schedule estimation 中文意思是什麼

schedule estimation 解釋
進度估計
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • estimation : n. 1. 估計,評價。2. 預算,預算額;概算。3. 尊重,尊敬。4. 意見,判斷。5. 【化學】估定;測定。
  1. Confidence percentile estimation to cost and schedule integration based on monte carlo multiple simulation analysis technique

    多重模擬的費用與進度聯合置信估計
  2. Aiming at the concrete need in srttep construction and embodying the managing theory of the combination of the prearranging programming and comprehensive control, the article proposes the cpm - based schedule operating program of srttep on the basis of the relationship among schedule program, cost and quality which thus realizes the close combination of schedule program and project control ; based on the comparative analysis of experience estimation method, factor estimation method, wbs estimation method and comparison estimation method, the cost controlling strategy is worked out that attaches importance to the srttep cost budget and market economy situation. meanwhile, comprehensive quality management theory is introduced in the project " s schedule program. aiming at subsidiary project bidding, equipment purchase, essential quality inspection, detailed quality insurance system and rules are worked out so as to achieve the goal of high - quality construction of srttep

    ( 3 )針對川塔項目施工建設具體需要,在充分體現項目事前規劃與全面控制相結合管理思想和所進行的項目wbs結構分解基礎上,基於項目進度? ?費用成本? ?質量三者之間的關系,提出了基於cpm關鍵路線法的川塔項目進度計劃制定方案,實現了進度規劃與控制的緊密結合;在對比分析經驗估演算法、因素估演算法、 wbs估演算法、類比估算等方法和技術基礎上,制定了側重於預算的川塔項目成本基本規劃方法,以及結合市場經濟情況的成本控制策略;同時將全面質量管理思想,引入了項目施工方案中,針對子項目招標、設備采購、重點質量監控點等設立了詳細的質量保障機制和細則,以確保達到工程優質建設的目標。
  3. New software process technology ( usdp and cmm ) and its effect to software project management are analyzed in this article, the two important aspect ( the cost management and the schedule management ) of the software project management are analyzed and given improvement basing on the analysis and the historical database technology. the important research lies in estimation and control of the cost and schedule management

    本文分析了軟體過程新技術( usdp和cmm )及其對軟體項目管理的影響,在此基礎上結合從軟體度量技術發展起來的歷史數據庫技術,對軟體項目管理中的兩個重要方面(成本管理和進度管理)進行了分析和改進,主要是對這兩個方面的估計和控制技術進行了分析和改進。
  4. Application of cocomo in software maintenance cost and schedule estimation

    模型在軟體維護成本及進度估算中的應用
  5. Then, the issue of estimation and control in the cost and schedule management is researched deeply in this article

    然後本文對軟體管理中的成本/進度的估計和控制問題進行了深入的探討。
分享友人