route construction 中文意思是什麼

route construction 解釋
航路建設
  • route : n. 1. 路;路線,路程;航線。2. 【軍事】出發令,開拔令。vt. 1. 給…規定路線[次序,程序]。2. 由某一路線發送。
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Lastly, paper probe into problem on characteristics function develop route data base and model storehouse building, of dispersed type highway construction decision - making support system

    最後,論文就分散式公路建設決策支持系統的特點、功能、開發路線及其數據倉庫、模型庫的建設等問題進行了探討。
  2. Our test route took us through a choppy construction zone and over some twisty back roads

    我們的測試路徑包括一些起伏的修建路段及彎彎曲曲的小路。
  3. This article introduces the status quo of engineering and technology of foreign pipelines in permafrost regions, and puts forward the relative countermeasures for the construction of pipelines in the regions in allusion to the frost heaving and thaw settlement of country rock and soil along the pipeline route

    摘要介紹了國內外凍土地區管道工程技術現狀,針對凍土地區管道沿線和周圍(巖)土的凍脹和融沉問題,提出了相應的對策。
  4. Mr lo said : the route 8 project under construction is to provide a 15km long dual three carriageway between tsing yi and sha tin. it comprises the nam wan, eagle nest and sha tin height tunnels, the stonecutters bridge and a number of viaducts and interchanges

    盧耀楨說:興建中的八號干線工程,是一條連接青衣及沙田的雙程三線行車道路,全長十五公里,當中包括南灣隧道尖山隧道及沙田嶺隧道昂船洲大橋高架道和交匯處。
  5. In this paper, the marine route survey factors, such as water depth, bottom slope, soil shearing strength, tidal current and thunderstorm and their roles in the submarine fibre - optic cable engineering are introduced, and their roles and necessities in the cable construction are also appraised, which will make the combination of marine route survey with construction demand closer and the marine route survey be aimed at the cable engineering practice

    摘要介紹了水深、海底坡度、土壤剪切張度以及潮流、雷暴等海洋路由各勘測要素及其在海底光纜通信施工中的作用,並對它們在施工中的作用及其必要性進行了評價,從而使海洋路由勘測與施工的需要結合得更緊密,更具有針對性。
  6. Article 86 the construction of a shooting range or other facilities that will possibly affect flight safety is prohibited within the area extending 30 kilometers from the edges of an air route, unless it is a shooting range for flat trajectory light weapon

    第八十六條在距離航路邊界三十公里以內的地帶,禁止修建靶場和其他可能影響飛行安全的設施;但是,平射輕武器靶場除外。
  7. A new way of curve setting out in city route construction

    城市道路曲線放樣的一種新方法
  8. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品價格與工程造價、工程價格是如何界定的、比較建築產品的計劃價格、浮動價格與市場價格的含義,搞清楚工程造價的構成和建築安裝工程費用的構成以及竣工結算價格與決算價格的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計算依據和構成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本價標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計價依據的施工圖預算方法與招標投標之間存在悖論,工程量清單計價的推行是對建築產品市場價格形成改革的推進,也是建築產品價格形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設工程工程量清單計價規范》具有推進建築市場價格形成的諸多優勢,但仍存在不足與需要完善的地方。
  9. Abstract : compared the accuracy of the digital terain models enlarged form the air photographs kept in stock, pointed out the reliability and frugality of the computerizing optimum choosing route in surveying and designing the expressway, and proved the feasibility of choosing the optimum route by taking two steps and the effect it has on the investment of the expressway construction and the policy - making as well

    文摘:比較了利用現成航攝像片"以小放大"數字化成圖的精度,並指出了其在高速公路勘測設計中計算機優化選線的可靠性及經濟性;同時也論證了兩步選擇最優化線路的可行性及其對高速公路建設投資的影響和決策。
  10. To improve cross border traffic and relieve the road traffic to northwest new territories, the tai lam tunnel and its approaches of route 3 commenced construction in 1995 and was completed in may 1998

    三號干線的大欖隧道及連接路於一九九五年動工,在一九九八年五月完成,藉以改善過境交通及紓緩通往新界西北部通路的交通。
  11. Take the gelmud - lhasa product oil pipeline as an example, the authors study and discuss some technical problems about pipeline construction in the permafrost region, including pipe laying methods to be selected, cathodic protection technology, weather and environment variation along pipeline route and environment control of pipeline route

