roof test 中文意思是什麼

roof test 解釋
屋頂外部暴露於火的試驗
  • roof : n 1 屋頂,房屋;家屋。2 (放行李的)車頂;笠形罩。3 上頜。4 最高部,頂部;【礦物】頂板。5 【航空...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Standard test method for maximum media density for dead load analysis of green roof systems

    新暴露頂層系統靜荷載分析用最大介質密度的標準試驗方法
  2. Embedded development and realization of a rock oil flat roof test - machine

    嵌入式測井平臺測試儀的研發與實現
  3. Roof roadway methane drainage test and its effect analysis

    頂板巷道抽放瓦斯試驗與效果分析
  4. Standard test method for water capture and media retention of geocomposite drain layers for green roof systems

    新暴露頂板系統用土工合成排水層吸水和介質保持的標準試驗方法
  5. Hangzhou grand theater ' s main part is 170m long and 136m wide, and the surface of it is consisted of ellipsoidal surface roof and conical surface gladding. based on wind tunnel test and theoretical analysis, the vibration mechanism, vibration shape, dynamic response and wind load factor of long - span combined structure consisted of ellipsoidal surface roof and conical surface gladding subjected to wind excitation are analyzed systematically in this dissertation, and some valuable results are obtained

    本文採用風洞模型試驗和計算機數值計算相結合的方法,對杭州大劇院大跨度橢球屋蓋和倒圓錐面幕墻組合結構的風振機理、風振形態、風振響應以及風振系數進行了較系統的研究,取得了有意義的結論。
  6. A roof - coal - discharging test mining by predetonation in super high seam

    堅硬頂板特厚煤層預爆破放頂採煤試驗
  7. Standard test method for structural performance of sheet metal roof and siding systems by uniform static air pressure difference

    用均勻靜態空氣壓差法測定薄金屬板屋頂和板壁系統結構性能的標準試驗方法
  8. Fire test of roof deck constructions

    屋頂板結構的防火試驗
  9. Base test method for purlins supporting a standing seam roof system

    固定接縫屋頂系統承重檁條的基本試驗方法
  10. Test methods for fire tests of roof coverings

    屋頂覆蓋物著火試驗的試驗方法
  11. The test results show that the drawing interval of 1. 5 m is helpful for controlling dead - unconsolidated thin sandstone of coal seam roof and reduce sand ratio of drawn top - coal

    試驗結果表明,放煤步距採用三采一放有利於控制頂板極鬆散細砂巖,降低放出頂煤的含砂率。
  12. Test method for adhesion of asphalt - roof cement to damp, wet or underwater surfaces

    瀝青屋頂膠粘劑對潮濕表面濕表面和水下表面粘著性的試驗方法
  13. Standard test method for conducting time - to - failure creep - rupture tests of joints fabricated from nonbituminous organic roof membrane material

    非瀝青質有機屋面薄膜材料接縫的蠕變斷裂時間標準試驗方法
  14. Test standard for evaluating the simulated wind uplift resistance of roof assemblies using static positive and or negative differential pressures

    用靜態正和或負差壓評價屋頂組件耐模擬風吹起的試驗標準
  15. Test and research on bolt and wire mesh support for mine roadway with broken seam roof

    破碎煤頂巷道錨網支護試驗研究
  16. Based on the date of full - scale measurements, modeling wind tunnel tests and theoretical researches of the wind loads on low - rise buildings available, involved the date of the wind tunnel test and computational numerical simulation fulfilled in this paper, the effects of wind loads on low - rise buildings have been studied systematicaly and extensively. it reveled properly the principle of the changes of the surface mean pressures, local pressures, and fluctuating pressures with the building geometry, roof type and slope, wind direction, eave configuration, cladding system, and dominate openings

    本文根據國內外有關低層房屋風荷載的全尺寸實測、模型風洞試驗及其理論方面的研究,包括本文進行的低層房屋屋面風壓分佈的風洞模型試驗和計算機數值模擬計算,對低層房屋的風荷載特性進行了系統而深入的研究,較好地揭示了低層房屋表面的平均風壓、局部風壓和壓力的波動隨房屋的幾何尺寸、屋面形式、屋面坡度、風向角、檐口構造、覆面材料和門窗開洞而變化的特點和規律。
  17. Standard test methods for fire tests of roof covering

    屋面覆蓋材料耐火性的標準試驗
  18. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速堰橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及底板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  19. Prefabricated accessories for roofing - permanently fixed roof ladders - product specification and test methods

    屋頂層用預制附件.長期固定的屋頂梯.產品規范和試驗方法
  20. Prefabricated accessories for roofing - permanently fixed roof ladders - product specification and test methods ; german version en 12951 : 2004

    屋頂層用預制附件.長期固定的屋頂梯.產品規范和試驗
分享友人