shear grade 中文意思是什麼

shear grade 解釋
剪切梯度
  • shear : vt vi (sheared 〈古語〉 shore; shorn sheared)1 剪(羊毛等);修剪(樹木);剪(呢絨的)長毛。2 ...
  • grade : n 1 等級,級別;階段;程度,標準,水平。2 〈美國〉(中小學的)年級;某一年級的學生。3 〈pl 〉 〈...
  1. This article discussed the application of shear stress pairing method to evaluation dam base vibration liquefaction of earth - fill dam according to the problem that the sand and gravel layer of main dam base could be liquefied in the condition of seismic intensity grade vll in the design of nierji hydro project

    本文結合尼爾基水利樞紐工程設計中主壩壩基砂礫石層( < 5mm含量> 30 =在地震裂度級工況下可能發生液化的問題,探討了用剪應力對比法在評價土壩壩基震動液化中的應用。
  2. Based above, a two - grade fuzzy comprehensive evaluation model is presented on the ground of the current seismic design code for building. it is that taking the membership of equivalent shear velocity as weight of the model not empirical weight in traditional one - grade model. it has been proved in site classification reasonable

    參照我國現行建築抗震設計規范,改變過去以經驗系數為權重的一級模糊綜合評判模型,以等效剪切波速對各場地土的隸屬度為權重,建立了場地二級模糊綜合評判模型,對場地進行劃分。
  3. Research results show that foundation pit slope soil structure destroy characteristic is subgrade shear strain destroy, namely, it is gradually destroy. lateral displacement of retaining and protecting piles has relations with embed depth, load grade and strength index parameter. soil displacement and timbering pile displacement are in harmony with deformation

    研究結果表明,基坑邊坡土體具有地基整體剪切變形破壞的特點,系漸進破壞的過程;支護樁側向變形是樁嵌固深度、荷載大小、土體強度參數變量的函數;土體的位移和支護樁的位移滿足變形協調條件。
  4. An experimental study on steel fiber reinforced concrete ( sfrc ) thick cap with four piles indicates that the factors affecting its ultimate loads are composed of its effective thickness, steel fiber volume ratio, concrete strength grade, shear span length, steel ratio and the form of reinforcement, in which the factor of the form of reinforcement affecting the ultimate loads of pile cap is distinct

    摘要鋼纖維混凝土四樁厚承臺的性能試驗研究結果表明,影響其極限荷載的因素主要有承臺有效厚度、鋼纖維體積率、混凝土基體強度等級、承臺的剪跨比、縱向鋼筋配筋率和配筋形式等,其中,配筋形式對鋼纖維混凝土厚承臺承載力的影響是很顯著的。
  5. Main working principal is that the bottom scraper with low rotate speed impels materials to form circumfluence in the basin of machine, the impeller of rotor rotating with medium speed can not only add wallop to sand, but also can add shear force to the sand with scraper so that the sand can touch and scrub each other fast ; wind blasting is set to cool the hot sand, remove dust and strip the membrane so that fast speed of regeneration and top - grade used sand can be gained

    主要工作原理是低速轉動的底刮板推動物料在機盆內形成環流,中速轉動的轉子葉片既對砂子施以沖擊力,又與刮板配合對砂子施以剪切力,使砂粒間快速接觸和強烈摩擦,圍圈設風帶鼓風使熱砂沸騰冷卻除塵脫膜,從而達到再生速度快,回用砂質量好的目的。
分享友人