side construction 中文意思是什麼

side construction 解釋
順砌構造
  • side : n 1 (左右上下等的)邊,側面;(事物內外等的)面,方面;(人、物等的)旁,旁邊。2 〈數〉(三角形...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The company has the professional qualifications of the construction, rich experience and expertise in project construction team, in shenzhen and neighboring had completed a number of major projects, such as : state - building in shenzhen, the shenzhen productivity technology park building, dongguan step by step, the china everbright bank, shenzhen city communist party, china enrolling, urban forests, turtle mountain lodge, alpine garden, quieting habitat ho side, garden city, wonderlang, the bay holds garden, studded day at ocean shores, etc. glass insulation, energy, explosion - proof security to indulge their works

    本公司具有專業的施工資歷、豐富的工程經驗及專業的施工隊伍,在深圳及周邊曾完成多項大型工程,如:深圳國通大廈、深圳科技園生產力大廈、東莞步步高、光大銀行大廈、深圳市委黨校、中國移動營業廳、城市山林、龜山別墅、高山花園、豪方悠然居、花園城、四季花城、灣畔花園、漾日灣畔等等玻璃隔熱、節能、安全防爆貼膜工程。
  2. Patton, rommel ' s old rivalry, was sent to dover on the other side of the strait to command a fictional american army group and make large scale construction prepared for allied landing operations

    隆美爾的老對手? ?美軍名將巴頓,被派到了多佛爾地區,指揮一個並不存在的美國集團軍,並且為登陸作戰構築大規模土木工程。
  3. Where the building lot for a building and connected facilities in a hot spring area is subject to a restriction requiring the installation of a pedestrian footpath to be set back from the building line or the side of a roadway within the building lot, the city / county ( municipal ) government with due jurisdiction shall consider the particular situation of the hot spring area in setting the principles for review of the setback distance or exemption from setback in accordance with article 263, paragraph 2 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受應自建築線或基地內通路邊退縮設置人行步道之限制者,直轄市、縣(市)政府應考量溫泉區特殊情形,依建築技術規則建築設計施工編第二百六十三條第二項規定,就退縮距離或免予退縮,訂定認定原則審查。
  4. ( 4 ) the instability problem of the columniation supporting was solved in the construction of side - span. ( 5 ) the circle - steel nip - patch anchor was applied for the thread - snap of the prestressed crude steel wire, the double facility anchor was used for deeling with the slip - wire of steel wring

    ( 4 )在邊跨直線段施工中,採用一端設立柱另一端吊掛在已合攏梁段上的梁式膺架,解決了支柱支承在古錯落體上的不穩定問題。
  5. The chinese kongzhu differs from the diabolo in three primary ways : ( 1 ) the axle of the chinese kongzhu is much longer than that of the diabolo. ( 2 ) the chinese kongzhu has flat side ( s ) like wheel ( s ) whereas the diabolo consists of two bell - shapes. ( 3 ) the chinese kongzhu has air grooves built into their construction

    中國的空竹不同於迪亞波羅,主要有以下三點:首先,空竹的軸要比迪亞波羅的長得多,其次,空竹的兩端或一端是輪狀的圓盒,而迪亞波羅一般為碗狀的兩端。
  6. We present some classical theories about interprocedural analysis and optimization, including call multigraph construction, inline substitution and procedure cloning, and interprocedural information ( side - effect summary sets, alias information and interprocedural constant )

    然後,我們對過程間分析和優化的一些經典的理論,包括調用圖的構造,內聯替換和過程克隆,過程間信息(副作用摘要集合,別名和過程間常量)作了介紹。
  7. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對巖溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔灌注樁樁端下的巖體強度和結構穩定性方面進行模擬計算和定量研究。
  8. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋拱頂面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理工大學工程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋拱基本滿足要求,個別排架橫梁不滿足要求,肋拱連系梁普遍不滿足要求;計入水平橫槽向地震作用的工況為設計控制工況。
  9. Construction of a single - lane road bridge of 70 m in length across the san tin eastern main drainage channel stemdc connecting an existing unnamed road along the eastern side of stemdc near the vha and tyr

    興建長70米並橫跨新田東面主要排水道的單線行車道路橋,以連接沿該主要排水道東面近車輛輪候區的現有未命名道路與淳裕路
  10. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  11. On the western side, belcher bay reclamation and the construction of belcher bay link on it were completed in february 1997 to tie in with the opening of the western harbour crossing

    在港島西面,卑路乍灣填海工程及在該填海區興建的卑路乍灣連接路,已在一九九七年二月竣工,配合西區海底隧道的啟用。
  12. Article 31 when construction projects of a permanent nature are being erected on either side of a highway, the distance from the edge of the building facing the highway to the outer rim of the roadside ditch of the highway should be no less than 20m for state highways, 15m for provincial highways, 10m for county roads, and 5m for township roads

    第三十一條在公路兩側修建永久性工程設施,其建築物邊緣與公路邊溝外緣的間距為;國道不少於二十米,省道不少於十五米,縣道不少於十米,鄉道不少於五米。
  13. The crackings occurred on the retaining wall and side piers of a flood gate during construction and the causations are investigated, inspected and analyzed, and then the relevant control measures are put forward based on the endangering degree from the cracks on the structure ; by which the normal operation function of the gate is guaranteed

    摘要針對某水閘工程在施工過程中擋墻及邊墩產生的裂縫,進行了裂縫特徵的調查、檢測和引發裂縫原因的分析,並根據裂縫對建築物的危害程度,提出了相應的控制措施,較好地保證水閘正常運行的功能。
  14. On the field construction of storage tank, the hoisting structure of electric block, by means of mechanics analysis and computation, can determine the amount which the electric block requires, the size of its side column and central column and its connecting forms, thus eventually reasonably allocating construction tools and decreasing the consumption of assistant materials only when the construction security is guaranteed

    摘要儲罐現場施工中,電動葫蘆提升結構可通過力學分析、計算,確定所需電動葫蘆的數目、提升組合結構中邊柱和中心柱的規格尺寸及其連接形式,達到在保障施工安全的前提下合理配置施工機具、減少輔助材料消耗的目的。
  15. By enhancing side a supervision in oil and gas field surface construction, the quality consciousness of the whole staff is raised, the construction market is standardized and the project management means is perfected so as to effectively promote engineering quality of oil and gas field surface construction

    通過加強油氣田地面工程建設甲方監督工作,增強了全員質量意識,規范了建設市場,完善了項目管理手段,促進了油氣田地面建設工程質量的提高。
  16. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變試驗,分析了沙漠井場浸法施工中就基坑壁的破壞方式,推導出了基坑和樁孔容許開挖深度的計算公式。
  17. German side on this item, always upping the ante, to the extent that china is also considering whether to adopt domestic maglev technology, shanghai - hangzhou expressway construction or use of wheel - track technology

    德方在此項目上不斷加碼,以至於中國也考慮是否採用國產的磁懸浮技術,或者在滬杭高速路建設上採用輪軌技術。
  18. At about 5 yesterday morning, in guozijian street, dongcheng district, a beam was broken off an archway on the west side of the imperial college by a construction excavator trying to drive past

    昨日凌晨5時許,東城區國子監街,國子監西側一牌樓被試圖駛過的施工挖土車撞斷橫梁。
  19. By house construction construction in side station overseeing important

    論房屋建築施工中旁站監理的重要性
  20. For example, on a particular project, comprehensive insurance for the working side construction may suffer loss of protection

    例如,對某一工程項目,綜合保險為各工作方提供施工中可能遭受損失的保障。
分享友人