shaft test 中文意思是什麼

shaft test 解釋
井探
  • shaft : n 1 箭;箭桿。2 (槍、槌、斧等的)柄;矛。3 【植物;植物學】稈;莖;柄。4 【動物;動物學】羽軸;...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  1. Directed against the problem on confirming vertical bearing capacity of large diameter cast - in - place pile in the west of coteau area of yunnan province, the paper, analyses the influence degree of the variety of soil physics and mechanics property in area geology condition on bearing capacity of pile foundation, through 5 piles " loading test ; the influence degree of construction technics on bearing capacity of pile foundation under the influence of every exterior factors ; the influence degree of grouting injection around the pile shaft on bearing capacity of pile foundation

    本文針對滇西山區大直徑灌注樁豎向承載力確定存在的問題,進行了5根試樁的靜載荷試驗,分析了區域地質條件下土的物理、力學性質的變化對橋梁樁基承載力的影響程度;地下水對樁承載力的影響程度;各種外部因素影響下,樁的施工工藝對樁承載力的影響程度;通過在樁體周圍土中注漿對樁承載力的影響程度。
  2. Test methods of shaft sinking winches

    鑿井絞車試驗方法
  3. In the test, the influence on the ship resistance and performance ability of changing the shaft angle of the skeg was discussed

    為進一步研究和確定其快速性,製作了船模,完成了阻力試驗和自航試驗。試驗探討了不同尾鰭角度對船舶快速性能的影響。
  4. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些水力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的水流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋水流水力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井水流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很高,盡管水流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  5. Brief analysis on test method for cage guide in mine shaft

    立井罐道測試方法淺析
  6. The main work is done with the help of model experiment. in the flood - relief experiment, the flood carrying capacity of spillway tunnel is checked. in the hydraulic experiment of the diversion power conduit system, the followings are studied : the flow condition and fluctuation in the surge chamber, the distribution of flow velocity before the rack in the surge shaft, the amplitude of stage in the quick gate bay etc. the test step, content and results of different proposals are introduced in details

    本項優化試驗研究的目的主要在於,通過泄洪系統整體水力學試驗,校核泄洪洞的泄流能力;通過發電引水系統整體水力學試驗,研究調壓井內水流流態和水位波動情況、調壓井內攔污柵前流速分佈情況;確定快速閘門井內水位波動幅度;試驗確定壓力管道水擊壓力穿井系數以及泄洪洞弧形門處的水壓力。
  7. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規鉆孔取樣試驗成果的使用應當慎重,對重要工程宜採用探坑、豎井取樣,或採用雙筒薄壁取土技術。
  8. Rotary shaft lip type seals - performance test proceduces

    旋轉軸唇形密封圈性能試驗方法
  9. Rotary shaft lip type seals - performance test procedures

    旋轉軸唇型密封件.性能試驗程序
  10. Rotary shaft lip type seals for automobils ; test ; determination of cold resistant of elastomers ; differential - thermoanalysis

    汽車用唇型旋轉軸密封環.試驗.彈性體耐寒性能測定.差
  11. After reading a large amount of domestic and international about shaft research materials, the thesis combines the concrete experimental condition of the laboratory, and the crankshaft crack modal parameter characteristic go on the theoretical research at different depth different position to smoothshaft, experimental study, test data processing, diagnose system developing work ect

    本論文在閱讀了大量國內外關于軸裂紋檢測的研究資料后,結合實驗室的具體試驗條件,對光軸和曲軸裂紋在不同深度不同位置時模態參數特性進行理論研究、試驗研究、試驗數據處理、診斷系統開發等工作。
  12. Rotary shaft lip type seals for automobils ; test ; test machines and specifications

    汽車用唇型旋轉軸密封件.第10部分:試驗.試驗機器和規
  13. We researched the peculiarity of the small and no loss in efficacy sample book, and established the reliability test method, advanced a check plan for reliability test meeting a specified reliability requirement of the main shaft bearings

    研究了小子樣、無失效數據的特點,建立了主軸軸承可靠性試驗評估方法,提出了滿足一定可靠度要求的可靠性試驗方案。
  14. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖層中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔灌注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖層中的沖孔灌注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  15. The shaft must test in bearings, such as journal bearings, ball bearings, or roller bearings

    軸的軸承必須經過檢測,如徑向軸承、滾球軸承、或滾柱軸承。
  16. A motor that is be directly coupled to a fan - blade or blower - wheel load is to be operated at the applicable test voltage and under no - fan, no - load conditions with the shaft running free

    直接耦合到一個風扇葉片或鼓風機葉輪負荷的馬達,將在適用的試驗電壓下做無風扇,無負荷,軸空轉狀態的運行。
  17. This design is rebuilding its electrical control part, designing an automatic control system with automation technology and single chip computer. after rebuilding the test stand, the oil injection times may be presetted, counted and displayed, then stop counting automatically when count completes in measuring oil volume. the drive shaft rotation speed may be presetted, measured, adjusted and displayed

    利用單片機結合自動控制技術設計一套控制系統,對其進行技術改造,實現試驗臺量油時對其噴油次數預置、計數、顯示,計滿后自動停止;主軸轉速預置、測速、調速、顯示。
  18. Kone has constructed the worlds deepest test shaft in finland, a 330 - meter - long hoistway. this enables us to test the next generation of high - speed elevators with speeds up to 17m s, under conditions similar to those in the worlds tallest buildings

    在芬蘭,通力建立了世界上提升高度最長的電梯測試井道, 330米的提升高度,使我們能在類似於世界上最高樓宇的環境下測試新一代的高速電梯,其運行速度可達17m s 。
  19. Tolerances of shaft extension run - out and of mounting flanges for rotating electrical machinery, test

    旋轉電動機械安裝法蘭和軸外伸部徑向跳動公差試驗
  20. At present the power transmission system of electric mobile is based on series of experiments that destroy parts of the transmission shaft, driving axle, power transfer, gear - box to reach the goal for the test of the limit of working condition of mobile

    目前電動汽車傳動系統試驗主要靠對傳動軸、驅動橋和分動器和變速箱等零部件做一系列破壞性試驗,以達到對汽車產品極限工況的檢測。
分享友人