schedule risk 中文意思是什麼

schedule risk 解釋
進度風險
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  1. Statutory backing for the market risk capital regime was effected by an amendment to the seventh schedule to the banking ordinance which deals with the authorization criteria

    透過修訂銀行業條例附表7列載認可準則,市場風險資本制度已取得法定效力。
  2. If the hedged risk is an interest rate risk or risk of repayment ahead of the schedule, the held - to - maturity investment shall not be designated as a hedged item

    被套期風險是利率風險或提前還款風險的,持有至到期投資不能指定為被套期項目。
  3. In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key

    工程施工進度風險分析計算是施工進度控制中的重要環節。
  4. The risk assessment and the risk sequence of the equipment and piping of catalytic cracking unit in lanzhou petrochemical company were defined by applicating the risk - based inspection ( rbi ) technology, and the inspection program which offers scientific basis for repairing schedule and strategy was made according to different equipment, piping and different risk classes

    摘要通過運用基於風險的檢驗( rbi )技術對蘭州石化公司300萬噸年重油催化裂化裝置的靜設備和管道進行風險評估和風險排序,針對不同的設備,不同的風險等級制定了相應的檢驗策略,為制定裝置的檢修計劃和長期的檢修策略提供了一種科學方法。
  5. The basic principle of earned value is introduced in this paper and the contents of project risk management are also included. based on analyzing of merits and shortcomings about earned value and risk management, it is likely to integrate them. the paper has a hot talk about the method of calculating the earned value indexes when the schedule of activity is fixed

    接著,著重討論了項目活動持續時間均服從pert三點估計時項目在各觀察點的掙值績效指標值的計算方法,給出了某一項目在該種情況下各觀察點的最可能的掙值績效指標值的模擬結果,並在分析了這些掙值績效指標值的曲線特徵的基礎上,探討了掙值管理中的風險控制問題。
  6. An amendment to the second schedule to the employees compensation ordinance ( eco ) to include two new diseases, namely severe acute respiratory syndrome ( sars ) and avian influenza a, as prescribed occupational diseases has come into operation starting from 8 february 2005. the addition expedites the compensation process for employees working in specified high risk occupations and happening to be infected with either of the two diseases

    政府已修訂《雇員補償條例》附表2 ,加入兩種指定職業病嚴重急性呼吸系統綜合癥(俗稱沙士)和甲型禽流感以加快在指定高風險職業工作的雇員在萬一感染該兩種疾病時的申索補償程序。
  7. An amendment to the second schedule to the employees compensation ordinance ( eco ) to include two new diseases, namely severe acute respiratory syndrome ( sars ) and avian influenza a, as prescribed occupational diseases has come into operation starting from 8 february 2005. the addition expedites the compensation process for employees working in specified high risk occupations and happening to be infected with either of the two diseases.

    政府已修訂《雇員補償條例》附表2 ,加入兩種指定職業病嚴重急性呼吸系統綜合癥(俗稱沙士)和甲型禽流感以加快在指定高風險職業工作的雇員在萬一感染該兩種疾病時的申索補償程序。
  8. The company refers the customer to the risk disclosure statements in schedule 5

    本公司邀請客戶參閱載于附表5的風險披露聲明。
  9. The chapter of project planning is to characterize the main planning sequence of the project : the scope planning - the scope definition - the action definition - the resource planning - the action sequence definition - the action duration - the cost evaluation - the schedule definition - the cost budget - the project planning. in order to deploy the entire project planning, the secondary planning is necessary : the quality planning, the communication planning, the organization planning, the risk planning, and the purchasing planning

    項目計劃介紹了按照范圍計劃-范圍定義-活動定義-資源計劃-活動排序-活動歷時-費用估算-進度計劃-費用預算-項目計劃制定的主計劃順序,結合質量計劃、溝通計劃、組織計劃、風險計劃、采購計劃的輔助過程,完整地制定項目計劃的過程。
  10. As a new security means for loan, it has broken the limit of the traditional real guarantee thoery, and initiated a new real guarantee means by which real estate company can raise a loan from banks easier, banks reduce his financial risk and house consumer be available to buy house ahead schedule

    二十世紀九十年代以來,樓花按揭在內地廣泛流行,作為一種新型的融資擔保方式,它突破了傳統物權擔保僅以現有財產為標的的限制,開創了以預購商品房的房產期待權為擔保標的新模式。
  11. R & d projects have some characteristics such as high technology, long life cycle, and large investment scale, which results in remarkable schedule risk problem

    研發項目技術含量高、研製周期長、投資規模大,進度風險問題非常突出。
  12. Therefore, it is of very importance to perform schedule risk analysis before the implementation of r & d project

    因此,在研發項目實施之前開展進度風險分析十分必要。
  13. Thirdly, a schedule risk assessment method based on single mode stochastic resource constrained project scheduling problem model is presented

