section cable 中文意思是什麼

section cable 解釋
扁形電纜
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • cable : n 凱布爾〈姓氏〉。n 1 【造船】錨鏈,錨索,(周長10英寸以上的)左捻三根三股索;粗索,巨纜;鋼絲繩...
  1. In order to considering the affections of the adjacent zone out of the girdler section, the internal - forces of two end surface which were obtained by the horizontal shaft system analysis are exerted on each model respectively. moreover, the weight, cable force and prestressing forces including girder longitudinal, diaphragm transverse and inclined web vertical directions are considered

    考慮到梁段以外附近區域的作用,在其兩端面上施加了由平面桿系結構分析所得的端面內力,另外,索力和預加力(梁縱向、橫隔梁橫向、斜腹板豎向)也施加在相應的位置,分析了箱形主梁在自重、索力和預應力作用下的空間應力效應。
  2. Make use of computer aided cable laying technique engineers can reach hint information in advance in the light of the electric cable trend, cable quantity in the characteristic section. accordingly installing bracket and cable better, save material and increase efficiency

    利用計算機輔助電纜敷設設計技術,可事先根據電纜走向、特徵截面中電纜情況得出提示信息,從而有目的地安放橋架和敷設電纜,節省材料,提高效率。
  3. Article 61 for those who violate the provisions of section 2 of article 11 of this law by illegally occupying or utilizing the land for substation facilities, transmission line corridors, and cable channels, the local people ' s governments at and above the county level shall order them to rectify within a given time period ; if a rectification is not made within the specified time, the obstacles shall be forcefully eliminated

    第六十一條違反本法第十一條第二款的規定,非法佔用變電設施用地、輸電線路走廊或者電纜通道的,由縣級以上地方人民政府責令限期改正;逾期不改正的,強制清除障礙。
  4. Cable supplement support scheme and parameter on big section entry

    大斷面巷道錨索補強支護方案
  5. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土拱橋的拱軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫系統、合龍設計及其細節、管內混凝土的泵送、吊桿、系桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  6. Note : when actually applying, choose suitable type cable according to the pipe lenght, heat loss, work voltage, number of core wires. and core wire ' s section areas

    注:實際選用時應根據管道長度、散熱量、工作電壓和芯線數,計算芯線截面而定。
  7. The seperated pair of main ribs section was made up by bridge panel and girder, because its construction is convenient, used widely in the prestressing force concrete cable - stay bridge of large span

    回答:分離式雙主肋截面是由橋面板與邊主梁組合而成,由於其施工方便,在大跨度預應力混凝土斜拉橋中得到廣泛應用。
  8. There must be a marine casualty happened every 4 days before 1984, the amount of marine casualty happened at this area corresponds to 1 / 7 amount of the whole changjiang " marine casualty, so mariners gave it a name as " mouth of tiger ". due to the specific geographical condition and the extremely representative vessel traffic management of changjiang yingongzhou channel section, many intelligent people began researching and practicing the vessel traffic management of this changjiang " s down - stream complicated channel section from 1980s, at dec 15th 1984 the authority at that time - changjiang yingongzhou channel section previously ; up to the last years of 1980s ministry management administration applied traffic control on changjiang yingongzhou channel section previously, up to the last years of 1980s ministry of communications assigned shanghai marine college, shanghai ship & shipping research institute and changjiang harbor superintendence administration to make feasibility demonstrate about modern vts of zhenjiang traffic control section ; in 1990 dasha radar station which is the first radar vts station with inner river was finished, groped a new way for applying modern radar traffic control of vessel traffic management ; in 1997 the vtms of changjiang " s down - stream from nanjing to liuhekou was completed with connecting net and came into operation formally, meanwhile the signals of dasha radar station were conveyed to vts center by light cable, and then united applying vessel traffic management upon the whole authorized area ; in jun 2001 jiangsu msa made changjiang yingongzhou channel section as the first experimental group of creating " civilized, safe, passable channel activity, updating dasha radar antenna and receive - transmitter building closed - circuit television monitor system, setting uo safety warning board, starting navigational route reformation, carrying out united construction

