simple dam 中文意思是什麼

simple dam 解釋
谷坊工
  • simple : adj ( pler; plest)1 單純的;簡單的,簡易的;輕便的。2 質仆的,自然的,天真的;樸素的;率直的,...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. Give an example, for a built arch dam, the paper worked out calculational programme based on the calculational model and calculate the reliability index of abutment with simple and double quadrature method

    對於一已建成的拱壩,利用這一計算模型,採用改進一次二階矩法,編制電算程序,計算該拱壩壩肩巖體的可靠指標。
  2. The jet - grouting has little change to dam structure. its construction is simple and lower cost, it has evident advantage to form dam foundation diaphragm - wall

    高噴灌漿技術對壩體的原結構影響較小,施工較簡單,工程造價相對較低,對病險壩防滲加固具有較明顯的優越性。
  3. According to the law of mass action, the law of mass conservation and the principles of chemical thermodynamics, mathematics model about components " modes of occurrence ( that is simple ions, complex anions and complex compounds ) and their concentration in dam foundation solution has been set up with balance constant method

    本文根據質量作用定律、質量守恆定律和化學熱力學的基本原理,應用平衡常數法建立了地下水水質組份存在形式(即單一離子、絡陰離子和絡合物)及其濃度分佈的數學模型。
  4. It gives some suggestions that should be noticed during the operation management if the rubber dam. it also introduces some simple dam bag repairing technologies. this article is also of some reference value for scientifically running the rubber dam and expanding its life span

    本文還對在通航水域設計建造橡膠壩的安全防護設施進行了探討;對橡膠壩在運行管理中應注意的事項提出了建議,並介紹了簡單實用的壩袋搶修技術,對指導橡膠壩科學運行管理,提高橡膠壩的使用壽命具有借鑒作用。
  5. It is abstracted whole factor information from the corresponding rectangular matrix which is made from many - point data in all dam. with analyzed the interrelation of survey data, it is abstracted the same essentiality variables and is made decentralize complex survey data be simple and whole. therefor, it is revealed the interrelation each other and is analyzed dam survey data, and is served for dam safety monitoring and comprehensive evaluation

    從全壩多測點的測值所形成的相應矩陣中提取整體因素信息,分析各觀測變量之間的相互關系,歸納出測量本質相同的變量,使分散復雜的觀測數據成果簡潔化、整體化,從而揭示出事物間的本質聯系,進行大壩觀測資料的整體分析,為大壩的安全監測和綜合評價服務。
  6. The design of the downstream water supply during the construction of yunlong reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking - up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit

    摘要著重介紹雲龍水庫施工期下游供水設計,根據工程特點,較好地解決泄洪導流隧洞施工期、大壩施工期、水庫蓄水、導流隧洞封堵施工期等下游供水問題,施工方法簡單,確保了下游供水,取得了較好的社會和經濟效益。
  7. For rubber dam project is of simple structure and easy to operate, while having low requirement for the plate of the foundation, thus the key to rubber dam technology is the dam bag ' s anti - pull intensity, circum - oriented relative extending rate, internal pressure ratio, anchor structure as well as operation procedure

    由於橡膠壩工程結構簡單、施工方便,對基礎底板的要求不高,因此橡膠壩技術的關鍵在於壩袋的抗拉強度、環向相對伸長率、內壓比、錨固結構型式,以及施工工藝等。
  8. Some problems and difficulties urgently to be solved in seismic research of high concrete arch dams were reviewed, including to find simple and practical methods for comprehensive analysis of dam foundation, dam body, and reservoir water, to work out rational safety evaluation criteria for high arch dams, to study the dynamic behavior of the strength of concrete materials, to develop the seismic input model of the dam - site river valley, and to explore aseismatic measures

    摘要綜述能對壩基、壩身與庫水綜合分析的簡單實用方法,合理的高拱壩抗震安全評價準則,混凝土材料強度的動力特性,壩址河谷地震動的輸入模型,抗震工程措施等高拱壩抗震研究中亟待解決的問題和難點。
  9. In this paper, with complete calculation micro - mechanics method, mass concrete was taken as three - phase composites, which consists of mortar matrix, aggregate and bond between matrix and aggregate. with nonlinear finite element method, the simulation of static and dynamic mechanics performance of the uniaxial compress concrete specimen of dongjiang arch dam and simple supported beam specimen of xiao wan arch dam was studied by means of the software of msc. marc. the number of all kinds of mortar matrix was calculated according to grading of aggregate of three graded concrete and walraven function

    本文採用完全細觀計算力學方法,將大體積混凝土在細觀層次上看成是由粗骨料顆粒、硬化水泥砂漿及其二者之間的粘結界面組成的非均質復合材料,採用非線性有限元方法,在對大型商業有限元軟體? msc . marc二次開發的基礎上,對東江拱壩的三級配混凝土軸壓試件、建設中的小灣拱壩三級配混凝土梁試件在靜、動荷載下的力學性能和破壞過程進行了數值模擬。
  10. Rock - fill dam is the one chief type of soil - rock dam, there are much virtue of safety function, adaptability used the local material, be benefit to mechanical building, be short in building time and low in cost, being simple in the building during closure and diversion, etc. it suit the condition of our nation and the environment where the water conservancy works and hydroelectric power plant located, we accumulate the ample practical experience and a series of achievement in scientific research and become a model of having ample competition in the construction and development of piled rock clam

    堆石壩是土石壩的主要壩型之一,它具有適應性強,就地取材,便於機械化施工,工期短,造價較低等優點,在水利樞紐設計中被廣泛應用,而且已經積累了豐富的實踐經驗和成套的科研試驗成果,在水利樞紐的壩型選擇中具有很強的競爭力。就堆石壩而言,根據築壩方式和築壩材料的不同,也有多種壩型。
分享友人