sediment pile 中文意思是什麼

sediment pile 解釋
沉積物堆積
  • sediment : n. 1. 沉澱(物);沉渣。2. 【地質學;地理學】沉積物。
  • pile : n 1 軟毛,絨毛;毛茸。2 (布、絨的)軟面。vt 使起絨。adj d 有絨毛的。n 痔瘡;〈pl 〉痔。 blind pi...
  1. The weight of a deltaic pile of sediment may be so great as to depress the earth's crust, thus forming a moat around the depocentre.

    三角洲沉積物堆積的重量可以大到使地殼下沉的程度,因此在沉積中心周圍形成一條深溝。
  2. Today, cast - in - situ piles are more widely used in deep foundation engineering because of their many advantages, such as better adaptability to various ground condition, providing enormous bearing capacity by a single pile and smaller dosage of reinforcing steel bar. but, their own disadvantages, such as sediment under tip, clay slurry around pile, friction and tip resistance disagreement and initial ground stress freeing, limited their bearing capacity, lowered the utilization ratio of material and increased the settlement

    灌注樁,因其對地層適應性強、能提供較大的單樁承載力、鋼筋用量少等優點,在目前深基礎工程中得到了極為廣泛的應用。但是,灌注樁的固有缺陷,諸如孔底虛土;孔壁泥漿;端阻、側阻發揮不同步;鉆孔后原地應力釋放等,限制了其承載力的發揮,使得材料利用率不高,沉降較大。
  3. There is a serious sediment deposition in the wharf apron of an alongshore pile wharf

    摘要順岸式樁基碼頭前沿會發生較?嚴重的泥沙淤積。
  4. Analysis results show that the main factor of sediment deposition is the decrease of flow velocity in the wharf apron caused by pile resistance effects

    樁基的阻水作用,減小了碼頭前沿的水流速度,是碼頭回淤的主要原因。
  5. For different upstream conditions, thickness of sediment in the permeable pile dike region may reach 0. 67 m, and largest thickness is nearly 1. 9 m, and largest width reaches 1 km

    不同入流條件下的主過流區壩段的灘面淤積體厚度可達到0 . 67m以上,最大厚度可接近1 . 9m ,淤積體最大寬度可達1km 。
  6. During construction, special building methods were used to limit environmental damage, such as the piles being bored into the seabed rather than pile driven, to avoid mud sediment settling on the corals and killing them. most of the superstructure was prefabricated off - site, brought in by barge and then placed in position by crane to minimise the pollution, rubbish and noise

    例如裝設支撐中心的樁柱時採用鉆挖形式,取代普通的打樁方式,務求減少翻起海床的沙泥,避免珊瑚窒息及死亡大部份上層建築組件是在建築地點以外的地方預先製作,並由駁船運到海下,再以吊車裝嵌,從而把施工帶來的污染垃圾及噪音減至最少。
  7. In view of load transferring capability of rock - socketed piles, this paper compares rock - socketed piles with non - rock - socketed piles, analyzes influencing factors ( pilelengtru pile diameter pilemodulusx character of bearing stratuiru mud hull sediment of pile bottom and roughness ) on force character. with different load transferring functions, a set of analytical equation for single pile settlement calculation of rock - socketed piles are established : three stages of p - s curve from analytical equation are gained which are straight linex curve x straight line ; and relationship curves in different pile modulus and in different rock - socketed length

    根據所選用的不同的荷載傳遞函數,導出了嵌巖樁單樁沉降計算的一種解析演算法,分析得出嵌巖樁p ? s曲線按荷載變化分為直線?曲線?直線段三個階段,不同樁身模量下承載力的變化曲線,樁身模量、樁端巖石強度是影響單樁承載力的重要因素,不同嵌巖深度下端阻比的變化曲線。
分享友人