scheduling system 中文意思是什麼

scheduling system 解釋
調長系統
  • scheduling : 編排;調度
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. The requirement analysis and system design are carried out according to the situation of nanjing sky electron co. ltd. at the same time, the key technology to solve the capability balance of the machine tool and scheduling system of the workshop production are studied, and a management model of the workshop production solved the corresponsive problem to finish the production task in time according to the current need in the enterprises

    然後結合一個典型的製造業企業? ?南京四開電子企業有限公司進行了系統的需求分析和設計。接著研究了企業車間級生產計劃管理模型,提出了一種以按時交付為目標的機床生產能力平衡與車間級生產計劃的控制方法,並對其中需要解決的關鍵技術進行了研究和討論。
  2. With the study of oil production, storage and transfer scheduling, whole logistics from crude oil input to crude oil refining, then to product output, ultimately to oil distribution is reappeared in this dissertation, which makes a good basis for the realization of scheduling system and provides a good decision for management and contro

    通過對油品生產與儲運過程調度問題進行研究,再現了從原油入廠,到原油加工,到產品出廠,最後到產品流通的完整物流網路,為調度系統的工程化實現打下了良好的基礎,為企業的生產經營和生產控制提供決策依據。
  3. For the problems of load balance between clusters, the author and his research team build a job migration management system which is able to work with dedicated job scheduling system of every cluster, set up the multi - cluster resource reserving plan and the mechanism to enable jobs to utilize the idle resources in whole cluster group by migrating, and formulates a algorithm to compare migrating destinations

    針對集群系統之間負載平衡問題,作者及課題組研製了集群系統間的作業遷移管理系統,實現了集群組之間的資源保障計劃和作業通過遷移利用集群組空閑資源的機制,制訂了遷移目標比較演算法。
  4. Finally, the results from simulation shows the mas - ga based scheduling system is promising for practical job - shop scheduling

    最後,大量的模擬實驗證明了基於mas和ga的車間調度系統在實際應用中的前景。
  5. The fourth chapter introduces mas mechanism to construct a dynamic job - shop scheduling system, with ga providing basic support. mas mechanism decomposes a continuous and dynamic job - shop scheduling problem into series of jssps so that the predefined ga can work out the schedule

    在ga提供了求解jssp的有效支持的基礎上,本文引入多代理思想管理車間生產動態過程,以將動態jssp分解為一系列靜態jssp ,從而能通過ga方法求解。
  6. The application of gis to mine production scheduling system

    在礦山生產調度系統中的應用
  7. Finally, jinduicheng mo. company open - pit is quoted as an instance for building mine transportation vechile scheduling system model, and according to the model, adopt genetic algorithm to study the optimization of mine transportation vechile scheduling system. a rational project is given to this problem, the paper also analysized the optimial design of mine transortation vechile scheduling, the model offering in this paper, convergence of optimal algorithm and data bank management, and transportation project of minerals and disposals is optimized, which realize the decision of transportation project and data visibilization, and wich improves the science and information process of transportation department management

    最後,論文以金堆城鉬業公司露天礦為例建立礦山運輸車輛優化調度模型,結合所建立的礦山車輛優化調度模型,採用遺傳演算法對礦山運輸車輛系統進行優化研究,為其提供合理的體系方案。並對礦山車輛優化調度系統設計進行了詳細分析,提出的礦山車輛優化調度系統,集優化演算法與數據庫管理分析於一體,進行礦巖運輸方案的優化,實現調度方案決策的可視化、運行數據的可視化,促進運輸部門管理的科學化、信息化進程。
  8. Research of airport scheduling system based on multi - agent

    的機場調度系統的研究
  9. Model of shop - equipment scheduling system based on multi - agent

    基於多智能體技術的車間設備調度模型
  10. Development and design of master production scheduling system for erp based on web

    主生產計劃系統的設計與實現
  11. Firstly, the whole scheme of the production scheduling system oriented to big device equilibrium is systematically analyzed and designed in this dissertation

    本文首先進行了面向大設備平衡的生產計劃系統的總體設計。
  12. This thesis introduces the design and implementation of a planning and scheduling system for satellite ' s payloads

    本文主要研究衛星有效載荷的規劃與調度問題。
  13. A solution of job shop scheduling system based on genetic algorithms

    一種基於遺傳演算法的車間調度演算法求解
  14. The purpose of this dissertation is to develop a practical algorithm on nonstandard job - shop scheduling problem with constructional relationship among its parts under the make - to - order mode, and develop a production scheduling system oriented to big device equilibrium to fulfill the practical demands of harbin electric machinery limited company

    本文研究的目的是要尋找一種面向訂單生產模式且帶有裝配關系的非標準車間作業調度問題的實用生產調度演算法,並根據哈爾濱電機廠有限責任公司生產調度的實際需求,開發一個實用的面向大設備平衡的生產計劃系統。
  15. Based on analysis with the cims methodology of function modeling and information modeling on the existing system and setting up a rationalized and scientific architecture of the hydro - junction, the automatism realization on the operation flows of the flood control scheduling system and the water resource distributing system is modeled with the cims " process integration methodology ( idef3 )

    在基於cims功能建模( idef0 ) 、信息運行模式分析和建立水利樞紐合理、科學的體系結構的基礎上,提出以過程集成( idef3 )方法建立水利樞紐防洪調度和水資源調度業務流程模型。
  16. Real time optimization research and application of mining scheduling system based on genetic algorithms and adaptive network fuzzy inference system

    的露天礦山開采調度系統的實時優化與實踐
  17. Study on the course scheduling system for institute and university

    高等院校排課系統的研究
  18. The relationship between the performance index and the processor utilization of real - time control tasks in different control phases is analyzed, and a fuzzy feedback scheduling system for real - time control tasks is proposed

    摘要分析了實時控制任務的控制性能在不同控制階段與處理器利用率需求問的關系,提出一種實時控制任務的模糊反饋調度系統。
  19. They also introduced an advanced planning and scheduling system ( aps ), which enables them to plan production more accurately and reduce production delays

    該企業還引入了一套先進計劃與排程系統( aps ) ,使得他們能夠實現更精確的排產,並減少生產延遲。
  20. Based on practical engineering experience, a suit of template for project scheduling system including the commonness of different engineerings has been customized. in addition, some special functions have been added to it. they are the updating of the completion of tasks, the relationship with the construction ration, data exchange between the scheduling system and the layout system of the drawings and the picturing of the earned curve, etc. besides, the project database has been designed in accordance with the theory and criterion for database design

    本文根據現場工程經驗,總結不同工程中存在的共性,在project2000基礎上定製開發了電力安裝工程施工進度計劃模板,並且在該模板上增加了一些其特有的功能,包括:任務的更新,與施工定額相聯系,與施工平面布置圖中數據的交互以及利用贏得值原理繪制贏得值曲線等。
分享友人