slide area 中文意思是什麼

slide area 解釋
容易產生山體滑坡的地區。

  • slide : vi (slid; slid 〈美國〉 slidden;sliding)1 滑;(在雪或冰上)滑動;滑倒,滑掉。2 改變位置,脫離...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. Baby of welfare in the center department allocate the spacious and bright aseptic nursery, clinic, observe the isolation ward, therapeutic room, mix the milk room ( allocate the sterilizer ), store the thing room, sew and wash the room ( dispose and do washing, dryer ) indoor activity room, recover, train room, open classroom, outdoor playground intelligently ( furnished with slide, hobbyhorse, sand ground wait for facility ) till the area of function

    福利中心嬰兒部配備寬敞明亮的無菌嬰兒室、醫務室、觀察隔離室、治療室、配奶室(配備消毒櫃) 、儲物室、縫洗房(配置洗衣、乾衣機)室內活動室、康復訓練室、啟智教室、室外活動場所(配有滑梯、木馬、沙地等設施)等到功能區域。
  2. It was shown that the physical property, electric resistivily and microstructure of soil in the slide area were different from those in the slope, and could be used to determine the slip zone, while the mineral ingredient and chemical composition could not be used generally to identify the slip zone

    研究結果顯示:黃土滑坡滑帶土的主要物理性質指標、電阻率特性、細觀結構特徵、微觀結構特徵與滑坡體及滑床有顯著差異,在實踐中可作為鑒別滑動面的標志;而滑帶土的礦物、化學成分沒有明顯的差異變化。
  3. The content of this thesis, through the deformation destruction process of th e typical nanlidu landslide along the national highway 318, uses the finite unit a nalysis of computation, revealing the elastic, plastic stress and displacement of each joint inside the slide area pointing out the distribution range of the tension stress and the plastic deformation range, computering the stability safety factor of the slide area, gaining the fixed quantity, quota that evaluates the stability of the slide area, revealing the position of the slide area which is most likely to los e its stability, thus, it can provide theoretic proof for the programs which renova te landslides

    本文的研究內容是通過318國道南里渡典型滑坡的變形破壞過程,採用有限元計算分析,揭示滑體內部每個節點上的彈、塑性應力及位移,找出拉應力分佈區和塑性變形區,計算滑體穩定安全系數,得出衡量滑體穩定的定量指標,揭示滑體最可能失穩的部位,從而為滑坡整治方案提供理論依據。
  4. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽庫區特殊的地質環境與工程實際情況,在充分考慮水對庫岸滑體穩定性影響的前提下,提出了一個適用於長江三峽庫岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,水的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下水位升高降低了滑坡體的有效應力,另一方面是由於地下水的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽庫區的特殊條件,系統分析了作用於三峽庫區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在庫區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽庫區的滑坡穩定性分析是實用可行的。
  5. Gully erosion, which is universal on original lands, but also the special forms, for example, hole erosion gravel erosion debris slide and debris flow, which is unusual in loess area, ( 2 ) based on a long - term fixed point experiments in proving ground of the south stackpile, the soil erosion factors have been researched quantitatively, the runoff and erosion affected factors have been made sure and the experiential models of producing water and soil have been taken in newly - constructed stage, early stage and later stage of reclamation

    確定南排土場原地貌的水蝕模數為3700 4400t km ~ 2 ? a ;在排土場新造地貌上,擊濺、面蝕、細溝侵蝕、淺溝侵蝕、沉陷侵蝕、砂礫化面蝕、土砂瀉溜和坡面泥石流等水土流失形式出現頻率和發生程度都明顯強于原地貌。 ( 2 )以南排土場徑流試驗場長期的定位觀測為基礎,對排土場未復墾時期、復墾初期、復墾後期的土壤水蝕影響因子進行定量研究,確定了徑流和土壤水蝕的主要影響因子及其臨界值,建立了產流產沙的經驗模型。
  6. Four contact state depending on rate of rolling / sliding between the couple of contact element were studied based on hertz contact model, and the results was shown that the rate of slide would affect the distribution of pressure in contact area and stress in the half plane

    研究表明安定狀態隨載荷的大小而變化,其殘余應力和應變累積的大小與外加載荷成正比,並對計算中的一些問題進行了分析探討。
  7. It supposed that the circle of sliding surface run through the foot of slide. the factor of safety is transmitted to the function of x coordinate of the intersection point of the tangent at the scrap of the circle and x axis. so, the two - dimension area of searching is changed to one - dimension

    該方法先固定潛在滑動圓弧的上、下邊界點,利用滑弧后緣處的切線與x坐標軸交點的位置確定了滑弧的曲率,將二維搜索麵域簡化為一維搜索線域,搜索的上、下限有嚴格的界定,不存在漏點問題。
  8. The dislocation interfaces of early stage were controlled by the slide of the ne fold. the dominant dislocation interfaces, in the dam area, is the one of the second stage, which resulted from the slide of the lava layer and lagerkluftes from nw to se because of the affect of the majiaheba faultage ' s thrusting overriding to the dam area from nw to se. the dislocation interfaces of the third stage were the result of the overprint of the structure of ne to the one of nw

    早期階段形成的錯動帶受控于北東向縱彎褶皺的層間彎滑機制;第二階段形成的錯動帶在壩區佔主導地位,它們是由於北東向馬家河壩斷層由北西向南東的滑脫逆沖推覆影響壩區,並造成壩區向南東緩傾的巖層沿原生構造面向南東滑動的結果;第三階段形成的錯動帶則是由於北西向構造疊加於早期北東向構造之上而致。
  9. There are a number of small hot spring ponds with signs indicating particular treatment functions. there is also a water slide and kid ' s area

    同時也有很多小的溫泉區並有特殊用途。也有滑水區和兒童區。
  10. Slide projectors and slides ; overhead projectors ; aperture area, location pins, projection screens, evaluation

    幻燈放映機和幻燈片.字幕片放映機.第7部分:孔徑區
  11. Based on prevention and treatment engineering of the daheba in the yangtse river three gorges reservoir area, systemic prevention and treatment engineering of land slide, which include its genesis, stability analyze, prevention and cure measure scheme, and project monitor, have been researched in this dissertation

    本文以具有較為典型性的長江三峽庫區重慶市萬州區大河壩滑體治理工程為背景,對滑坡治理整個系統工程進行分析研究。對該滑體的形成原因及其治理工程進行研究具有重要的工程實踐意義和巨大的社會經濟效益。
  12. Implementation technology of controlled blasting for final slide - slope engineering in tianwan nuclear power plant area

    田灣核電站廠區最終邊坡工程式控制制爆破施工技術
  13. The objective function is the cost of anti - slide pile " s per meter ; the constraint conditions are the strength of anti - slide pile " s normal section and inclined section, the ratio of reinforcing design and the size of section in the design code ; the design variables are the height of section, the area of reinforcement and the amount of hoop. and the optimization model is solved by 0. 618 method

    本文提出的優化設計方法,以樁單位長度的總造價為目標函數,以規范對單筋梁的正、斜截面強度,配筋率及截面尺寸等要求為約束條件,以樁截面高度,抗彎縱筋面積,抗剪箍筋數量等為設計變量,來建立優化模型,並用0 . 618法進行求解。
分享友人