    1984以前這里平均每四天就發生一起海損事故,事故數占整個長江的1 7 ,被行船人稱為「老虎口」 。長江尹公洲航段緣其極為特殊的地理區位條件和極具代表性的船舶交通管理,從上個世紀八十年代初就有識之士開始了這個長江下游最復雜航段的船舶交通管理探索和實踐。 1984年11月15日當時的長江航政管理局在長江尹公洲水域率先施行交通管制;到八十年代末交通部委託上海海運學院、上海船舶研究所和長江港監局聯合開展鎮江交通管制段建立現代化交管系統的可行性論證; 1990年大沙雷達站? ?內河第一座雷達交管站建成,摸索實施現代化雷達交管的船舶交通管理新途徑; 1997年長江下游南京至瀏河口船舶交通管理系統建成聯網投入正式運行,同時將大沙交管雷達信號通過光纜傳輸至交管中心,統一實施全轄區船舶交通管理; 2001年6月江蘇海事局將長江尹公洲航段作為第一批創建「文明平安暢通航段」活動試點航段,更新大沙雷達天線和收發機,著手閉路工業電視監控系統建設,設立安全警示牌,啟動航路改革,開展聯合「共建」 。
  9. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨塔斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方面作了詳細地計算分析和比較。
  10. Secondly, the basic principle on optimal design of structure is presented. based on the characteristics of aqueduct - stayed optimal design, cable optimization, aqueduct body selection optimization and aqueduct body vertical section optimization are included. the prestresses of cable - stayed, the dimension of aqueduct and the number of reinforcing steel bar are chosen as the design variables

    根據斜拉式渡槽優化設計的特點,本文將槽身優化分為索力優化、槽身橫斷面優化以及槽身縱斷面優化三個方面進行優化設計,確定斜拉索預應力、槽身斷面尺寸、槽身橫向及縱向預應力鋼鉸線配筋數量等槽身設計的主要變量。
  11. Since it is difficult for the cable or beam model to consider the large deformation in the pipe crossing section, the fem analysis with shell element has been proposed to investigate the response of pipe. takada ( 2000 ) proposed a simplified design formula to obtaining the maximum strain in steel pipes based on the parametrical study using a beam - shell hybrid fem

    現在的抗震規范和有關研究中,還很少有估計大變形時管子內的應力應變的方法,雖然2000年高田至郎等人基於殼有限元模型的參數研究提出了設計用的簡化計算公式,但在他們的分析模型中存在一些問題有待改進。
  12. Cable trunking and cable ducting systems for electrical installations - particular requirements for slotted cable trunking systems intended for installation in cabinets - section 3 : slotted in cabinets

    電氣裝置用電纜導管和電纜管道系統.配電箱內安裝的線槽電纜主幹系統專門要求.第3節:配電箱內開槽
  13. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過索塔錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合索塔受力的實際工況,對異型截面斜拉橋索塔錨固區節段最不利斷面在環向預應力與索力共同作用下塔壁的應力響應進行了研究。
  14. Application : yf series production line is designed for extrusion of pvc plastic door ' s and window ' s profile and cross - section cable pipes, aluminum - plastic composite profiles and etc. pvc profiles are widely used in the building industry, home and office decoration

    應用: yf塑窗異型材生產線配用錐雙或平雙螺桿擠出機,可加工pvc塑料門窗異型材、鋁塑復合異型材、異型電纜多孔穿線管、裝飾型材等。
  15. - ii - 5. with the consideration that the cross section of the cable - stayed structure and the rigid frame structure ' s are not uniform, a new joint solution was presented for these different sections

    5 、針對金馬大橋斜拉橋側主梁截面與t構側主梁截面形式不統一的問題,提出了一種不同結構斷面的新型連接方法。
  16. Electric cables - calculation of the current rating - part 3 : sections on operating conditions - section 1 : reference operating conditions and selection of cable type

    電纜.額定電流的計算.第3部分:操作條件部分.第1節:標準操作條件和電纜型號選擇
  17. Cable trunking and ducting systems for electrical installations - part 2 : particular requirements - section 4 : service poles

    電設備用電纜干線系統和電纜管道系統.第2部分:特殊要求.第4節:工作電極
  18. Stress value of the characteristic spot on the tower was supplied, and some effective methods were put forward for optimizing the design of the single section cable tower and the establishment of the analytical model in theory

    給出了塔壁特徵點處的應力值,為異型截面索塔的設計優化與理論分析模型的建立提出了有效的方法。
  19. Analysis could also show, to improve the stress distribution of the twin - box single cross section of cable - stayed bridge, it is the best way by thickening the bottom flange

    分析還表明,加厚底板對斜拉橋雙箱單室箱形主梁應力分佈的改善效果最佳。
  20. Furthermore, combining with the experiment of yibin zhongba jinshajiang cable - stayed bridge concrete model, this thesis using finite element method studies shear lag effect of the cable - stayed bridge with n cross section and offers suggestion to the project

    此外,本文結合宜賓中壩金沙江斜拉橋模型實驗,利用有限元程序和模型實驗方法,研究雙主肋形截面斜拉橋的剪力滯效應,對雙主肋截面斜拉橋的設計和施工提供一定的參考。
分享友人