section of foundation 中文意思是什麼

section of foundation 解釋
基礎剖面
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  • of : OF =Old French 古法語。
  • foundation : n 1 建設,創設,創立。2 基礎,根本;根據;地基,地腳。3 基金;捐款;用捐款創辦的事業;慈善機關;...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. Because the soft deposit contains silt, floury thin sand, medium thin sand, fill section and so on, the scheme of foundation treat can not be easily decided

    由於軟基中含有淤泥、粉細砂、中粗砂、雜填土等,且土質很不均勻,基礎處理方案很難確定。
  3. The " hong kong cinema retrospective " section of the annual hong kong international film festival hkiff has been since the late 1970s organising topical programmes and publishing accompanying catalogues, laying the foundation for methodic studies of hong kong cinema predicated on the retrieval of dissipated film prints, compilation of filmographies, and erudite papers contributed by scholars and critics

    香港國際電影節中的香港電影回顧部分,自七十年代末每年按專題舉行回顧展,過程中追尋影片拷貝下落整理年表目錄邀請學者和影評人撰寫文章,為香港電影研究奠下了深厚的基石。
  4. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  5. Figure 10 - typical section of caisson foundation for cooling water pumping station

    圖10 -冷卻用水抽水站沉箱地基剖面圖
  6. Figure 7 - typical section of rock fill mound foundation for cooling water pumping station

    圖7 -冷卻用水抽水站毛石堆地基剖面圖
  7. This paper deals with seismic response of a tunnel - soil system immersed tunnel , as an underground structure , must be compatible with the deformation of the surrounding soil thus the simplified model for a tunnel - soil system is established through two steps at the first step , an mdof system is developed for modeling the foundation soil to this end , dynamic behavior of the foundation soil is analyzed a typical section of the foundation soil simplified as a single mass - spring system on the basis of some equivalent criteria those mass are linked longitudinally by elastic springs to form an mdof system at the second step , the tunnel is treated as a beam on elastic foundation ; that is , the tunnel is connected with the soil massed to form a tunnel - soil system this model has been applied to the seismic analysis of huangsha fangcun immersed tunnel across the pearl river in guangzhou design recommendation is proposed on the basis of this analysis

    研究沉管隧道在地震條件下整體受力的分析方法分兩步建立計算模型第一步通過分析場地地基土切片的動力特性,根據等效原則將其化為等效單質點體系,然後在縱向用等效彈簧連接而成為多質點體系的地基土計算模型;第二步將隧道看作彈性地基梁與上述多質點體系通過等效彈簧連結而得到土隧道體系的計算模型本文結合廣州黃沙芳村珠江水下隧道工程實例建立了具體的計算模型並對多種不同的約束條件,進行了縱向與橫向地震響應時程分析,為該隧道的抗震設計提供依據
  8. Various previous methods after the loading is constant are summarized and classified into two categories : semi - math methods and pure - math methods, the common and difference among these methods is discussed. then, by analyzing the characteristics of the process of the foundation settlement, the model for predicting foundation settlement based on " law of massaction " is put forward. this paper relies on the research of the section of the soft foundation of the shen zhen bay

    本文總結了以往荷載穩定后的沉降預測方法,將其劃分為半數學方法與純數學方法,尋找各預測方法相互之間的聯系;其次區別于傳統沉降預測方法的研究途徑,從沉降過程的發展特徵出發,根據描述物理化學反應過程發展特徵的質量作用定律原理,探討了地基沉降預測的「質量作用定律」模型。
  9. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. And also about the objective conditions for developing is given to the well consolidation technology with sand - packs in soft foundation treatment area and the consolidation technology with cement - mixed piles in transitional section of road and bridge areas, and the detailed introduction is also given about workmanship for filling works in subgrade body, for filling works in transitional sections of the subgrade, and for construction of base bed of the subgrade. in each part caution items in the construction and the relevant technical issues are summarized

