sedimentation deposition 中文意思是什麼

sedimentation deposition 解釋
降堆
  • sedimentation : n. 1. 沉澱[沉積、沉降](作用)。2. 沉積學,沉積法。
  • deposition : n. 1. 免職,罷免;廢位。2. 淤積[沉積](物,作用)。3. 耶穌從十字架上放下(的畫、雕刻)。4. 寄存,委託;委託物。5. 【法律】口供,證言;口供書。
  1. Sedimentation embodies the processes of erosion, entrainment, transportation, deposition, and compaction of sediment.

    泥沙問題包括泥沙的侵蝕、挾帶、輸移、淤泥和密度的過程。
  2. In this paper, the deposition evolution process in qtx reservoir are studied, the incoming water and sediment, the operation data, and the time and space distribution of longitudinal and lateral sedimentation in reservoir are analyzed in detail, and the longitudinal scouring and sedimentation and lateral deformation law in reservoir tidal flat and mainstream under different operation way are summarized in every operation period

    本文以黃河青銅峽水利水電樞紐工程水庫淤積演變過程為研究對象,對青銅峽水庫來水來沙組成、水庫運行資料、水庫縱橫向泥沙淤積時空分佈等進行了較詳細的分析,總結了青銅峽水庫各個運行時期不同運行方式下水庫灘槽縱向沖淤和橫向變形規律。
  3. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫壩體前的淤積和「水力沖填」築壩技術的探索和研究,創立了淤地壩壩體自然加高的理論,並提出了具體的導流方式、壩體防沖措施及圍堰消能蓄洪、留淤脫水設計。
  4. The sedimentary facies of the jurassic penglaizhen formation in the studied area can be described as follows : from the edge of the basin, the source of deposition, to the center of the sedimentation are alluvial fan facies fluvial facies fan delta facies delta facies lake facies and lake floor fan facies in turn

    研究區侏羅世蓬萊鎮期沉積盆地的沉積相類型分佈,從盆緣近物源區至盆地沉降-沉積中心區依次為沖積扇、河流相、扇三角洲相、河控三角洲相、湖泊相和湖底扇相等沉積體系。
  5. On the one hand, the sediment density current often does a great harm to the reservoir, and causes a big loss of reservoir ' s storage capacity or makes reservoir severe deposition ; on the other hand, sediment outflow by density current is an effective measure to mitigate sedimentation

    異重流(本論文中主要指因含沙量的差異而形成的渾水異重流)一方面常常給水庫帶來嚴重的危害,加速水庫的淤積和庫容的損失;但另一方面它又為水庫排沙提供了一種極為有效的途徑? ?水庫異重流排沙。
  6. The comparison between the experimental data with numerical simulation show that the model have a higher precision in the lateral scouring and sedimentation deformation, time interval quantity of deposition, and output sediment concentration process during sand peak at various cross section and is applied fairly good to practical engineering

    青銅峽水庫的實測資料對模型驗證結果表明:模型在水庫不同斷面橫向沖淤變形、時段淤積量、沙峰期出庫含沙量過程都具有較高的精度,能較好地運用於工程實際。
  7. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路基填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地基、路基和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層巖性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地基、有些作為路基,對其基本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級配等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂巖和泥巖,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  8. The multilayer composite including a hard component tz - 3y20a and a plastic soft component mo has been fabricated by particle sedimentation method. by choosing appropriate settling parameters and dispersed medium, the tz - 3y20a / mo multilayer composite has been obtained via alternating deposition of tz - 3y20a and mo according to the design of individual layer thickness and layer thickness " ratio

    採用顆粒沉降成型工藝,選用適當的沉降參數與分散介質,將tz - 3y20a陶瓷粉和mo金屬粉按設計的層厚和層數進行交互沉降,得到預成型體,再經1500 ? 20mpa ? 1h熱壓燒結,制備出緻密的tz - 3y20a mo疊層材料。
分享友人