running on schedule 中文意思是什麼

running on schedule 解釋
正點運行
  • running : adj 1 跑的,邊跑邊走的;流動的,流體的;【機械工程】操作中的;現在的,現行的;【植物;植物學】纖...
  • on : adv 1 〈接觸、覆蓋〉上去;開(opp off)。 turn on the light [radio water gas] 開電燈[收音機、自來...
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper

    本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。
  2. But american, like other airlines, is now running on a reduced schedule and cannot promise that the wide - body jets necessary to fit the crates will be available for a san diego run when the animals are slated for return, a spokeswoman told the newspaper

    一位發言人告訴記者,像其它航空公司一樣,美利堅航空公司也在不斷減少航班班次,所以在原定時間運送考拉時,他們不能保證為這兩只考拉提供能夠容納考拉板條箱的大機身飛機。
  3. 10 the single journey time on a bus route is 25 mins, and 5 mins is allowed in the schedule before the next journey to recover from any late running

    巴士完成一次線路所用時間為25分鐘,在下一班出發前允許有5分鐘的時間以彌補可能的延誤。
  4. Bsp supplies the simple interface to operate the peripheral chips conveniently. thus, real - time operating system ( rtos ) can start up from the various hardware successfully and response to the asynchronous event opportunely. on the other hand, rsp implements the encapsulation to rtos and brings up the process model according to the running character of the business layer, realizes the secondary process schedule inside task

    一方面,支撐子系統bsp層(板級支撐包)的設計實現了對硬體層的封裝,這包括對cpu ( mpc8241 )的封裝和對外部晶元(串口、網口等)的封裝,通過這層封裝使得實時操作系統能夠成功啟動,及時響應異步事件,實現了硬體的基本功能,並且為上層提供了簡單易用的操作晶元的介面,隔離了軟體對硬體功能要求所必需的具體細節。
  5. So, our team had not the chance to move horizontal on the mast when the ship was moving. about the 1, 200 meters running, the way was not clear and there is no enough instructors or staffs to direct the 36 trainees, it resulted in most trainees lost the way and failed to finish the 1, 200 meters that included me. according to the environment, city challenge instead of field challenge, camp on beach replaced sole stay in mountain, the tend of wind delayed the sailing schedule and it cancelled the raft race, it took away our opportunity of learning how to make raft by bamboo and large plastic tub

    首先是船頭跳水,在港,正好鯊魚旺季,暫停營業,到了日本,又逢港口管制,被逼休假;而離港啟航的首個節目,本應是在行進的船上,爬上桅桿,再橫行桿上,學習解帆,雖然桿是上盡了,但雨卻落下來,船要轉帆,於是橫行桿上學習解帆這等壯觀場面,我們全組都無緣參與;再來是千二米長跑,指示不清,路線不明,以致多人迷路,被逼半途而廢;接下來的野外定向,因就地利,變身為城市挑戰;山中獨處換了沙灘露宿;風向延誤了航程,阻止了木伐競渡。
  6. We provide with dedicated trucks running on pre - determined routes and fixed schedule to ensure 100 % time definition

    我們可以提供專車在事先設定的路線上按照固定的時間表運行以確保100 %的準點服務。
  7. Based on the experience and lesson of the hydropower project management under the planned economy system, the managers of ertan hydropower station tried to find out a new hydropower project management mode, which includes several main points as follows : ( 1 ) : undertake the project management based on the enterprise legal person, and unify the project construction with the goal of sustainable business running. ( 2 ) : carry out the tender system to choose the contractors and manufacturers by fair competition to guarantee the quality and schedule of the project and reduce the cost. ( 3 ) : introduce fidic contract conditions, implement project supervision, set up dispute review board, and invite special advisory group, etc. ( 4 ) : strengthen contract management in order to control the quality, schedule and cost of the project

    二灘水電項目是在國家實施改革、開放政策中進行建設的,總結計劃經濟下水電項目管理的經驗和教訓,二灘水電項目管理者在探索新的水電項目管理模式,主要是實施以企業法人為主體的水電項目管理,把項目建設和企業持續經營的目標統一起來;實行招投標制,在市場競爭中選擇工程承包商和設備製造商,保障工程質量、工期和降低工程造價;引進菲迪克合同條件、實施工程監理、設立爭議評審團、聘請特別咨詢團等,強化合同管理,實行對工程質量、工期和工程造價三大控制;做好資金管理工作,保障項目建設對資金的需要,降低資金成本等。
  8. Based on the characteristics of aviation products, this paper mainly focus on the research of schedule control technology in the process of project running

    進度控制是進度管理中的關鍵技術之一。本文針對航空產品特點,對項目運行過程進度控制技術進行研究。
  9. This paper gives the conception and the composing of rsp first, and then presents a conception of process module and the scheduling to it, based on the task schedule mechanism provided by the real - time operating system, according to the characteristic of the applied programmes in the upper layer, designing and realizing a highly effective algorithm for the management of the system ’ s timer resources, as well as providing a special module used to monitor the running status of all the software and hardware of the system, all of which provide a universal running platform for the applied programmes

    本文首先陳述了rsp的概念及模塊劃分,在實時操作系統的任務的基礎上,根據上層業務的運行特點,提出了進程模型的概念,實現了基於進程的二級調度,構造了進程間的零拷貝的消息通信機制,設計實現了一個高效的對系統定時器資源進行管理的演算法,並提供了一個實時監控系統軟硬體運行狀態的系統監測模塊等等,所有這些為上層應用提供了一個通用的運行平臺。
分享友人