side bearing 中文意思是什麼

side bearing 解釋
側軸承
  • side : n 1 (左右上下等的)邊,側面;(事物內外等的)面,方面;(人、物等的)旁,旁邊。2 〈數〉(三角形...
  • bearing : n 1 忍耐,忍受。2 態度,舉止,風采,姿態。3 關系,影響,方面,聯系 (on; upon); 意義。4 〈常 pl ...
  1. Pedestal plain bearings ; side flange bearing

    普通關節軸承.普通托架軸承.側面法蘭軸承
  2. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  3. Compared with the mud on wall form hole technology, clash stake technology or vibration sink pipe technology used in complex foundation stake forming, it has advantages of no vibration, no pollution, and no noise. in addition, since the concrete pressed into the drill stem sent vibration free concrete to the pump, so it is eas y to ensure the quality of the stake body. compared with the mud on wall and dry work form hole technology, the side obstruction and end obstruction of screw drill press concrete stake have all been accordingly improved, the weight bearing is better, and the transmutation of the complex foundation is less

    其中,螺旋鉆孔壓灌混凝土成樁技術自研製以來,已在多項復合地基工程中進行了應用,較好地解決了軟弱地層成孔困難的問題,適應地質條件范圍廣,成樁速度較快,工期短、工效高;與復合地基成樁時的泥漿護壁成孔工藝、振沖樁工藝或振動沉管工藝施工比較,具有無振動、無污染、無噪音的優點;另外,壓入鉆桿內的混凝土為泵送免振混凝土,因此樁體質量易於保證;與泥漿護壁和干作業成孔工藝相比,螺旋鉆孔壓灌混凝土成樁的側阻和端阻都有相應的提高,樁的承載性能較好,復合地基的變形較小。
  4. Body side bearing beam

    上旁承梁
  5. Commutator side bearing

    整流子側支座
  6. Photography - roll films, 126, 110 and 135 - size films - identification of the image - bearing side iso 897 : 2000

    攝影. 126 110和135規格膠卷.成相面的識別
  7. The same type of cement - soil mixing pile with concrete core, concrete pile and cement - soil pile that means they have the same pile length and pile diameter is deeply analyzed by finite element program. we get the q - s curve, the axis force of pile body curve, the stress of pile curve and the side and the end sharing load ratio of the pile curve by finite element program. with the help of the finite element program, the paper finds the relations between the pile ' s parameter and its bearing capacity and load transferring properties

    利用有限元計算分析了同比(樁長相同、樁徑相同)水泥土組合樁、水泥土攪拌樁和混凝土鉆孔灌注樁,得到了它們的荷載沉降曲線、樁身應力曲線、樁身軸力曲線、樁側樁端分擔荷載曲線等,通過這些曲線對它們的荷載傳遞規律以及變形特性進行了深入的分析。
  8. In this paper, based on the static - load tests of tension piles in soft ground lying on the province of zhejiang such as zhongshan garden, gongchen bridge canal piazza, etc, the calculations of ascending displacement, developing mechanism of the side friction and utmost bearing capacity of the tension piles are studied

    本文以中山花園、拱宸橋運河廣場等浙江軟土地區抗拔樁靜載試驗為背景,對抗拔樁抗拔承載力計算、上拔量計算、抗拔樁側阻發展機理進行了分析研究。
  9. Analysis of the side bearing friction resistance moment on sw - 160 passenger car bogies

    160型客車轉向架旁承摩擦阻力矩分析
  10. Of contract of nonperformance of break a contact of working relationship one party, answer to pay penalty due to breach of contract and compensation to the other side, the standard of penalty due to breach of contract and compensation and pay way, according to bearing severally by working relationship both sides ability is in labor contract affirmatory ; causes nonperformance labor contract to perhaps give other one party to cause because of force majeure damage, can not assume the responsibility that violates labor contract

    勞動關系一方違約不履行合同的,應向對方支付違約金和賠償金,違約金和賠償金的標準和支付辦法,由勞動關系雙方根據各自的承受能力在勞動合同中確定;因不可抗力造成不履行勞動合同或者給另一方造成損害的,可不承擔違反勞動合同的責任。
  11. The experiments show that the bearing capacity of super - long and large - diameter bored piles is mainly contributed by side friction, especially by their upper and middle parts, even under the bearing limitation, the ratio of base resistance to the total load is very low because of the soil residue at the bottom of piles, so this type of piles is friction ones

    試驗表明:即使在極限荷載下,超長樁的豎向承載力仍主要由樁側摩阻力提供,且主要集中在樁的中上段,下段摩阻力很小,樁的端阻力由於樁底沉渣的影響也難以發揮出來,所以超長樁為典型的摩擦樁。
  12. Bearing off side

    軸承泄油麵
  13. Method to evaluate pile capacity precisely by using the coefficient of cleaning slime and coefficient of construction process and by controlling the total duration of construction is proposed herein after analyzing the influences of slime at pile bottom, thickness of mudcake by the side of pile, shape of hole wall, time of construction and construction process on the bearing capacity of large diameter cast - in - place pile

