schedule drawing 中文意思是什麼

schedule drawing 解釋
工程圖
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • drawing : n 1 延引,牽引;引誘。2 抽簽;拈鬮。3 【機械工程】拔絲;沖壓成形。4 描畫,制圖;圖,圖形;素描;...
  1. The main parts of this paper is now be showed in the following : 1 ) the development for the compiling of the schedule had been finished 2 ) the realization of the management function for the schedule system, the base managements can be processed with the management tools. 3 ) the data taken and expressed from the drawing layout system, in the schedule system. 4 ) the data transfer from the schedule system to the drawing layout system

    本文的研究工作主要包括以下幾個方面: 1 )適合電廠工程的進度計劃編制功能的開發完成; 2 )實現電廠工程的施工進度計劃管理功能,可以利用施工進度計劃編制系統的管理工具對施工進度計劃進行基本的管理; 3 )實現在施工進度計劃定製系統中對施工平面布置系統中的數據的讀取和表達; 4 )完成施工進度計劃數據向施工平面布置系統的傳送。
  2. Presenting bank must certify on its covering schedule that the amount of each drawing has been endorsed on the original credit

    釋疑:交單行(議付行)必須在交單聯系單上證實;每次提款的數額已經在正本信用證的背面列明. -這是對議付行的指示,與受益人無關
  3. Familiar with toys mark, grip abundant information for kids components suppliers, be able to develop the products according to the drawing, and make the samples, inquire price, make quotation, receive orders, follow up the production schedule

    了解玩具市場,掌握豐富的玩具供應商資源,能夠根據能夠獨立按照客人提供的圖紙進行玩具產品的開發,打樣,報價,接訂單,跟進工廠生產進度。
  4. Article 36 the preparation and construction office is responsible for the following concrete works : examining the designs of the project, signing the project construction contract, organizing the purchase and inspection of related equipment, materials, etc., working out the general schedule of project construction, compiling the expenditure plans, controlling project financial payments and final accounts of the project, drawing up managerial methods and keeping and filing documents, drawings, files and materials, etc., during the construction period of the project

    第三十六條籌建處具體負責審查工程設計,簽訂工程施工承包合同,組織有關設備、材料等物資的采購和驗收,制定有關的管理辦法,做好工程施工過程中文件、圖紙、檔案、資料的保管和整理等工作。
  5. The amount of each negotiation / drawing must be endorsed on the reverse of this credit and negotiation / presentinig bank must certify the same on the covering schedule

    每次提款必須在信用證的背面記錄,議付行必須在附函上證明此事。
  6. It actualizes the automation design of glass bottle and mould and automation output of the mould schedule drawing. in this system, the thinking of object oriented programming is applied

    它運行在windows98或windows2000操作系統上,實現了玻璃瓶瓶形設計、模具設計的自動化及模具零件工程圖紙的自動輸出。
  7. For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other

    為了提高現代建築工程項目施工組織設計和施工管理的科學性和合理性,本文以電廠建設工程項目為例研究和開發了集成化的施工進度計劃和施工布置的計算機輔助設計系統,利用該系統不僅可以獨立的實現施工布置和施工進度計劃的編制,而且可以利用開發的自定義文件進行這兩種系統的數據交流和表達。
  8. The exact boundary of the sai wan ho grand promenade public transport terminus is delineated by hatching on the drawing shown in the schedule

    公共交通總站的確實范圍將在附表的圖則中以影線表示。
  9. In this paper, the studies of the design methods of gbmcad system and the methods of data management in the mould cad and the automation design of glass bottle mould and the automation output of mould schedule drawing are the emphases

    本論文重點研究了gbmcad系統的設計方法、模具cad中的數據處理方法、玻璃瓶模具的自動設計及模具工程圖紙的自動輸出。
  10. Based on internal rate of return as dynamic index of financial evaluation, the authors quantitatively analyse the critical point of investment inflation for a project, which can be explained as follows. assuming that the project is in a definite time limit during which the internal rate of retum should not be less than minimun attractive rate of return ( marr ), an analysis is made on the critical value of allowable maximum inflation of investment cost. similarly, assuming that the project is in a definite investment, an analysis is made on the critical point of allowable maximum delay of time limit for the project. by critical analysis of inflation of investment and delay of time limit for a project, an investigation can be made on the capacity for a project to bear the risk of investment inflation and time limit delay ; and then a scientific basis can be offered for arranging invesetment and drawing up schedule of construetion

    根據建設項目財務評價的動態評價指標? ?內部收益率,定量地分析建設項目的投資膨脹臨界點.假設在工期一定情況下,研究分析項目的內部收益率應該至少等於國家規定的行業基準收益率時,其允許投資費用的最大膨脹臨界值.類似於投資膨脹臨界分析,假設在項目投資一定情況下,得到允許建設工期的最大膨脹臨界點.通過投資與工期膨脹臨界分析,可以考察投資項目承受投資增加和工期拖延的風險能力,為合理安排投資和編制施工進度提供科學依據
  11. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計圖紙、設備安裝資料及設計修改通知單和監理通知單為依據,按規程規范的要求,以不影響工程進度為原則,由主管工程師對施工班組進行技術交底,利用經緯儀、水準儀和捲尺等測量工具放點定位進行基礎及預埋件預埋並做好預埋記錄。
  12. It includes the choice of standard moulds and the calculation of none - standard moulds. ( 3 ) automation output of the mould schedule drawing

    包括非標準模具零件的設計計算及標準模具零件的選型; ( 3 )模具工程圖紙的自動輸出。
  13. In this part, the thinking of parameterized drawing is used. the system can draw the mould schedule drawing with the data produced in mould design process automatically. ( 4 ) drawing library

    利用模具設計得到的參數結果,進行參數化繪圖,直接輸出模具零件的工程圖紙; ( 4 )圖形庫。
  14. Super - schedule construction out frame space realizes safe quick with drawing in comprehensive mining working face

    超前施工出架空間實現綜采工作面安全撤出
  15. The exact boundary of the prohibited zones is delineated by hatching on the drawing shown in the schedule

    有關禁區的確實界限已於附表的圖則內以影線示明。
分享友人