmentof oil and gas

    指出油氣開發過程中巖石力學性質是不斷變化的,且主要受巖石的應力狀態和孔隙流體含量的影響。
  16. Taking the - 190 level southern roadway in gequan coal mine in china as the object of study, the numerical analysis of stress distribution, plastic zone, displacement of surrounding rock and stress state of rock - bolt under the conditions of both shotcrete - bolt support and combined bolting - shotcreting - grouting support was carried out with udec software

    摘要以葛泉礦190南翼運輸大巷為研究對象,採用udec數值模擬軟體對該巷道在全斷面錨噴支護和全斷面注漿與錨噴聯合支護兩種條件下圍巖應力分佈、圍巖塑性區范圍、圍巖位移和錨桿受力情況進行了分析。
分享友人