sewer system 中文意思是什麼

sewer system 解釋
(馬路)排水系統
  • sewer : n 1 縫紉者;縫工;成衣師。2 縫紉機。n 陰溝;污水管道;下水道;排水管。 the trunk sewer 下水幹道。...
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. After acquiring the land for the hsinchu station, the following public construction projects will be conducted : transportation system such as road engineering, sidewalk and accommodation road, land preparation, sewerage system, foul sewer, common duct and landscaping

    交通運輸系統工程如道路步道停車場專用道等整地工程雨水污水排水工程共同管道工程及景觀綠美化工程等。
  2. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨水管渠設計中的設計重現期、截流倍數等設計參數的選擇、雨水集水點位置的確定、截流式合流制管渠與截流干管的連接方法以及溢流井溢流量的計算等問題進行了探討。
  3. Condition of drain and sewer systems outside buildings - part 2 : visual inspection coding system

    建築物外部排水和排污系統條件.第2部分:目視檢查編碼系統
  4. The green school in dedham, ma saved the town $ 400, 000 in new sewer - system infrastructure by reducing stormwater runoff from the school grounds

    美國麻薩諸塞州戴得鎮的綠色學校因為減少校園雨水徑流,而為該鎮省下了新下水道系統基礎建設約四十萬美金的經費。
  5. Application of graph theory in the sewer system plan optimization

    圖論在排水管網優化方面的應用
  6. Fc approved a commitment to increase the approved project estimate of 320ds from 487. 6 million by 115. 0 million to 602. 6 million in money - of - the - day prices for ssds stage i : completion of sewer tunnel system from kwai chung to stonecutters island

    財務委員會批準一項承擔額,把320ds號工程項目"策略性污水排放計劃第i階段:完成葵涌至昂船洲污水隧道系統"的核準工程預算增加1億1 , 500萬元,按付款當日價格計算,由4億8 , 760萬元增至6億260萬元。
  7. Pwsc endorsed a commitment to increase the approved project estimate of 320ds from 487. 6 million by 115. 0 million to 602. 6 million in money - of - the - day prices for ssds stage i : completion of sewer tunnel system from kwai chung to stonecutters island

    工務小組委員會通過一項承擔額,把320ds號工程項目"策略性污水排放計劃第i階段:完成葵涌至昂船洲污水隧道系統"的核準工程預算增加1億1 , 500萬元,按付款當日價格計算,由4億8 , 760萬元增至6億260萬元。
  8. Conditions of drain and sewer systems outside buildings - part 2 : visual inspection coding system ; german version en 13508 - 2 : 2003

    建築物外部排水和排污系統條件.第2部分:目視檢驗編碼
  9. After acquiring the land for the hsr chiayi station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵嘉義車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。
  10. After acquiring the land for the hsr tainan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, common duct, water engineering and piping

    高鐵臺南車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程共同管道工程自來水工程及相關管線埋設工程等。
  11. After acquiring the land for the hsr taoyuan station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, public illumination, transportation facilities, parking lot, foul sewer, irrigation, transplanting, common duct, water engineering, piping and bridge work

    高鐵桃園車站特定區區段徵收公共工程施工項目包括:整地工程道路工程雨水下水道工程公共照明工程交通設施工程停車場工程污水下水道工程灌溉工程植栽移植工程共同管道工程自來水工程相關管線埋設工程及橋梁工程等。
  12. After acquiring the land for the hsr taichung station, the following public construction projects will be conducted : land preparation, road engineering, sewerage system, water engineering, foul sewer, public illumination, traditional piping and bridge work

    高鐵臺中車站地區區段徵收公共工程施工項目包括:整地工程道路工程排水工程自來水工程污水工程公共照明工作及傳統管線埋設工程橋梁工程等。
  13. Deep tunnel intercepting sewer system

    地下深層污水截流系統
  14. In addition, the epd was given the authority to require property owners to connect their wastewater to the public sewer system as it became available

    環保署在已建立公共污水收集系統的地區亦有權要求物業業主將廢水管接駁至公共污水管道。
  15. This paper presents the principles of swmm model, which consists mainly of three parts, i. e. ground surface rainfall sub - system calculation, overland flow sub - system calculation and storm - sewer flow sub - system calculation

    摘要介紹了swmm模型原理,包括地表產流子系統演算、地表匯流子系統演算和傳輸子系統流量演算。
  16. At the same time, study on the relation between them needs calculating quantitatively combined sewer system overflow ( cso ) spill volume 、 time and water quality and study the self - purification of contamination in receiving water

    研究截流倍數與水體環境質量之間的關系,則需要定量計算合流制排水系統的溢流水量、水質以及溢流時間,並在此基礎上研究溢流污水在水體中的凈化過程。
  17. In 2001, the sewerage system at sha tau kok control point was effectively connected to a nearby public sewer and the construction of a new sewage treatment plant at man kam to control point has also been in operation since 2001

    本處已於二零零一年採取有效措施,把沙頭角管制站的排污系統接駁至附近的公共污水渠,而在文錦渡管制站興建的新污水處理廠,亦於同年落成啟用。
分享友人