    本文通過分析樁底沉渣、樁側泥皮厚度、孔壁形狀、成樁時間及施工工藝等對大口徑灌注樁承載力的影響,提出了在樁承載力計算中引入清底系數及成樁工藝系數,並控製成樁總時間以較準確地評價單樁承載力的方法。
  14. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋的試驗樁工程,深入研究了江漢平原地區卵石地基深鉆孔灌注樁的施工工藝、單樁極限承載能力、樁側摩阻力和端阻力。
  15. So the methods of design and computing about limit condition of bearing capacity is still adopted in present criterion. under the precondition of meeting the demand of construction ' s using function, the main content that is researched in this article is how to make the scheme of mixed soil - cement piles composite ground on the safe side economical and reasonable, according to the rule of the design for deformation control the article, which is based on formers " theory and practice, combining with the example of engineering, utilizing the tool of matlab. 5. 0, using optimizing by plural modality method, makes a primary discussion on the design parameter of the scheme for mixed soil - cement piles composite ground, according to the rule of the design for settlement controlment method

    在現行規范中仍然採用的是承載力極限狀態設計計算方法。在滿足建築物使用功能要求的前提下,如何按照變形控制設計的原則,使得水泥土攪拌樁復合地基方案更加安全可靠、經濟合理,是本文研究的主要內容。本文在總結前人的理論和實踐成果的基礎上,結合工程實例,利用matlab . 5 . 0工具,採用復形調優法,按沉降控制設計原則,對水泥土攪拌樁復合地基方案設計參數的優化進行了初步的探討,得出了一些有益的結論,對工程實踐具有一定的指導意義。
  16. In the process of building and using the mass concrete structures, because of the effect of out - side condition and themselves, some faults will form in the structure, these faults will effect the bearing capability and endurance using nondestructive testing method to test the concrete ' s quality and diagnose its healthy, which has the significant sense in assessing the safety stability and research of the administering diseases this dissertation mostly researched the testing methods in the mass concrete structure, discussed the principles, methods, features, sphere of application of the ultrasonic testing in the mass concrete structure with faults, used dynamic fem to simulate the testing process, discussed when the concrete structure with cracks is under the effect of the pulse, how the elastic waves propagate and what are their changing feature, researched the principles of the first - arriving waves " phase when the cracks " depths are not same, obtained the relation between the inversion point and the cracks " depth, which has the direction sense in the application of projects, the second part of this dissertation is ct, which used the ultrasonic wave running through the tested - substance to get arriving - time of the ultrasonic wave, then inverse the image this dissertation drawed one ct program which can well present the different little cells " ultrasonic wave velocity profiles of the substance, thereby to diagnose the quality of the part of the tested - substance, ct has the better using foreground.

    在混凝土結構的施工及使用過程中,由於受其自身及外界各種因素的影響,常常會產生一些缺陷,對結構物的承載能力和耐久性造成嚴重影響,採用無損檢測技術進行質量檢測和健康診斷,這對混凝土結構開展安全、穩定性評估以及病害隱患治理研究具有重要意義。本論文主要針對大體積混凝土結構缺陷的檢測方法展開研究工作,重點討論了超聲波法檢測混凝土結構裂縫的基本原理和方法及其特點、適用范圍,運用動力有限元數值模擬其檢測過程,探討了有裂縫缺陷的混凝土結構在脈沖荷載作用下彈性波的傳播及其變化特徵,研究了不同裂縫深度下首波相位變化規律,得出了反轉臨界點與裂縫深度之間的關系,這對實際工程應用具有指導意義。聲波ct是一種新的無損檢測技術,它是利用聲波穿透被檢測體獲取聲波接收時間,來進行計算機反演成像的技術。
  17. The paper introduces a multiparameters static load test method. compared with a routine test, the bottom and the top settlements can be observed by this method and multiparameters are aquired. based on these parameters, we can get a generally analysis on the elastic - plastic compression of the pile, the side bearing and the bottom bearing as well as the properties of the soil under pile

    介紹了一種既觀測樁頂沉降又觀測樁端沉降的樁身壓縮量的實測方法,區別于常規的靜載荷試驗,該靜載荷試驗能夠提供多方面的參數,可以對樁身彈性壓縮量、側阻、端阻的發揮程度、樁端持力層性狀有一個比較全面的了解。
  18. Available in a wide variety of formats, from ultralines standard range, to the compact range and on to its range of optional side bearing carriages for heavier load movement

    我們有不同型號氣缸可供客戶選擇,從標準型系列到緊湊型系列,以及可以選擇不同要求的滑動軸承安裝在氣缸上用來增加氣缸的承載負載的能力。
  19. People just have to insert their smart identity cards with the side bearing the arrow and chip into the card reader. the system will take a while to perform mutual authentication with the smart identity card key

    E -道操作簡單,市民只須在e -道前將智能身份證有箭咀及晶片一方插入閱讀器,稍等一會,以便系統與身份證的密匙互相認證。
  20. To enter the e - channel is simple. people just have to insert their smart identity cards with the side bearing the arrow and chip into the card reader. the system will take a while to perform mutual authentication with the smart identity card key

    E -道操作簡單,市民只須在e -道前將智能身份證有箭頭及晶片一方插入閱讀器,稍等一會,以便系統與身份證的密匙互相認證。
分享友人