service tunnel 中文意思是什麼

service tunnel 解釋
輔助隧道
  • service : n 塞維斯〈姓氏〉。n 1 服務;工作;公務;職務;事務;業務;行政部門(人員),服務機構(人員)。2 ...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. The ferry service of bygone days has been replaced by that tunnel.

    往日的渡口已被那個隧道取代。
  2. Study on tunnel lining service - life prediction

    隧道襯砌結構耐久壽命預測研究
  3. Seismic survey is a new method used to civil engineering area in recent years. it was widely applied to survey or detecting of roadbase, dam base, foundation of building, tunnel, river bed, lake bed and etc. the chief methods are reflection method, refraction method, wave velocity testing, surface ware survey and transverse wave suivey. seismic survey can divide different layer, measure the incidence of sediment stratum, detect the structure of rock, test the handle effect of surface wave survey, we can calculate the carrying capacity of foundation and other mechanical parameters. this technique can give service to some big engineering departments such as highway developing company, survey design company, water supply company, plan bureau, construct bureau etc

    應用於工程的主要方法有反射波法折射波法波速測井面波法及橫波勘探等。地震勘探能詳細劃分地層高精度地確定沉積地層的傾角能夠準確探明巖體構造褶皺斷層破碎帶裂隙帶對于回填工程路基壩基,地震勘探可以檢測其回填處理效果對于隧道工程,可以探測隧道洞體的圍巖分類及洞口地質情況利用面波勘探所得到的瑞利波速度,可以準確推算地基的承載力動彈模量等力學參數。
  4. Technical code for service gallery of railway tunnel

    鐵路隧道輔助坑道技術規范
  5. Gmb routes 4a, 4b, 35m and 36x on journeys to southern district will be diverted via leighton road, canal road west, canal road flyover, victoria park road, causeway bay flyover, gloucester road service road, canal road flyover and aberdeen tunnel

    號線前往南區將改經禮頓道堅拿道西堅拿道天橋維園道天橋告士打道西行線堅拿道天橋及香港仔隧道
  6. Rs route hr36 on journeys to ap lei chau will be diverted via percival street, sharp street east, canal road east, canal road west, canal road flyover, victoria park road, causeway bay flyover, gloucester road service road, canal road flyover and aberdeen tunnel ; and

    洲將改經波斯富街霎東街堅拿道東堅拿道西堅拿道天橋維園道天橋告士打道西行線堅拿道天橋及香港仔隧道及
  7. Ctb routes 6a and 6x travelling on queen s road east heading for southern district will be diverted via queen s road east, canal road west, canal road flyover, victoria park road, causeway bay flyover, gloucester road service road, canal road flyover and aberdeen tunnel

    號線將改經皇后大道東堅拿道西堅拿道天橋維園道銅鑼灣行車天橋告士打道輔助道路堅拿道天橋及香港仔隧道
  8. Of the respective quantities of various types of fire service installations and equipment installed in each toll road tunnel ; and

    每條收費行車隧道已設置的各類消防裝備的數目;及
  9. To operate via lin cheung road, jordan road, gascoigne road, chatham road south, flyover, hong chong road, cross harbour tunnel, gloucester road, flyover, victoria park road, flyover, gloucester road, gloucester road service road, fenwick street, hennessy road, queensway, des voeux road central, wing wo street, connaught road central and macau ferry pier access road on its journey to central

    前往中環的班次將途經連翔道佐敦道加士居道漆咸道南天橋康莊道海底隧道告士打道天橋維園道天橋告士打道告士打道輔助道路分域街軒尼詩道金鐘道德輔道中永和街干諾道中及港澳碼頭通路。
  10. If we can get to the thunderbird 1 silo, we can escape through the service tunnel

    要是能到雷鳥一號的發射井我們就可以從維修通道里跑出去
  11. It is clear that the existing short overrun tunnel east of hong kong station was a compromise solution to reclamation phasing problems and is not adequate to meet safety and operational requirements for improved service levels

    -香港站東面現有較短的掉頭隧道,明顯地只是為遷就填海分期施工而作出的權宜之計,在服務水平提升后,並不足以應付安全和運作兩方面的要求。
  12. Of the date ( s ) at which the existing quantities of various types of fire service installations and equipment installed in hung hom cross - harbour tunnel was ( were ) stipulated ; whether it has assessed if the quantities of these installations and equipment are adequate to cope with fire and emergency incidents in the tunnel caused for various reasons ; if so, of results of the assessment

    紅?海底隧道現時設置的各類消防裝備的數目是在甚麼時候規定的;有否評估這些裝備的數目是否足以應付隧道內由於各種原因引起的火警和突發事件;若有,評估的結果是甚麼?
分享友人