slab dam 中文意思是什麼

slab dam 解釋
平板壩
  • slab : n 1 平板,厚板;(圓木解成板時外面兩塊帶皮的)背板。2 (麵包等的)片,厚塊;鐵塊;土塊。3 混凝土...
  • dam : n 1 水閘,壩,堰。2 壩中的水。3 【礦物】坑道堰。4 (牙科用的)橡皮障。5 〈比喻〉障礙。vt 1 築水閘...
  1. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石力學試驗綜合評價水電站大壩趾板建基巖體工程質量是可行的,其成果可為大壩趾板建基巖體驗收提供依據。
  2. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水電站面板壩趾板建基巖體進行了動、靜參數測試,並根據所獲的參數建立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  4. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石壩填築施工設計
  5. Rock material site selection and quality evaluation for rockfill dam with concrete face slab in songjianghe hydropower station

    松江河水電站面板堆石壩石料場選擇和質量評價
  6. The computation results show that the deformation of the dam appears in evident increment and the creep has an obvious influence on the deformation and stress of the face slab

    結果表明,考慮堆石流變后的壩體沉降有明顯的增加,對面板的應力變形狀態有較大影響。
  7. Based on the design of hanpingzui rockfill dam with concrete facing slab, the stresses and deformations of the dam body and impervious system are calculated by using the elastoplastic plane finite element method

    摘要根據漢坪咀混凝土面板堆石壩的工程設計,用彈塑性平面有限元法,計算了堆石壩壩體、防滲體系的應力和變形。
  8. It is very important that the reasonable creep model is adopted to simulate the deformation of the rockfill dam and the reasonable construction processes are also adoped to decrease the deformation and stress of the face slab

    因此,對于分期澆築面板、分期蓄水的水布埡高面板堆石壩,選用合適的流變模型正確模擬堆石體的變形特性,以便採用合適的施工程序減小面板應力變形具有重要意義。
  9. Experimental research on grouting soft rock foundation under toe slab of siping concrete faced rockfill dam

    寺坪面板堆石壩趾板軟巖基礎灌漿試驗研究
  10. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  11. Combined with a concrete face rock - fill dam in process, the simulation analysis on the face slab ' s temperature field and temperature stress is processed in connection with the condition of temperature sudden drop caused by daytime temperature differences and cold wave and so on during the construction period

    摘要結合某在建的混凝土面板堆石壩,針對施工期日溫差及發生寒潮等氣溫驟降情況,進行了氣溫驟降條件下面板溫度場及溫度應力的全過程模擬分析。
  12. According to new idea on toe slab shape design suggested by kuke and in combination with the toe slab shape design of shuibuya concrete face rockfill dam, the " y " line positioning, the shape parameter determination of standard profile, the coordinate calculation related to toe slab shape are presented in this paper

    摘要根據庫克建議的趾板體型設計新思想,結合水布埡面板堆石壩趾板結構的具體設計,對趾板體型設計相關的" y "線的定位、標準剖面體型參數的確定、趾板坐標的計算等進行了闡述。
  13. By adopting the three - dimensional nonlinear finite element program, using drucker e - b model, demonstrating the actual construction progress and water impounding of gongboxia hpp main dam, comparing the two schemes of the existence and nonexistence of extruded concrete curb, made three - dimension simulation calculation, the result proved that while the existence of extruded concrete curb between face slab and rockfill, the deformation and stress of face slab are better than that while the nonexistence of extruded concrete curb

    採用三維非線性有限元計算程序,使用鄧肯e b模型,模擬公伯峽面板壩的實際施工進度、蓄水過程,對比有無擠壓邊墻兩種方案,進行三維模擬計算。結果表明,面板與堆石體之間有擠壓邊墻時,其面板的變形及應力值均小於無擠壓邊墻的相應結果。
  14. The reinforced concrete face - slab is adopted as impervious body by long tan rcc dam

    龍灘碾壓混凝土重力壩採用鋼筋混凝土面板作為防滲體。
  15. Therefore the impervious face - slab set on upstream face of dam is a key to seepage control of rcc dams. and the value of impervious face - slab is showed by the impervious effect

    因此在碾壓混凝土壩上游設置防滲面板是控制碾壓混凝土壩滲漏的一個關鍵環節,而防滲效果則是防滲面板的價值所在。
  16. The result indicates that under the condition of temperature sudden drop, the temperature of face slab ' s surface and centre will fall consecutively along with the temperature sudden drop, and the face slab ' s surface temperature drop - cut range will reach maximum ; under this condition, the tensile stress appears in the face slab ' s surface and centre, the maximum principal stress in the face slab ' s surface is larger titan that in the face slab ' s center ; the maximum principal stress in the face slab ' s surface and centre both occurs in the position that the elevation equals approximately to half of the dam ' s height

    結果表明,在氣溫驟降條件下,面板表面及中心的溫度將隨氣溫驟降的發生而持續降低,其中面板表面溫度降幅最大;此時面板表面和中心均出現拉應力,面板表面的最大主應力大於面板中心的最大主應力;面板表面和中心的最大主應力均發生在高程約為壩高一半的位置。
  17. Testing study on mechanical properties of slab rockfill dam materials

    面板堆石壩壩料力學性質試驗研究
分享友人