slab construction 中文意思是什麼

slab construction 解釋
平板結構
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. Comparing with the same category overseas jointless bridges, the new type bridge has more reasonable structure, more simple and convenient construction, and better use effect etc. the main work in this paper is described as follows : ( 1 ) this paper introduces phylogeny and reseach survey of the joints bridge inland and abroad, and a new jointless bridge structure ? new type semi - integral abutment bridge is based on these, which characteristic of own structure and setting of primary component are expatiated. ( 2 ) this paper analyses influence of temperature effect, creep, shrinkage and circumambient soil of run - on slab on the new type structure, and analyses the forcing performance of beam, abutment and run - on slab of the new type semi - integral abutment bridge, and constrast to the same category joints bridges

    本文主要做了以下工作: ( 1 )介紹了無縫橋梁在國內外的發展歷史、研究概況,並在此基礎上提出了一種新的無縫橋梁結構形式-新型半整體式無縫橋梁,闡述了它特有的結構形式以及主要構件的設置; ( 2 )分析了溫度效應、徐變和收縮以及搭板周圍土體對這種新型結構的影響,對新型半整體式無縫橋主梁、橋臺以及搭板進行了受力性能分析,並和同類無縫橋梁進行了對比分析。
  2. The monitoring of cracks of floor slab at construction stage

    現澆混凝土樓板裂縫的施工階段試驗研究
  3. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、基巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導配筋。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  6. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期蓄水的水布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  7. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公路近水邊圍的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士站及相關的道路排水系統和環境美化工程。
  8. Used for construction, such as drilling salls, pipe installation, processing hole of air - conditioned and pc hole of stone slab

    主要用於建築工程,如墻體,樓板中的空調孔,進排水管孔,排氣孔等。
  9. Finally, the paper tests the effect of the flexible approach slab used in the real project and sums up the techniques and requirements of construction

    最後,結合實際工程進行了分析驗證,同時對楔型柔性搭板的施工過程和要求進行了總結。
  10. Horizontal construction joint shall be set at the top of the slab

    5施工縫留設:水平施工縫留置於板頂面。
  11. Construction technique for cast - in - situ continuous hollow - slab beam

    現澆連續空心板梁施工技術
  12. Control of early crack on beam - and - slab construction with ready mixed concrete

    商品混凝土梁板結構施工早期裂紋控制初探
  13. In order to resolve the problem from waterproof for underground storage cavern, a comprehensive control measure composed mainly of water drainage with water cutoff and block up as the supplement is followed in the construction, in which the countermeasures such as drain - guiding with piping network, water proof with impervious slab, self - waterproof of concrete structures, jointing waterproof and painting waterproof etc. are adopted, and then a better effect is got in the engineering practice concerned

    摘要為解決好地下洞庫的防水問題,施工中遵循「以排為主,截、堵、排相結合的綜合治理措施」 ,採用了管網引排、防水板防水、混凝土結構自防水、接縫防水、塗料防水等防水作法,經工程實踐取得了良好效果。
  14. Taking produce high - quality products and make higher inner management as its guidelines, the company has invested a massive amount of funds in recent years. presently, the project of steckel mill of cold - rolled silicon steel slab is under construction. it is expected to put into production by the end of 2006, through which tianjie group will form a complete set of production line of cold - rolled electrical steel

    近年來,公司以「產品質量要上檔次內部管理要上層次」的指導精神投入了大量資金,目前在建項目有冷軋硅鋼薄板坯爐卷軋機,預期2006年底正式投入生產,屆時天潔集團將形成一套完整的冷軋電工鋼生產流程線。
  15. Timber saved due to use of pre - castsemi pre - cast slab construction, aluminum and steel table formwork

    使用預制半預制樓板組件、鋁及鋼模板后節省的木材
  16. Published professional books about ultra - long concrete base slab construction in basement, large area terrazzo floor construction ; be competent for consultative work on building construction, construction technique, construction company management and construction supervision, etc

    本人在「地下室超長混凝土底板施工」 、 「大面積水磨石地坪施工」有專著;能勝任建築施工、施工技術、施工企業管理,建築監理方面咨詢工作。
  17. Beam and slab construction

    梁板建築
  18. Flat slab construction

    無梁板建築
  19. Timber had been saved due to the use of metal hoardings, precastsemi - prescast slab construction, aluminium formwork, steel table formwork and metal formwork for construction

    採用金屬圖板、預制及半預制組件、鋁質和鋼質的金屬模板和棚架,共減省了4 , 651平方米木材。
  20. So it has practical meaning to study the influence of different reinforced concrete face - slab construction schemes on the temperature field and thermal stress field of reinforced concrete face - slab

    溫度應力與施工過程有著密切的聯系,因此研究鋼筋混凝土面板不同施工方案對面板溫度場和溫度應力的影響具有實際意義。
分享友人