sewage treatment works 中文意思是什麼

sewage treatment works 解釋
污水處理廠
  • sewage : n. 1. 陰溝污物;污水。2. 下水道。vt. 1. 用污水灌溉[作肥料]。2. 裝設下水道于(某地)。
  • treatment : n 待遇;作業;處理,處置;討論,論述;【醫學】治療,療法;(種子的)消毒(處理)。 preferential t...
  • works : 的印表機描述格式
  1. Code of practice for design and installation of small sewage treatment works and cesspools

    小型污水處理工程和污水池設計及安裝實用規程
  2. Operation of a sewage treatment works and a 300m long sewage submarine outfall

    營辦污水處理廠及300米長的海底排污管。
  3. Sha tin sewage treatment works opens to the public

    沙田污水處理廠開放予公眾參觀
  4. Spare parts for centrifuges at stonecutters island sewage treatment works

    昂船洲污水處理廠離心機備用零件
  5. Tai po sewage treatment works, stage 5 phase 1

    大埔污水處理廠第5階段第1期工程
  6. 12 specially designed nightsoil collectors will transport the collected nightsoil to sewage treatment works of the drainage services department for disposal

    12輛經特別設計的清糞車將糞便收集后,會將糞便運往渠務署的污水處理廠處理。
  7. 14 specially designed nightsoil collectors will transport the collected nightsoil to sewage treatment works of the drainage services department for disposal

    14輛經特別設計的清糞車將糞便收集后,會將糞便運往渠務署的污水處理廠處理。
  8. Major public sewage treatment works, outfalls, and pollution load in hong kong in 2005

    二零零五年本港的主要的公共污水處理廠排污口及污染量pdf
  9. Earlier, in 1989, a submarine sewage outfall was installed at the cheung chau sewage treatment works, which proved effective in dispersing discharged effluent away from beaches

    在此之前,長洲污水處理廠於1989年曾加裝海底排污渠,污水得以更有效地分散,遠離泳灘。
  10. In the case of the kwun tong typhoon shelter, improved levels of dissolved oxygen have arisen both because of the epd s ongoing efforts to reduce the discharge of wastewater into it, and because of the government s tolo harbour effluent export scheme, in which relatively clean treated effluent has been piped from the sha tin and tai po sewage treatment works in the tolo harbour area and released near the kwun tong typhoon shelter, raising oxygen levels in the water and improving water flow

    另外政府所推行的吐露港污水輸出計劃也使觀塘避風塘的溶解氧逐步提高。吐露港污水輸出計劃是將吐露港區內經沙田及大埔污水處理廠處理過的污水經管道通至觀塘避風塘上游的啟德明渠排放,從而增加了明渠的流量,也提高避風塘的溶解氧水平。
  11. The panel discussed the proposed increase in the approved project estimate for ssds stage i - " stonecutters island sewage treatment works pumping stations, building and site development - 308ds "

    事務委員會討論有關策略性污水排放計劃第i階段"昂船洲污水處理廠:泵房廠房及地盤發展工程308ds "的核準工程預算費的擬議增幅。
  12. Bacterial counts. the government plans to implement hats stage 2a, which aims to disinfect discharges from the stonecutters island sewage treatment works by 2009 subject to community support for the recovery of operating costs through sewage charges

    政府現正籌備於2009年開始實施凈化海港計劃的第二期甲工程,在昂船洲污水處理廠進行污水消毒處理前題是徵收排污費彌補工程營運費用的方案需獲得公眾支持。
  13. This has been further complicated by undisinfected effluent discharged from stage 1 of the harbour area treatment scheme hats since late 2001. though the scheme has brought about general improvement in the harbour s water quality, particularly the eastern side, the discharge is released from a tunnelled outfall from the stonecutters island sewage treatment works, situated around eight kilometers from many of the beaches. tides and currents have resulted in the hats discharge affecting beach water quality in the tsuen wan district

    此外,凈化海港計劃第一期工程已於2001年底完成,該計劃雖能為海港整體水質帶來顯著的改善,特別是東面水域,但昂船洲污水處理廠尚未設置消毒設備,而海底排污渠口則距離荃灣多個泳灘僅約8公里,處理后的污水往往隨潮汐和海流進入荃灣水域,影響區內泳灘水質。
  14. Seminars were specially designed for the participants featuring environmental pollution problems in property management sectors, programme on source separation of domestic waste and environmental estates experience sharing, etc. in 2005 06, a total of five seminars and 13 visits to environmental estate - tin wah estate, tai po kau nature reserve, island west transfer station and stonecutters island sewage treatment works, etc will be organised for the participants

    我們特別為參加者設計了專題講座,內容包括物業管理業常遇到的環境污染問題廢物源頭分類計劃簡介屋苑環保經驗分享等。在2005 06 ,我們除了舉辦五個專題講座外,還為參加者安排13個參觀活動,地點包括環保屋苑-天華大埔?自然護理區港島西廢物轉運站昂船洲污水處理廠等。
  15. The reclaimed water produced is odourless and safe. it is currently used for toilet flushing in nearby public toilets and the ngong ping cable car terminal, and also for rearing aquarium fishes and controlled irrigation within the sewage treatment works

    經再造的水安全無味,現在用於附近的公共洗手間及昂坪纜車站作沖廁用途,部份再造水亦會用於飼養污水處理廠內魚池的觀賞魚,及作為廠內有監控的灌溉之用。
  16. So far, 24 kilometres of large tunnels under the central urban area and a sewage treatment works at stonecutters island, providing chemically enhanced primary treatment for up to 3. 5 million cubic metres of flow per day, have been commissioned

    到目前為止,市區中心地帶已建成24公里長的大型污水隧道,而設于昂船洲的污水處理廠亦已啟用。該污水處理廠採用化學輔助一級污水處理方法,平均每日處理的污水流量多達170萬立方米。
  17. As the first tertiary treatment works in hong kong to produce reclaimed water, the ngong ping sewage treatment works uses a sequencing batch reactor, dual media filter and disinfection process to reduce organic pollutants, suspended solids, nutrients and pathogenic organisms from sewage to a very low level

    昂坪污水處理中心是香港首間處理再造水的三級污水處理廠,採用生物反應池、雙濾層三級濾池和消毒程序,將污水中的有機污染物、懸浮固體、營養物以及病原微生物減至極低水平。
  18. Photo of stonecutters island sewage treatment works, which now treats around three quarters of the wastewater discharged into victoria harbour

    昂船洲污水處理廠處理維港周圍七成半的污水圖片
  19. Environmental protection - sewerage and sewage treatment - shek wu hui sewage treatment works - upgrading environmental protection - sewerage and sewage treatment - tolo harbour sewerage of unsewered areas

    環境保護-水渠及污水處理-為吐露港內未有污水設施地區而興建的污水收集系統
  20. Stage 1 of hats consists of a 23. 6 km tunnel conveyance system and a chemically enhanced sewage treatment works at stonecutters island

    6公里的深層隧道輸送系統,並在昂船洲建造一座化學強化一級污水處理廠。
分享友人