section engineer 中文意思是什麼

section engineer 解釋
工段工程師
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • engineer : n 1 技師;工程師。2 機械設計者,機車製造人。3 (輪船的)機師;〈美國〉(火車的)司機;駕駛員。4 ...
  1. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  2. Came 1953 room engineer, factory planned engineer of secretary of room of vice director of technician of workshop of jilin paper mill, workshop, factory director, plant 1967 division deputy section chief

    1953年至1967年吉林造紙廠車間技術員、車間副主任、廠長室秘書、廠工程師室工程師、廠計劃科副科長。
  3. 16 " tests on completion " means the tests specified in the contract or otherwise agreed by the engineer and the contractor which are to be made by the contractor before the works or any section or part thereof are taken over by the employer

    16竣工檢驗指合同規定的或由工程師與承包商另行商定的檢驗,這些檢驗是由承包商在僱主對工程或其任何部分區段接收之前進行的。
  4. Equal products by other manufacturers, approved by the engineer and owner, will be acceptable in accordance with the substitute equipment requirements in the general conditions section of these specifications

    由其它製造商生產的類似產品,需要經過工程師和業主的認可,並符合本規格說明書運行環境章節中替代產品的相關要求。
  5. Equal products by other manufacturers, approved by the engineer and owner, will be acceptable in accordance with the substitute equipment requirements contained in the general conditions section of these specifications

    由其它製造商生產的類似產品,需要經過工程師和業主的認可,並符合本規格說明書運行環境章節中替代產品的相關要求。
  6. Postgraduate : pu liangtao supervisor : professor shang shouing senior engineer huang gang the research on influence of the post - casting section of continuous rigid bridge suffered vibration of train travelling is preseated in this thesis according to related project. based on theorize analysis, expriments of material properties and members under deformed vibration, verification of isolating and reducing vibration in building as well as construction technology and quality control, the effect of post - casting section suffered deformed vibration is studied thoroughly. through the analysis of 28 tests of shear strength with post - casting section under deformed vibration, the related laws are deduced. and the analysis of finite element method, the studies of quality control and construction technology are also completed

    通過現場測試、模型和試塊的模擬振動成型試驗、加載破壞試驗、理論分析、現場減振隔振試驗、施工工藝和質量控制等一系列全面、系統的研究工作,認真、深入地研究了現澆混凝土受火車行駛振動的影響,特別是在約束構件后澆濕接頭區段內現澆混凝土受火車行駛振動影響研究方面作出了開創性的工作,完成了振動使濕接頭區段受到彎曲變形影響條件下的構件模擬振動試驗、抗剪強度試驗。
分享友人