    然後著重介紹了秦沈客運專線一般軟土地段地基處理袋裝砂井加固技術、路橋過渡段水泥攪拌樁加固技術,並對路基本體填築施工工藝、路基過渡段填築施工工藝,路基基床施工工藝也進行了詳細的介紹,在每一部分中對施工注意事項及有關技術問題進行了總結歸納。
  13. Taking the traffic load as moving point load, the deformation characteristics of longitudinal section of pavement and composite foundation under moving point load are analyzed, considering the effect of pore pressure, traffic velocity, parameters of pavement structure and subgrade. finally, two examples of pavement section and soft subgrade, longitudinal section of airport runway and composite foundation are calculated

    將交通荷載簡化為移動的集中荷載,計算分析了單次移動加載和循環移動加載條件下道路縱截面與復合地基共同變形特交通荷載作用下道路與軟土復合地基共同作用性狀研究性,探討了孔壓、行車速度及道路結構層和地基參數對道路變形的影響。
  14. According to the question of foundation engineering from test section ( lko + 900 to lk1 + 000 ) of xichang - - panzhihuang express highway, this paper put up important systems analysis and study on the deformation of roadbed which is filled by special stratum on site - - xigeda stratum

    本論文結合西攀高速公路試驗路段( lk0 + 900 lk1 + 000 )的地基工程問題,重點對該區的特殊地層? ?昔格達地層填築路堤的變形問題進行了分析和研究。
  15. The first section of this thesis is mainly on theory, discourses on the necessity, the contents, the methods, the process and the conclusion of architectural programming of space composing in high - rise office building. the thesis also carries on deep research to quantitative analysis and scheme apraising , provide a set of easily operating method modes , attempt to establish the system of architectural programming of space composing in high - rise office building, lay a foundation for furthering researching in future

    論文第一部分是理論篇,從高層寫字樓空間組成建築策劃研究的背景、必要性、內容、方法程序、結論等方面論述,同時對量化分析和方案評價兩個部分進行了深入的研究,提供了一套操作性很強的方法模式,試圖建立高層寫字樓空間組成建築策劃的系統框架,為將來進一步深入研究打下基礎。
  16. According to the relevant section of electric power transmission design, the design idea and method for the rock foundation in yichang district were explained

    文中就宜昌地區巖石基礎的設計思路和方法並依據電力工程輸電設計手冊的有關內容闡述了見解。
  17. Figure 8 - typical section of driven pile foundation for cooling water pumping station

    圖8 -冷卻用水抽水站打入樁地基剖面圖
  18. Proposal design for foundation pit excavation support for east special area of traffic center in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期交通中心東側特殊區域圍護方案的設計
  19. Proposal optimization and practice on large and deep foundation pit excavation support for main building in terminal section of shanghai pudong international airport phase project

    上海浦東國際機場二期航站區主樓深大基坑的圍護方案優化及實踐
  20. This paper tells an evaluation method based on statistical analysis of geology data ? according to the history of geology change and analysis of project geology about the research section of lidu slope of hurong national highway located in south - west of hubei province, based on abundant actual investigation and experimental data, stressing on tracing the history and rules of development of slope change, we divide the data of investigation and test into two classes, one is external physical feature and structural performance, the other is factor of internal and external dynamic environment, following the analysis of mathematics statistical analysis, which points out the proportion of foundation of geology judgement and puts forward a valid identification beacon of stability

    本研究內容是一種以地質數據統計分析為基礎的評價方法。根據滬蓉國道南里渡滑坡研究區段的地質歷史演變結合工程地質類比法,以豐富的實際勘察、試驗資料為依據,以追索滑體的演化歷史和發展規律為重點,將滑體的勘察、試驗資料劃分為外部形態與結構性狀和內外動力環境因素兩大類,通過數理統計分析,給出地質判據的權重,提出切實可行的穩定性判別標志。從而對斜坡穩定性提出合理的、有說服力的綜合評價。
分享友人