standard design flood 中文意思是什麼

standard design flood 解釋
標準設計洪水
  • standard : n 1 標準,水準,規格,模範。2 旗;軍旗,隊旗;【徽章】標幟,標記;旗標,象徵。3 【植物;植物學】...
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  • flood : n 1 洪水,水災。2 溢流,漲水,潮水最高點,泛濫,洶涌。3 〈詩〉河,湖,海。4 充溢,豐富;大量,一...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. When catchment area, average channel gradient and catchment shape factor of designed culvert or bridge are known, a user can be convenient to get local parameters c, e and b from standard contour charts and easy to calculate flood flow just by a calculator. design period of flood flow is enormously shortened as well as a high precision. estimated flood flow through culvert or small bridge by new calculation model is generally less than by traditional methods, so that much cost is cut down a s reducing the span of culvert or small bridge

    以75000km ~ 2的川中丘陵地區為試點研究區,繪制了該地區新模型的參數等值線圖,率定了不同設計頻率的改正系數,使設計者只需在地形圖上獲取集水面積,河道平均坡降和流域形狀系數,在參數等值線圖上查得橋涵所在地的相應參數,使用計算器即可迅速計算出設計流量,大大縮短了設計周期,且精度較高,設計的洪水流量一般低於傳統方法,從而可減小橋涵跨徑,節省投資。
  3. Taking into account weather and flood forecast information ; the forecast operation manner is studied under the condition of without the change of the existing flood control standard to realize the conversion of flood control and benefits. ( 4 ) through analyzing runoff and water utilization information during reservoir operation, design flood, and the existin

    水庫汛陽水位動態控制方法研究及其風險分析根據水庫流域天氣預報、流域前期降雨、水庫蓄水、水庫泄水能力和防洪興利要求,利用水庫汛限水位變動范圍,結合洪水預報和短期降雨預報模型,研究水庫汛限水位動態控制方法。
  4. Finally, taking the panjiakou reservoir in the haihe river basin in china as an example, the paper analysis the reasonable adjustment scheme of the limited level of the reservoir during the flood season according to the design flood, the flood forecasting, the flood control operation under forecasting, the flood control standard of upstream and downstream of the reservoir, the immigrants range, and the benefits and the risk of the reservoir in a long period of the operation simulation

    最後以海河流域潘家口水庫為分析實例,從設計洪水、預報預泄、洪水預報調度方式、上下游防洪設計標準、上游移民淹沒及土地退賠線、水庫長期運行的風險和效益等多個方面分析論證了水庫汛限水位的合理調整方案。
  5. Construction diversion and flood passing are a important part of construction scheme in the design of concrete face rockfill dam. the flood passing standard and measures of construction diversion have special characteristic and are closely related to the construction stage and general schedule of the project

    在混凝土面板堆石壩設計中,施工導流及渡汛是施工方案的重要組成部分,混凝土面板堆石壩的導流渡汛標準和方式有其自身的特點,而且與工程的施工分期和總進度安排密切相關。
分享友人