settlement forecast 中文意思是什麼

settlement forecast 解釋
沉降預測
  • settlement : n 1 解決。2 決定。3 鎮定;安定。4 固定;定著。5 澄清;沉澱;沉澱物;沉積物;【地質學;地理學】沉...
  • forecast : vt. (forecast, forecasted; forecast, forecasted) 預測;預報(天氣)。n. 預測;預報。 a weather forecast 天氣預報。
  1. The inverse analysis method based on model discerning and all these curve fitting methods are used to forecast settlement of xuzhou - suqian expressway after completing. the result from calculation and analyzed shows the thinking and the method in the paper are suitable, and it can be proved its rationality and feasibility in studying and forecasting settlement after construction of the embankment

    結合徐宿高速公路,進行了基於模型識別的路基沉降反演預測和各類曲線擬合法預測工后沉降的計算,通過計算驗證了模型識別反演預測思路和方法的適用性和改進指數法預測路基工后沉降的有效性和合理性。
  2. Finally, two examples show that, the availability and practicability of the new model is verified. the analysis of calculation result of berthiervill test embackment shows different part of compression curve have different influence upon the course of consolidation, and correct coefficient and viscous effect have great significance on deformation forecast. associated with the wenzhou airport runway engineering, the reason of increasing of pore - water pressuer in under - lying soft layer and post - construction settlement are given

    最後,通過兩個工程實例的分析來說明本文模型的有效性和實用性:一是對berthiervill填土試驗場的軟基實測數據和理論成果進行對比分析,闡明考慮結構性擾動和粘滯性效應對分析天然粘土固結壓縮性的重要性;二是對溫州機場袋裝砂井超載預壓工程進行數值模擬,指出停荷預壓期間下臥層孔壓增加和工后沉降大的原因。
  3. This paper introduces all kinds of calculation methods of settlement and the popular research theory at present, expresses the rheology theory and its developing trend in detail. based on the rheology theory, the theory of linear - visco - elastic - plastic model is put forward to forecast the long term creep settlement of soft soil in the metallurgy industrial region at the backward position of haihe river in tianjin

    本文詳細介紹了國內外關于沉降計算的研究現狀,以及當今流行的研究理論,著重介紹了流變理論的研究現狀及其發展趨勢,並在此基礎上提出了用線性粘彈塑性模型理論來預測天津市海河下遊冶金工業區軟土長期蠕變。
  4. So, the engineers often forecast the final settlement basing on the measured settlement data

    為此,工程技術人員往往根據現場實測沉降資料來推算最終沉降量。
  5. Practical design of soft foundation settlement forecast in expressway

    高速公路軟基沉降預測實用設計與研究
  6. One practical design method of soft foundation settlement forecast in expressway

    高速公路軟基沉降預測實用設計方法
  7. In the same time, this paper applied the plane strain fem based on biot theory to analyzed calculated result and observation information hi scene. finally, this paper put forward a settlement forecast model based on the modified gaomujunjie method, using by inversion analysis theory to compare and analyze the settlement process of vhlcp. result indicated that the model inosculated with the fact data and the consolidation degree have finished 86 %, back - work settlement was 87mm

    最後,根據實測沉降資料,採用一維反演分析法,推導最終沉降量計算公式,結合改進后的高木俊介固結度計算方法,建立真空堆載聯合預壓的沉降預測模型,並根據計算結果,對比實際沉降過程,對比表明:所建沉降預測模型與實測數據吻合,由此所得現場試驗的地基平均固結度達86 ,剩餘沉降為87mm ,滿足高速公路質量要求。
  8. The precision of the embankment ' s settlement forecast and analysis should be higher because the design of the expressway back - work settlement is exactly confined. therefore, the traditional algorithm method ca n ' t meet the demands

    高速公路工后沉降的設計要求很高,相應對軟土地基沉降的預測分析精度要求也很高,傳統的計算方法已經無法滿足這一要求。
  9. Data warehouse is a hot research area in 90s its main motif is to provide the decision - maker a powerful tool : gathering the data in pure consistent, relevant pattern, and making use of the data in managing analyzing, data - mining purposec that means that the decision - maker can use the tool to understand, grasp the situation of the business from different directions and forecast the future of it when using data warehouse, the processing speed determines data warehouse ' s practicability and processing ability the hoc ( highway decision center ) system realized before solves some key problems about intermediate scale data, mainly concentrating data warehouse performance coefficient when using hdc in large scale data, it encountered processing speed problem then the settlement of this problem becomes a major research point so, based on the former research achievements, the present task is to construct the renowned data warehouse architecture and its relevant algorithms, then adapts the system to the large scale dataset with data mining functions c this paper is a part of the research in order to construct the powerful system, a key problem is to cope with the processing - speed problem and the data space problem, etc, - caused by the large scale dataset and magnificent dataset this is also the core in the present data mining research this paper ' s motive is to design and realize a decision - tree classifier in the data warehouse system for large - scale dataset

    大型數據倉庫的處理速度問題目前是制約其推廣應用的關鍵所在,也是這一領域的一個重要研究課題,也正是我們當前工作的重點:在前期研究工作的基礎上圍繞提高大型數據倉庫處理速度問題,建立改進的數據倉庫系統模型和相關演算法,開發出面向中級以上企事業單位的、具有數據挖掘和分析能力的大型數據倉庫系統。建立大型數據倉庫所面臨的關鍵問題,是如何妥善解決實際業務數據的大規模、海量特徵所帶來的處理速度和空間等問題,這也是當前挖掘技術研究必然面對的核心問題。本研究的目的是設計並實現大型數據倉庫系統中的分類數據挖掘工具? ?決策樹分類器,主要工作是在綜合了解現有決策樹分類演算法的研究情況的前提下,對決策樹演算法適應大規模數據集的問題進行探討,力求設計出能較好地適應大規模數據的分類器演算法。
  10. Several key theory problems, including in earthquake forecast, couple of flow and settlement equations, and groundwater flow and solute transport in multi - scales inhomogeneity, are put forward in the research of urban geologic hazard

    提出了城市地質災害研究中急需解決的,如地震預測預報、水流方程與沉降方程輻合、多尺度非均質中地下水流與溶質運移等幾個關鍵理論問題。
  11. The dewater calculation result of the south anchor of runyang yangtze river highway bridge ' s shows that the double deck structure model provide a new method to the non linear coupling calculation of deep foundation pit dewater and settlement, forecast and control the distortion of the soil in the pit, engineering construction and design

    潤揚長江公路大橋南錨基坑工程降水計算表明,雙層結構模型為深基坑降水與沉降的非線性耦合計算,基坑土體變形預測、控制,工程施工和設計提供了新的計算分析途經。