shearing displacement 中文意思是什麼

shearing displacement 解釋
剪切位移
  • shearing : 刮布
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  1. In the full of research, the thesis constructed the dynamic equations of the simplified model, then programmed and computed the feedback gains using lqr method. moreover, the thesis plotted pictures of displacement, velocity, acceleration, bend and shearing force of ship ' s head and middle part in the condition of using cable and not using cable

    在研究工作中,首先對船舶的簡化模型建立了動力學方程,然後採用線性二次型最優控制方法,編寫程序並計算出船體垂向振動固有頻率和最優反饋矩陣,得到控制前後船艏以及船舯部的位移、速度、加速度、彎矩和剪力歷程圖。
  2. Grounded on analysis of the interior factors ( such as valley - side slope structure, stratum structure, fissure without displacement, loess microstructure and shearing strength, etc. ) and exterior factors such as rainfall, earthquake and so on, it is proved that human ' s cutting a terrace of building houses in the loess slope is the main factor of inducement of the landfall

    對谷坡結構、地層結構、節理、黃土的顯微結構特徵、黃土抗剪強度等內部因素和人為斬坡、降雨、溫差等外部因素進行了定性分析。結果表明人為斬坡平基建窯是導致此類崩塌的主導因素。
  3. The stirred fluid and beads have multidimensional circulation motion and self - rotation for the stirrer rotation in the grinding chamber of a stirred media mill. high intensity motion is caused by multi - direction displacement of fluid and beads. the powder is comminuted by compression caused by beads gravity and helical turn for rubbing, impacting and shearing

    攪拌磨磨筒中,在攪拌器的攪動下,物料與磨介作多維循環運動和自轉運動,從而在磨筒中不斷地上下、左右相互置換位置產生激烈的運動,由磨介重力以及螺旋迴轉產生的擠壓力對物料進行摩擦、沖擊、剪切作用而粉碎。
  4. Abstract : based on the deformation characteristics of the tread element at typical load cases, this paper determines the displacement functions of the element by using the energy method and derives the theoretical formulae for the apparent compressive stiffness and shearing stiffness calculation

    文摘:根據輪胎胎面單元在典型工況的變形特點,用能量法確定了胎面單元變形的位移函數,導出了輪胎胎面單元表觀壓縮剛度和表觀剪切剛度的理論計算式。
  5. The results of the analysis proved that the displacement, velocity, acceleration, bend and shearing force of ship ' s head and middle part were controlled effectively with active cable

    通過對模擬結果的分析和研究,發現加上主動纜作動器后,可以有效地對船艏和船腫的位移、速度、加速度、彎矩和剪力實施控制。
  6. In this article, idealized elastic plastic model and three - dimension finite elements programs have applied to analyzing and researching the stress and displacement distribution of 4 high - steep slopes excavated on the wan - liang expressway, and the relationship has been gained between the stress existing in excavated rock slopes and stability coefficient with depth change through the self - made fortrain program ' s application to the computation of slopes " stability coefficient ; at the same time, through the analysis of the slopes " stability coefficient, such conclusion has been gotten that cohesion in the slipping zone has important effect on slopes " stability and some proposals have been presented to improve the anti - shearing ability of the slipping body through enhancement of the cohesion in the slipping body

    本文採用概化均質的理想彈塑性模型,利用三維有限元程序分析了萬梁高速公路4個高陡邊坡開挖各階段的應力及應變分佈,並且編寫了fortran程序用於邊坡穩定系數的計算,得出邊坡巖體應力及穩定系數隨著開挖深度的變化關系。並對邊坡穩定系數的敏感性進行了分析,得出滑帶內聚力的變化對邊坡穩定性至關重要,提出了改善滑帶巖土粘結狀態提高抗剪能力的工程措施。
  7. In this paper, three - tower building with name of oriental tunes square in xiamen is analyzed by the international current program sap2000, considering seismic action in two directions. by structural modeling and calculation, the characteristic of vibration of the multi - tower structure is analyzed, the influences of the rigid ratio of the enlarged base to top tower and translation - torsion coupled effects among several towers are investigated, the inter - story displacement, displacement of the top tower and deformation of tower ' s base floor in x and y major orientation under earthquake action are contrasted with those under wind load. at last, the distributing characteristics of stress of transfer plate and of the normal, shearing stress of mostly vertical elements under earthquake action are studied