    第三,提出基於單執行模式隨機資源約束項目調度問題模型的進度風險評估方法。
  14. Futhermore, a scheduling pretreatment process is proposed to integrate the information of different views, thus the information of cmvqm can support two processes of schedule risk assessment and schedule risk management planning directly

    建立了調度預處理過程,使cmvqm模型中的信息能夠直接支持進度風險評估與進度風險管理計劃決策等過程。
  15. Srabpi integrates three sequential processes of classical schedule risk analysis method, namely project schedule planning, project schedule risk assessment, and project schedule risk management planning, into one process, which avoids the same difficulties as above and reveals the idea of system optimization

    Srabpi實現了進度計劃制訂、進度風險評估和進度風險管理計劃制訂這三個經典進度風險分析中原本為順序關系的過程的集成分析,較好避免了前述經典進度風險分析方法的普遍性問題,體現了系統優化的思想。
  16. [ 4 ] investment / schedule target risk analysis is a new demand to project managemeimt engineeis. a study of the main content of risk analysis of construction project management is made, and an elementary research on the application of computer simulation to the investment / schedule risk analysis is carried out

    ( 4 )造價/進度目標風險分析是監理規范對監理工程師的新要求,對監理風險分析的主要內容進行了研究,並就計算機模擬在造價/進度目標風險分析中的應用進行了初步探索。
  17. Firstly, the degree of the development of project management and risk management, the explanation of the importance of project risk management, and the expatiation of the theory and method of project schedule plan, the status of project schedule risk evaluation and the development and application of simulation technique are introduced in this paper. then the advantages and disadvantages of simulation technique and program evaluation and review technique for evaluating the schedule risk of project are apart listed in the paper, and that the theory and method of monte carlo method is discussed emphatically in the paper. finally the method for evaluating the schedule risk of project by creating monte carlo simulation model with the software excel is presented in the paper, which includes modeling, simulating, counting, testing and evaluating, and makes the complex and hard quantitative analysis work - risk evaluation easy and convenient, the result of evaluation more precise and credible

    本文首先介紹項目管理和風險管理的發展狀況,說明項目風險管理的重要性,闡述項目進度計劃的理論和方法、項目進度風險評價的現狀以及模擬技術的發展和應用,然後對比分析模擬法和計劃評審技術在評價項目進度風險時的優劣,並著重探討用蒙特卡羅法進行風險評價的理論和方法,最後提出在計算機軟體excel上建立蒙特卡羅模擬模型對項目的進度風險進行評價的思路和模型,並在excel上建立一套完整的進行項目進度風險評價的實現步驟和方法,包括建模、模擬、統計、檢驗和評價,使風險評價這一復雜困難的定量分析工作變得簡單方便,而且使其結果更加準確可靠。
  18. For example, it is difficult to ensure the reasonability of schedule risk analysis object and topn schedule risk factors, the optimization of schedule plan is always broken by schedule risk management measures, and few researches fully considered activity iteration and overlapping in r & d project. to solve these problems, this thesis takes schedule risk analysis process integration as guidelines, presents a r & d project schedule risk analysis method based on process integration ( srabpi ), which provides a new way and new methods for schedule risk analysis of r & d project. the main contents and fruits of this thesis are outlined as follows : firstly, srabpi idea is presented and srabpi framework is constructed from several aspects such as body, connotation, processes, methods, management organization, and relations between srabpi and project risk management

    本文針對經典進度風險分析方法中存在的進度風險分析對象的合理性難以保證、 topn進度風險因子選擇難和進度風險管理措施影響進度計劃最優性等普遍性的問題,綜合考慮研發項目活動迭代和重疊等特點,以進度風險分析的過程集成為指導思想,研究提出一套基於過程集成的研發項目進度風險分析( srabpi )方法,為研發項目進度風險分析提供了新的途徑和新方法,論文的研究內容和主要貢獻如下:首先,提出研發項目srabpi思想並從主體、內涵、過程、方法、組織管理及其與項目風險管理的關系等多個方面構建了srabpi框架。
  19. Once the model solution is determined, the optimal schedule plan as well as schedule risk of this schedule plan will be determined too. it is useful for the decision of risk optimal schedule plan and provides an evidence for schedule risk management

    通過對模型的求解,實現了在制訂風險最優進度計劃的同時,完成對項目的進度風險評估,為風險最優進度計劃的制訂提供了決策支持,並為進度風險管理提供了參考。
  20. This paper is an application research on evaluating the schedule risk of project by monte carlo method with the software excel. therefore it has certain reference value for the research and practice of project schedule risk evaluation, especially for the risk evaluation of the project whose work times are random

    本文是通過計算機軟體excel來實現蒙特卡羅模擬技術在項目進度風險評價方面的一次應用研究,因此它對項目進度風險評價的研究和實踐具有一定的參考價值,尤其是在評價活動時間為隨機型項目的進度風險時,它具有相當的參考意義和經濟價值。