slope distance 中文意思是什麼

slope distance 解釋
斜距
  • slope : n 1 傾斜,坡度;坡,斜坡,斜面;【印刷】斜體。2 【軍事】掮槍的姿勢。3 【數學】斜率。4 【礦物】斜...
  • distance : n 1 距離,路程。2 遠隔,遠離;遠處,遠方。3 (時間的)間隔,長遠,長久。4 懸殊。5 隔閡,疏遠。6 ...
  1. The cherishing and training of some trees ; the cautious pruning of others ; the nice distribution of flowers and plants of tender and graceful foliage ; the introduction of a green slope of velvet turf ; the partial opening to a peep of blue distance, or silver gleam of water ; ? all these are managed with a delicate tact, a pervading yet quiet assiduity, like the magic touchings with which a painter finishes up a favorite picture

    欹斜之樹須正,修枝去葉,刪繁就簡,所得可謂奉若至寶;枝葉婆娑,花葉相映,令人賞心悅目;坡草青青,宛若天鵝絨地毯,光滑細膩;茂林之中偶露一隙,遠處藍天隱約可見,或現一池春水,碧波蕩漾? ?凡此種種,皆為人工造化,潤物無聲,猶如畫師當其畫稿殺青之際得一神來之筆,渾然天成。
  2. The forecast of moving distance of avalanche soils - the ratio of the heights of collapsed part and run - out of avalanche soils is related to slope shapes, avalanche sources, streamwise soil conditions, runoff on foreside, and soil moisture

    主要內容如下: ?崩塌土運動距離的預測?崩塌土流高比與斜坡形狀、崩塌源土質及沿程土質條件、坡前徑流及土層含水狀態等有關,並提出了崩塌土流高比公式。
  3. The author successfully simulated the rapid sliding of avalanche soils on mild slope with saturated soils in flume experiments, and the longest distance that avalanche masses can move was studied

    通過水槽實驗,對崩塌土所能到達的最遠距離進行了研究,成功地模擬了崩塌塊體在飽和度較高的緩坡上快速滑行的現象。
  4. In this paper, a numerical simulation is conducted, which is based on the test data of the model experiment of sloping ground with the help of the marc program. when the bearing capacity characters of level ground and the foundations adjacent to or above slopes are analyzed, the effect is considered, which includes deformation moduli, density, poisson ratio, angle of internal friction, stress - strain relationship, slope angle, relative distance from the edge of slopes and relative depth of footings

    本文利用斜坡地基模型試驗的試驗數據,用marc軟體進行了斜坡地基模型試驗的數值模擬,分析了平地地基、臨坡地基和斜坡地基的承載力特性,研究了變形模量、容重、泊松比、內摩擦角、應力應變特性、斜坡坡度、基礎的相對坡頂距及其相對埋深等因素對斜坡地基承載力性能的影響。
  5. Slope pipes are used in the actual production widely, especially in the long - distance pipeline transportation, so it has the practical value to study their hydraulic gradient

    可實際生產中傾斜管道是廣泛存在的,特別是在長距離管道輸送中,故研究其水力坡度是有現實意義的。
  6. The siphon drainage effect of hank slope will improve if the distance between bailing wells, or controlling drainage area, is smaller

    港口岸坡虹吸排水系統中汲水井的間距越小或控制排水面積越小,則越能提高岸坡的虹吸排水效果。
  7. Sfc marvin p. martin - facing 1st platoon, the slope was almost a forest, but directly in front of our pits, the rise was bare for a short distance

    馬文p .馬丁上士? ? 1排面對的山坡幾乎完全被森林所覆蓋,但在我們所在散兵坑的正前方高地有一段距離是無遮蔽的。
  8. Through the excel program, and combining the inside and outside environment of the excavation and stress field and displace field, the data of stress and displacement of points are analyzed in variable depth and load grade and terminal state. the spss software has been applied to the statistics of geometry parameter of failure surface, and the failure surface criterion is created by the linearity regression from d ( the longest horizontal distance between the failure surface and the side face of the slope ), ho ( the depth

    此外,應用spss軟體對試驗破壞滑弧的幾何參數進行統計分析,並對滑弧的最大水平深入距離d及d處至坑底的高度h _ 0結合各水理指標進行多元線性回歸,建立滑面的判據,並對此判據進行修正,且用實際工程對其進行評價,通過反算已知滑面的c 、值,表明邊界條件對破壞形式有極大的干擾作用,所直接看到的破壞類型土體不是發生整體滑移破壞,而是剝落式的潰屈破壞。
  9. The necessary conditions of forestland to be feasible for thinning are : the slope of forestland less than 25 %, the distance from logging road less than 600 meters, and keeping good stocking level after thinning 400 trees per hectare

    林地坡度小於25 % ,距離林道600公尺以內,且每公頃疏伐400株后仍保有適當蓄積之人工林,實施疏伐作業應屬可行。
  10. Based on the engineering practice of the side slope excavation of dayanchi section within the road for the construction traffic of guandi hydropower station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole - making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed ; for which the specific solutions are put forward herein as well

    摘要通過官地水電站對外交通公路大鹽池合同段邊坡開挖中預裂爆破的工程實踐,對預裂爆破的孔距選擇及下部嚴重出現巖坎、預裂面平整度、預裂爆破后輔助孔成孔率低、預裂與爆破區爆破網路以及預裂孔角度變化等問題進行分析,提出了具體的解決方法。
  11. The calculating formulas show that braking distance depends on initial braking speed, road dragging coefficient, mad slope grade, braking force increasing time ; and nothing to do with total mass of crane