    本文以具有3個塔樓的廈門東方時代廣場為分析對象,採用國際通用有限元分析軟體sap2000進行結構建模和分析,考慮雙向地震動輸入,研究結構的振動特性,分析底盤與塔樓剛度比對結構的影響以及多塔之間的扭轉效應和平扭耦聯作用,對比風荷載和地震作用下塔樓在兩個結構主軸方向的層間位移、頂點位移以及塔樓底層的變形,分析地震作用下轉換層樓板的應力分佈特點及主要豎向構件的正應力和剪應力分佈特點。
  8. However, the pre - stressed anchor cables on the upper part of the piles make the whole stabilizing system like freely supported beams or some other h yperstatic structures. with the number of restraints increasing, it makes much easier to control the displacement of the piles and to reduce the bending moments and shearing forces along the piles to a certain extent

    增加預應力錨索后,整個結構體系接近簡支梁或其它超靜定結構,隨著約束的增加樁身的位移控制變得容易許多,同時樁身內力值也在一定程度上減少較多。
  9. The numerical results show that the lateral ground displacement is one of factors that cause pile failures in liquefied ground. at the soft - hard interface, pile may overbear the ultimate moment which leads to bending and shearing failures. therefore, except the effect of large inertial loads from superstructure, the influence of the lateral ground displacement on pile foundation cannot be neglected in a seismic design of pile foundation in lateral spreading ground

    計算結果表明地基的側向位移是與液化有關的樁基震害的主要原因之一,在軟硬交界處樁可能承受了超出樁本身極限抗彎能力的彎矩,容易發生彎剪破壞,在有液化側擴地基中樁基的設計不能僅考慮上部結構震動的影響,地基的水平側向位移對樁基的影響不容忽視。
  10. Precipitation uplifts ground water level and weakens shearing strength of soil, thus results in large displacement in side direction

    大氣降水抬升了地下水位,並削弱了土體的抗剪強度,從而使得土體的側向位移迅速增大。
  11. Based on the assumption that the form of skin friction is not significant, the paper calculate the coefficients through the corresponding equation between shearing stress and displacement, it is appropriate under many conditions. the model of pile foundation is developed based on the above theory and method. the pile is simplified as a nonlinear elastic spring

    本文認為樁側阻力分佈形式對下臥層附加應力的影響不大,從樁的剪應力和樁體位移間的對應關系方程上求解了樁端荷載分配系數,相對比較合理,在大多數情況下是可以為工程所接受的。
  12. Secondly, the push - over analysis is for the three - dimensional solid element model and the plane beam element model. the total shearing force - lateral displacement curve can be obtained from it. and then the total shearing force - lateral displacement curve is converted to pseudo acceleration - period curve and some comparisons are made between the pseudo acceleration - period curve and design response spectrum

    然後,建立了有限元三維實體單元模型及平面桿單元模型,對其進行了push - over分析,並將所得的底部剪力一頂點位移曲線轉化為擬加速度一周期曲線,與規范反應譜進行對比,以此評定該體系的抗震能力。
  13. The structure shearing force takes a one - way increasing trend with the decrease of ratio of beam bending rigidity and pier lateral displacement rigidity and the increasing rate is bigger. when the consolidation at the bottom of pier is elastic consolidation and the structure force is bigger the extreme value mentioned at the above, the structure force will take a increase with the decrease of ratio ; and when the structure force is smaller the extreme value, the improvement of the inner force at the bottom of pier is distinct adopting elastic consolidation and bending of at the top of pier and beam will has a great increase

    對于墩底採用彈性固接時,結構內力在梁、墩剛度比不低於前述固接墩出現極值點時剛度比的情況下,將出現內力值隨剛度比的增加而減小;而在梁、墩剛度比小於極值點剛度比時採用彈性固接對墩底彎矩改善較大較為明顯,對墩頂及主梁的彎矩將會有較大幅度的增加。
分享友人