run-in test 中文意思是什麼

run-in test 解釋
空車試驗
  • run : vi (ran ; run)1 跑,奔,奔馳;【航空】滑行。2 趕,趕去。3 逃,逃走,逃亡。4 參加賽跑;當候選人...
  • in : adv 1 朝里,向內,在內。 A coat with a furry side in有皮裡子的外衣。 Come in please 請進來。 The ...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. The final software has four function levels and can run in three different modes : flight control, test end parameters tuning

    最終設計的飛行控制軟體具有4個功能層次,能夠在飛控、測試和調參3種模式下運行。
  2. Based on the analysis of the test result, we can find that almost all of the network application can run in gear within a small - scale network where the relay hop count is no more than five hops

    基於對大量實驗結果的分析,驗證了在中轉跳數不大於五跳的小規模網路情況下,各種網路應用程序都能很好的運行。
  3. You can run a dynamic. burn in test for more qualified results

    Monitor .來做動態測試,以節省開支,更無需為僅做靜態測試只接power
  4. That will tell the script to match bytes and you will get three lines instead of two from the test run in 7 out. txt

    這會告訴腳本按照位元組進行匹配,這樣您就會看到3行輸出,而不是7 _ out . txt中那樣的兩行輸出。
  5. Bench test method for frictional characteristics of sintered metal friction materials run in lubricants

    濕式燒結金屬磨擦材料磨擦性能試驗臺試驗方法
  6. You can control the way test runs proceed by specifying settings that are stored in test run configurations

    通過指定測試運行配置中存儲的設置,可以控制測試運行的進行方式。
  7. In order to prove the reliability and validity, we use the tektronix ' s bpa100 protocol analyser to test the bluetooth networks, in order to ensure the rignt run in the wide scope and validate the interoperability of each device. the result show that the office automation system in nayong power plant can improve the level of office automation

    為了驗證工程系統的可靠性和有效性,本文選用tektronix公司的bpaloo協議分析儀,對藍牙無線辦公網路進行了全面測試,確保系統能夠在寬范圍的微微網/散射網的配置中正確運行並驗證與其他設備之間的互操作性。
  8. California congressman duncan hunter says he ' ll test the waters for a possible presidential run in 2008

    加州議員鄧肯亨特稱,為了2008年將到來的總統競選,他將接受沃特斯家族的考驗。
  9. Insert media in the drive and run the test again

    請在驅動器中放入介質,然後再次運行檢測。 )
  10. After the erection and installation of each unit is completely finished, a series of acceptance 、 test - run and test should be conducted. if the tested results do not comply with the stipulations of the contract, the claim should be launched in time

    裝置的各個單元安裝完畢后,要對裝置作一系列的驗收、試車及考核,如果考核結果達不到合同的要求,那麼要及時進行索賠。
  11. Welding consumables. test methods. part 2 : preparation of test piece for single - run and two - run technique test specimens in steel

    焊接消耗材料.鋼的單道和雙道焊技術試樣試件的制備
  12. The following example shows the test being run in the asp. net development server address space

    下面的示例演示在asp . net development server地址空間中運行的測試。這是由
  13. The performance test virtual system of power line carrier based on lonworks locale control technology. the syetem is structure of modularity, it can be used to test all kinds of parameters of network performance according to your different requirements. in the lonmaker operation system and distributed database management system, the software of the system adopts object oriented programme. it can be run in windows 2000 system credibly

    電力線載波通信網路性能虛擬測試儀基於lonworks現場總線控制技術,它採用了模塊化結構,可根據不同的測試需求,構成不同的測試系統。本虛擬測試儀的上位機軟體是在lonmaker操作系統和分散式數據庫管理系統microsoftsqlserver下採用的面向對象的編程方法開發完成的,可以在windows2000操作系統下可靠運行。
  14. View your load tests as they run in the load test monitor

    運行負載測試時可以在「負載測試監視器」中查看它們。
  15. Those settings cause the load test monitor to adjust the user load between 1 and 100 during a test run in such a way that the

    這些設置會導致「負載測試監視器」在測試運行期間在1和100之間調整用戶負載,以使webserver01的
  16. It is researched that the influence on the tube lifetime of the metallographic structure and the alloy element and the rigidity by the test the superheater and reheater tube which is made of 12cr2mowvtib steel. the metallographic change after the tube has run in the high temperature and high pressure condition for long time is more believable and frank than the intensity lifetime analysis to evaluate the tubes remain lift time

    然後,通過試驗研究了過熱器和再熱器管12cr2mowvtib鋼材的金相組織、合金元素和硬度等對管道壽命的影響,分析管材在高溫高壓下長期運行后金相組織的變化情況,對管材定性壽命評估,這種與強度壽命分析完全不同的方法直觀可信的展示了材料損傷狀況。
  17. Over this period, non passenger trains run in both directions between hung hom and lo wu stations during non - peak hours. two trains also run two nights every week after the close of operations. notices will be posted in stations to inform passengers of the test runs

    測試的列車將不接載乘客,于非繁忙時間在紅?至羅湖車站之間行走;此外,測試期間,于每星期的兩個晚上收車后,會有兩列列車來回行走各站進行測試,以確保日常的服務不受影響。
  18. East rail is now carrying out test runs until mid december 2002 to make certain its trains will run smoothly under the new ato system. over this period, non passenger trains run in both directions between hung hom and lo wu stations during non - peak hours. two trains also run two nights every week after the close of operations

    測試的列車將不接載乘客,于非繁忙時間在紅?至羅湖車站之間行走;此外,測試期間,于每星期的兩個晚上收車后,會有兩列列車來回行走各站進行測試,以確保日常的服務不受影響。
  19. Assume instead that your code will be run in the most hostile environments. design, write, and test your code accordingly

    因而,應假定代碼將在最惡意的環境中運行,並相應地設計、編寫並測試代碼。
  20. An ordered test contains other tests that you want to run in a specific order

    順序測試包含要以特定順序運行的其他測試。
分享友人