    計算公式表明:決定汽車起重機制動距離的主要因素是制動初速度、路面阻力系數、道路坡度和制動力增加時間;汽車起重機總質量與制動距離無直接關系。
  12. Comparing the catchments with the same conditions at the same scales, we found that at the small scale catchments, the factor directly impacting the runoff variation and sediment variation was the relative distribution location at sloping fields, and at the median scale catchments, was the slope distribution of land use components, while at the large scale catchments, the distance distribution of land use components

    在相近條件的同尺度集水區之間比較發現,小尺度集水區土地利用類型的坡位分佈格局對徑流和泥沙變化有較直接的影響,中尺度集水區土地利用類型的坡度分佈格局和大尺度集水區的土地利用類型的距離分佈格局對徑流和泥沙土地利用空間分佈格局對侵蝕產沙過程的影響的變化影響較大。
  13. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊坡模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載力與筋類、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡頂的豎向位移特性,並分析其主要控制因素。
  14. It is found that : ( 1 ) for linear slope, redistribution of incoming energy flux in modenumber space depends on both the modenumber of incident waves and the ratio of the slope of incident wave ray to slope of topography ; both the transmitted and reflected energy flux ( only for supercritical linear slope ) focus near one or two modenumbers ; for supercritical linear slope, the energy flux scattering to higher modenumbers becomes larger and the energy flux to lower modenumbers becomes smaller as the slope of incident wave ray comes near to slope of topography ; ( 2 ) for convex slope, energy flux is redistributed in wide - range modenumbers and also show peaks on lower - modenubers and higher - modenumbers ; ( 3 ) for concave slope, energy flux is also redistributed in wide - range modenumbers, but does not show peaks on higher - modenumbers as supercritical linear slope and convex slope do ; ( 4 ) the total energy flux scattering to higher modenumbers is approximately equal to the total energy flux to lower modenumbers for internal waves propagating over both convex slope and concave slope, which means the concave slope is the same efficient to convex slope in scattering energy flux to higher modenumbers ; ( 5 ) for convex slope, the wave ray reflected from near - critical topography can extend to deep ocean and shallow shelf, while for concave slope, the wave ray reflected from near - critical topography can only extend to limited distance, then meet the topography and be reflected again ; generally the shear of the internal waves reflected twice from concave slope is not enhanced while the enhanced shear does also appear before second reflection takes place, the enhanced shear can bring about intense mixing, so internal waves reflected from concave slope can also produce marked mixing near critical slope

    3 、內波在凹地形上傳播時,能通量在模態上的分佈范圍也比較寬,但與凸地形和超臨界線性斜坡地形相比,能通量在高模態上的分佈沒有明顯的峰值。 4 、從總的能通量來講,內波在凸地形和凹地形上傳播時,向高模態散射的能通量與向低模態散射的能通若十地形下內波傳播及內潮生成問題的理論解量近似相等,這意味著二者在向高模態散射能通量方面具有同等效率。 5 、凸地形上臨界點附近的反射,反射波的波射線能夠延伸到深海和陸架,凹地形上臨界點附近的反射,反射波的波射線很快遇到地形發生二次反射,一般來講二次反射后回到深海的波動其速度剪切並不很強,但是在進行二次反射之前的區域,速度剪切仍然很強,因而內波在凹地形上的反射依然能夠在地形附近區域,產生強的速度剪切區,誘發混合。
  15. From the shore line, out a distance which may be anywhere from a few miles to a few hundred miles, runs the gentle slope of the continental shelf, geologically part of the continents

    從海岸線向大海延伸幾英里到幾百英里的區域是大陸架慢坡,從地質學上來說,它是大陸的一部分。
  16. This paper mainly studies the coupling error caused by induction voltage phase difference, and fluctuation of directional sensitivity caused by changes in near - field difference slope. the trend of system sum and difference phase difference, directional sensitivity and cross - coupling with change in distance is compared and discussed when the antenna is in the near - field and at a certain elevation

    本文著重研究了因近場感應電壓相位差引起的耦合誤差,以及近場天線差斜率變化引起的定向靈敏度的變化;討論了天線在近場並有一定仰角的條件下,隨著距離的變化,系統和、差相位差、定向靈敏度與交叉耦合的變化趨勢。
  17. We sample from parallel edges in equal distance, and we sample again from sample points set by slope and get fitting points set, then we use least square method to fit straight line with the fitting points set. the edges of paper currency image can be detected accurately and quickly by above method, and it is valid to some image with a certain defection

    邊緣檢測採用了對平行邊緣整體等間隔抽樣,根據斜率對抽樣點集進行再次抽樣后得到擬和點集,用最小二乘法根據擬和點集擬和直線的方法,可以快速精確的檢測到紙幣邊緣,並且能夠處理邊緣有一定程度殘缺的紙幣圖像。
  18. It analyzes the process of urgent braking of truck crane applying concept and principle of work - energy transformation, and gives calculating methods and formulas for the braking distance on three different roads including level and up / down slope roads and makes a list of calculating results for analysis

    摘要運用功能轉換概念和原理,分析了汽車起重機緊急制動過程,提出了汽車起重機在平路、上坡、下坡等3種情況下制動距離的計算方法和公式,並將計算結果列表分析。
分享友人