stabilization process paper 中文意思是什麼

stabilization process paper 解釋
穩定處理照相紙
  • stabilization : n. 穩定(作用),幣值的穩定;堅定,固定。 effect economic stabilization 實現經濟的穩定。n. -zator =stabilizer.
  • process : n 1 進行,經過;過程,歷程;作用。 2 處置,方法,步驟;加工處理,工藝程序,工序;製作法。3 【攝影...
  • paper : n 1 紙;裱墻紙。2 報紙,報。3 收據;債券;證券;票據;匯票;鈔票(=paper money)。4 〈pl 〉身份...
  1. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術工程分類及適應范圍進行了理論上的分析研究;然後結合工程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施工方案的研究和實施過程中,對于工程施工組織進行綜合闡述,並就人工挖孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施工方案提出有針對性的施工技術措施,人工挖孔樁施工採用鋼筋砼護壁確保挖孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施工工序;承臺梁施工採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施工技術採用土方分層對稱平衡開挖,分段挖土做筏基結構自穩等;最後對于該工程實施后的效果分析,說明該項綜合施工技術的可行性。
  2. Then, a thorough discussion and sum ? p about the main construction process of cfst tied ? rch bridge without wind bracing is presented in the paper in association with the construction practice of the bridge. in addition, the author put emphasis on the static calculation of two point integral hoisting construction method in single cfst arch rib. futhermore, the stabilization of arch rib in construction and service stage are analyzed detailedly

    本文結合該大橋的施工實踐,對無風撐鋼管混凝土系桿拱橋的主要工藝施工流程進行了全面論述和總結,並重點對單片鋼管拱肋兩點整體吊裝的結構受力進行了靜力計算及對拱肋在施工和運營階段的穩定進行了分析。
  3. The organic fraction of municipal solid waste ( ofmsw ) is composed of various substance and its limiting step of anaerobic digestion resulting in reducing biogas production and process stabilization, this paper reviews the pretreatment of organic solid waste for improving ofmsw characteristics eliminating anaerobic limiting - step

    摘要由於城市有機生活垃圾成分的復雜性和厭氧消化的限速步驟的影響,導致厭氧發酵的速度比較緩慢、產氣量較少和工藝不穩定等問題。
分享友人