second anchor 中文意思是什麼

second anchor 解釋
第二錨
  • second : adj 1 第二的;第二次的;二等(的)。2 次等的;較差的;劣於…的 (to)。3 〈美國〉較年輕的。4 另一...
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  1. Results the palatal implant connecting with the first permanent molar significantly reduced mesial movement and protrusive displacements of anchor teeth while the implant connecting with the maxillary second bicuspid was in favor of the control on the movement of the first permanent molar towards the medium of the palate

    結果種植體連接在第一恆磨牙上更有利於控制支抗牙近中移動和垂直仲長;連接在第二雙尖牙上對第一恆磨牙的居向移動控制更好。
  2. The main functions of the module for initializing drawing environment are to set up the scale. linetype. breadth and frame of drawings according to the characteristics of the general arrangement drawing to passenger shippings. the main functions of the second module is to establish and extend graph library, retrieve from graph library and output graph blocks. using the parameterization design method to design interactively and modify automatically graphs of the local cabin are the tasks of the third module. in the help module, the drawing specifications of passenger shipping are integrated, such as equipments of anchor and moor, arrangement of cab, cabin and baggage, measures to come through and ration of passengers, etc. there are some advantages in the proposed system, such as friend interface, operation easily, drawing conveniently and modification automatically

    其中初始化繪圖環境模塊主要針對客船總布置圖繪制的特點來完成比例、線型、圖幅和圖框的設置;客船總布置圖圖庫模塊主要完成圖庫的建立和擴充、圖庫的查詢以及圖塊的輸出;局部艙室參數化設計模塊採用參數化技術完成對局部艙室圖形的自動修改以及交互設計;客船規范幫助模塊則集中了一些武漢理工大學碩士學位論文客船繪制規范,如錨泊及系泊設備、駕駛室、乘客艙室及行李的放置、脫險措施及乘客定額等規范。
  3. Hong kong science park signs second anchor tenant

    香港科學園與第二個主要租戶簽約。
  4. The design flow capacity of the anchor street sewage pumping station is 3138 litres per second and the assumed peaking factor would be 3

    晏架街污水泵房的設計泵水量是每秒3138公升,而假設的峰值因數是3 ;
  5. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  6. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. Taking a qingdao hotel second phased project deep hole excavated for building foundation as example, the paper introduces the application of the demolition vibration in the complex peripheral environment and the geological condition, the influence, crag body vertical excavates regarding nearsightedness, the pre - stressed anchor rod and the earth nail unify support and protect the technology in the project of the crag body side slope

    摘要以青島某飯店二期工程深基坑為例,介紹了在復雜的周邊環境和地質條件以及有爆破振動的影響下,對于近似垂直開挖的巖體邊坡,預應力錨桿與土釘結合的支護技術在邊坡支護工程中的應用。
  8. In europe, hantec also plans to establish its second anchor point after paris

    歐洲方面,集團計劃在巴黎以外增加多一個據點。
  9. The second part of this thesis, sums up technologies of bridge consolidation all over the world, states the application of anchor spraying and the whirl spraying to bridge construction. ansys software ' s application in bridge structure

    本文下篇,歸納總結國內外橋梁的加固增強技術;介紹錨噴與旋噴技術在橋梁結構加固增強工程中的實際應用;以及ansys軟體在橋梁中的應用。
分享友人