    以格拉輸油管道為例,探討了凍土地區管道工程可選擇的敷設方式、油氣管道的電保護技術、氣候和環境變化對管道的影響以及沿線環境管理等方面的問題。
  12. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  13. In brief introduction neijiang - kunming railway construction significance and its along the route grass sea nature protection area survey as well as protection take black neck crane as representative ' s rare and precious birds ' vital significance

    摘要簡要介紹內昆鐵路的建設意義及其沿線草海自然保護區的概況以及保護以黑頸鶴為代表的珍稀鳥類的重要意義。
  14. The hsinchu science - based industrial park administration has been improving outside transportation links with the construction of an overpass over kuangfu road connecting to gpngdao fifth road in the north rood connecting hsip second road to the sun yat - sen freeway ; and a connecting route joining hsip first road and gpngdao fifth road in the north. these three newly completed roads have greatly improved traffic conditions at the hsip. a real - time traffic monitoring system was installed at the park in 2001

    在改善園區交通品質方面,新竹科學園區管理局增設區內停車位,以解決區內停車問題至於聯外交通,園區北接公道五跨越光復路陸橋工程已於89年完成,中山高園區二路專用道工程於90年元月完工,園區一路北接公道五30米聯絡道路於90年10月通車,此三項新辟道路工程,對園區交通紓解助益甚大,園區新設之路況即時監測系統亦已於90年11月完工啟用。
  15. If the construction standards of the highway are higher than that of urban roads as a result of a change of design, the route of the highway system shall be changed or shall bypass the urban areas

    如因公路工程標準變更,致高於原市區道路工程設計標準時,應改選路線系統或繞越市區外通過。
  16. To meet olympic games, qingdao has more urban construction, traffic route too might change in recent years, ask to inquire concretly before coming

    因迎奧運,近幾年青島城市建設多,交通線路也可能有變化,來前請具體詢問。
  17. On the basis of brief introduction of danjiangkou dam extension project which is in the middle route water resources project of the south - to - north water diversion, the present construction methods and existing problems about key technology of increased artificial concrete keyway of jointing surface between new concrete and existing concrete are analyzed, and a new construction method by saw - cutting and static crack for construction of concrete keyway is researched

    摘要在簡要介紹南水北調中線水源工程丹江口大壩加高工程概況的基礎上,針對大壩加高中新老混凝土結合面新增人工鍵槽施工的關鍵技術,分析了現有施工方法及存在問題,研究並提出了新的鋸割靜裂法施工法。
  18. Chongqing expressway networking toll data communication network cotains 2 - ring and 8 - ray network structure based on expressway physical structure, setting up a trasmission trunk layer of sdh stm - 4 ( can be up - graded to stm - 16 ), and channel protection business entry layer consisting of sdh onu / olt stm - 1 ( can be up - graded to stm - 4 ). data exchange layer, through ip route exchange network above sdh network, forms 3 - level computer network structure of account settlement center - road section management company - toll station. to ensure obtaining original and reliable toll data from communication network, 2m circuitous chain is established between each toll station, accountsettlement center and road section management company, and also pstn dialing backup chain is set up between toll station and account settlement center. in order to maintain clock synchronization of the whole communication network, a proposal of sub - stage clock sychrononization signal network for differet network construction scale has been put forward in this design. in view of sensitivity and importance of toll data, this design particularly gives considerations of network safety and information safety for external and internel of network. therefore, communication safety, smoothness and reliability of networking toll system can be able to maintained in many ways

    重慶高速公路聯網收費數據通信網的結構是根據高速公路的物理結構構築了2環8射的網狀結構,建立了以sdhstm - 4 (可升級到stm - 16 )的傳輸主幹層,以sdhonu / oltstm - 1 (可升級到stm - 4 )組成的通道保護業務接入層。數據的交換層是在sdh網之上的ip路由交換網,形成了結算中心-路段管理公司-收費站之間的3級計算機網路結構。為從通信網路上保證收費數據的原始性和可靠性,每個收費站和結算中心、路段管理公司之間建立了2m迂迴鏈路,同時在收費站和結算中心之間建立了pstn的撥號備份鏈路。
  19. Find out the route of construction for credit mechanism of social intermediary organizations

    社會中介組織信用機制建設的路徑探析
  20. Exampled by a certain sea - route project on shenzhen west harbor area, construction technology is detailedly introduced in this paper, which can be definitely referred to geotechnical investigation project in maritime space

    本文以深圳西港區(位於珠江口)某航道工程為例,詳細介紹其施工工藝,以期對海域勘察工程實施有一定的參考意義。
分享友人