schedule planning 中文意思是什麼

schedule planning 解釋
進度計劃
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • planning : n. 計劃,規劃。 an overall planning 全面規劃。
  1. Planning and schedule control of the iran refine plant reconstruction project

    伊朗煉廠改造項目計劃和進度控制
  2. The draft schedule will be submitted to the town planning board for consideration in early 2000

    草擬的土地用途表將於2000年初提交城市規劃委員會作出考慮。
  3. " during the planning period, there were inevitably some anxious moments as we watched construction progress for the centre s new extension, but everything happened exactly on schedule, and the end result certainly exceeded our expectations

    于最初的策劃階段,當時會展新翼的工程進度還是有點令人憂慮,幸好一切都進展得十分順利,令我們喜出望外
  4. Upgrades to capacity can be smoother if lead time include adequate planning and testing ( according to a common forward schedule of changes ( fsc ) ) which can be shortened by a more agile approach

    如果能夠由更快捷的方法來縮短包括足夠計劃和測試(根據公共的fsc )籌建時間,那麼容量的提升能更順利。
  5. The first members shall, in accordance with the provisions of the fourth schedule to the university ordinance, be the persons who are members of the planning committee on the commencement of the shaw college ordinance

    依照大學條例第四附表之規定,第一屆校董必須在逸夫書院條例開始實施之前已為籌劃委員會之人士。
  6. Overview schedule planning of new large - scale airport terminal project

    大型機場新建航站樓工程總進度綱要的編制
  7. This thesis systemically researched construction project management with theory and way of system engineering. this thesis was based on the basic concept, basic character, main content of construction project management and mainly analyzed main question and reason of construction management. according to the total process of construction project management, it systemically researched and discussed the biding, setting up project office, project planning, object controlling ( including schedule, quality, safety and cost of controlling ), and it researched how to strengthen element management, contract management, information management, site management, organization coordinating, construction final accounts for realizing object of project management

    根據施工項目管理必須經歷的過程,分別對項目管理過程中的承攬任務、組建項目經理部、項目管理規劃、項目目標控制(施工進度、質量、安全、成本的控制) ,以及為實現項目管理目標必須加強的要素管理、合同管理、信息管理、現場管理、組織協調和運行機制等作了系統的分析和研究,並通過案例進行論證。
  8. To operate a excellent shipping service and run a beneficial management could win more. for this aspect, the essay focus on the planning and programming of the main - haul trading routes. as one of the distinguished feature of container carriers, the operation of shipping lines has strictly act accordance with the schedule for voyages

    二、論文研究的目的l 、分析闡述集裝箱班輪運輸特點,目前全球主幹航線布局,集裝箱班輪航線經營成本構成,集裝箱樞紐港在班輪運輸中的作用,全球集裝箱運輸網構成等,明確班輪班期在集裝箱運輸中的地位和作用。
  9. Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method

    本文基於netomac模擬軟體,以發電市場預調度計劃模型及演算法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度計劃周期內的市場購電價格最小為目標的發電市場預調度計劃模型,並根據預調度計劃問題狀態數多、變量多、混合整數、非解析的特點,將預調度計劃模型的目標函數簡化為各時段的市場清算電價最小,設計了三段式預調度演算法:用靜態規劃法求解整個預調度計劃周期內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。
  10. The chapter of project planning is to characterize the main planning sequence of the project : the scope planning - the scope definition - the action definition - the resource planning - the action sequence definition - the action duration - the cost evaluation - the schedule definition - the cost budget - the project planning. in order to deploy the entire project planning, the secondary planning is necessary : the quality planning, the communication planning, the organization planning, the risk planning, and the purchasing planning

    項目計劃介紹了按照范圍計劃-范圍定義-活動定義-資源計劃-活動排序-活動歷時-費用估算-進度計劃-費用預算-項目計劃制定的主計劃順序,結合質量計劃、溝通計劃、組織計劃、風險計劃、采購計劃的輔助過程,完整地制定項目計劃的過程。
  11. In accordance with the procedures of urban planning, these layout of these special districts are carefully planned to ensure that they will be equipped with complete public facilities and the surrounding land will be used appropriately to make these districts the commercial, recreational and residential center of these cities. the lands for the special districts were acquired through land expropriation by zone and favorable conditions were offered for the original owners. meanwhile, planning and designing of various public construction were underway according to the construction schedule of the five hsr stations

    配合高速鐵路興建計畫,政府于高速鐵路沿線桃園新竹臺中嘉義及臺南等五處車站分別擬定高鐵車站特定區計畫,透過都市計畫程序,合理規劃車站特定區之未來發展,使其具備完善的公共設施,合適的土地使用分區,將使車站特定區成為宜商宜住休閑的新多元性活動的市鎮中心。
  12. This planning run only includes the master schedule items

    這個計劃執行僅包括主計劃項目。
  13. The master project schedule is a deliverable of the planning phase

    主項目時間表是計劃階段的可交付件。
  14. Familiar with erp, mrp, schedule, material planning and purchasing, logistics planning, warehouse management and other logistics knowledge

    熟悉erp 、 mrp理念,整車計劃、零部件計劃采購、規格、物流規劃、現場物流、倉儲管理及其他物流知識。
  15. Shanghai xiangba has a high - quality employee ' s group. once one project begun with contacting with the customer, they have set about selecting suitable materials for customer ' s, planning the schedule, designing, making and installing of the craft for every preparation, and customer can choose shanghai xiangba antiseptic product with the corresponding specification and corresponding quality mark according to the usage, and carry on the long - term and hign - qunlity follow - up service to its product

    上海翔霸擁有一支高素質的員工團隊,每個項目從前期接洽開始,就著手為客戶選材、方案策劃、設計和製作安裝工藝的各項準備工作,客戶也可以根據需求選擇相應規格及具有相應品質標記的上海翔霸防腐材產品,公司對所提供產品進行長期優質的跟蹤服務。
  16. Futhermore, a scheduling pretreatment process is proposed to integrate the information of different views, thus the information of cmvqm can support two processes of schedule risk assessment and schedule risk management planning directly

    建立了調度預處理過程,使cmvqm模型中的信息能夠直接支持進度風險評估與進度風險管理計劃決策等過程。
  17. Srabpi integrates three sequential processes of classical schedule risk analysis method, namely project schedule planning, project schedule risk assessment, and project schedule risk management planning, into one process, which avoids the same difficulties as above and reveals the idea of system optimization

    Srabpi實現了進度計劃制訂、進度風險評估和進度風險管理計劃制訂這三個經典進度風險分析中原本為順序關系的過程的集成分析,較好避免了前述經典進度風險分析方法的普遍性問題,體現了系統優化的思想。
  18. The successful proponent is required to comply with all the statutory requirements under the eiao during the planning, design, construction and operation stages by completing eia studies for the project, and obtaining environmental permit ( s ) for any schedule 2 designated project ( s ) prior to their construction and eventual operation. proponents should take this into account in their programme

    在施工及日後進行營運前,中選的建議者必須在規劃、設計、建築和營運階段,完成該工程項目所需的各項環境影響評估研究,以及就附表2指定工程項目取得環境許可證,以符合《環境影響評估條例》的所有法例規定。
  19. A based prject schedule planning mananement system

    一種基於項目管理進度計劃的管理系統
  20. 159 our major planning items contain estimating of cost and construction schedule

    我們主要的計劃工作項目包括費用預算和施工進度。