standard sections 中文意思是什麼

standard sections 解釋
標準型材
  • standard : n 1 標準,水準,規格,模範。2 旗;軍旗,隊旗;【徽章】標幟,標記;旗標,象徵。3 【植物;植物學】...
  • sections : 鋼錨箱節段
  1. The serial number of furcated needle is composed of three sections including 11 digital codes : the first section ( 1 - 5 digits ) is the standard size of international general mode ; the second section of the 6th digital code is the location of bending helve ; in the third section, except letter h representing " hengxiang " brand, the other group of digits represent the characters different parts of pricker

    叉形針的編號由三部分共11位代碼組成:第一部分( 1 - 5位)是國際通用方式的標準尺寸;第二部分即第6位代碼表示彎柄位置;第三部分除英文字母h代表「恆翔」牌外,其餘一組數字表示叉形針的各部特徵。
  2. The serial number of pricker is composed of three sections including 17 digital codes : the first section ( 1 - 4 digits ) is the standard size of international general mode ; the second section ( 5 - 11 digits ) is penetration distance, length of functional section, pattern of barb, quantity of barbs on each cording and the distance from needlepoint to the first dent ; in the third section ( 12 - 17 digits ), except letter h representing " hengxiang " brand, the other group of digits represent some special characters of pricker

    刺針的編號由三部分共17位代碼組成:第一部分( 1 - 4位)是國際通用方式的標準尺寸;第二部分( 5 - 11位)是刺距、工作段長度、鉤刺型狀、每個棱上的鉤刺數量及針尖到第一齒的距離;第三部分( 12 - 17位)除字母h代表「恆翔」牌外,其餘一組數字表示刺針的一些特殊點。
  3. Aiming at the self - estimation of threat to the sam system, and basing on the analysis of support distance of the target acquisition radar and operation efficiency of the system in three intercept sections, a distance - threat index and a type - threat index of the target are proposed, and a threat - estimation decision - making model is established, and a standard of fire - striking order in each section is put forward

    摘要針對地空導彈系統的威脅自動判斷問題,基於對目標指示雷達保障距離以及三種攔截區間中系統作戰效能的分析,提出了目標距離威脅指數和目標類型威脅指數的概念,進而建立了一種連續型的威脅判斷決策模型,並給出了每個區間火力打擊的排序標準。
  4. Therefore, in december 2000 the bureau of transportation of taipei city government completed a feasibility study for an lrt system in the taipei shin - yi district. this study recommended the adoption of an lrt system with a standard track gauge, power supply from overhead wires, two or three cars per train, a length of 90m for platforms, a certificate system for fare payment, consideration of the possibility of using electronic sensor ticketing systems, type b right - of - way for at grade sections, and signaling control for passing priority at the intersections. the study also proposed an initial lrt line of 9. 6 kilometers in length with 9 stations

    現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的聯絡路線、市中心區集散路線、鐵路與捷運系統接駁路線、都市周邊環狀線、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。
  5. Standard specification for external sealing bands for concrete pipe, manholes, and precast box sections

    混凝土管人孔和預制箱形截面用外部密封帶的標準規范
  6. Standard specification for external sealing bands for concrete pipe, manholes, and precast box sections metric

    混凝土管人孔和預制箱形截面用外部密封帶的標準規范
  7. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范
  8. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范
  9. Standard specification for high strength steel castings in heavy sections

    重型型鋼中高強度鋼鑄件的標準規范
  10. The whole paper is composed vertically of the following sections : the significance, standard and model of the strategic alliance ' s stability ; key interference factors ; key corrective measures and china ' s implementation of the model

    全文縱向以「戰略聯盟穩定性涵義、標準和模型?關鍵因素?關鍵措施?中國的應用」線索組成,橫向由「穩定性?不穩定性」 、 「關鍵因素?關鍵措施」 、 「普遍理論?中國實踐」所組成。
  11. Standard specification for joints for concrete pipe, manholes, and precast box sections using preformed flexible joint sealants

    使用預制撓性接縫密封膠的混凝土管道人孔和預制箱形件的接縫的標準規范
  12. Standard specification for joints for concrete pipe, manholes, and precast box sections using preformed flexible joint sealants metric

    使用預制撓性接縫密封膠的混凝土管道人孔和預制箱形件的接縫的標準規范
  13. By using the standard deviation method, the scaling properties described by the local fractal dimension d and crossover length tc of 48 measured landform profiles in different direction of 6 different studied landform sections are calculated

    負反饋機製表現的越明顯;對于以構造沉降作用為主的盆地區而言,各個方向的地形剖線的分維值均顯示出小於1 . 5的正反饋機制。
  14. After the comparison of the stability checking computations and the section categorised situation both at home and abroad the current standard, some problems was discussed in the standard of our country. contraposed these questions, the paper computed the space stability coefficient of some general t - shaped and l - shaped sections and all the sections of t - shaped, l - shaped and 2 - angle iron t - shaped in the formed - steel - table, and worked out the curves. according to the comparison of the curves the paper got and the curve in the standard, some simple conclusions was put

    對國內外現行規范軸壓柱穩定驗算方法及柱子曲線截面分類情況進行了對比,討論了我國規范曲線中存在的一些問題,並針對這些問題,以規范初始彎曲值對任意「 t 」形和「 l 」形截面和型鋼表中所有t型鋼、 l型鋼、雙角鋼t形鋼截面的空間穩定系數進行了計算,作出其與規范曲線的比較圖,通過計算結果的分析對各類截面歸類情況作了簡單的評述,其中提出的一些建議可以作為規范修訂的參考依據;同時,這些計算結果也進一步證明了本文的柱子空間穩定分析方法的正確性。
  15. Standard test methods for concrete pipe, manhole sections, or tile

    混凝土管人孔構件或瓦管的標準試驗方法
  16. Standard test methods for concrete pipe, manhole sections, or tile metric

    混凝土管人孔構件或瓦管的標準試驗方法
  17. Standard test method for determining the volume of bulk materials using contours or cross sections created by direct operator compilation using photogrammetric procedures

    用斷面或用由攝影測量學過程直接操作者應用產生的交叉部分測定散裝材料容積的標準試驗方法
  18. According to the basic principle of sedimentary geochemistry, two geochemical sections from dongying sag of bohai bay region and turpan basin were selected as the standard models of deep - water rift - subsidence basin and shallow water coal measure basin, respectively

    結果表明,該盆地侏羅系地層元素特徵與東營凹陷很相似,由此推知其古環境在更大程度上傾向于東部深水斷陷湖盆。
  19. This paper advanced a solution to make the first investigation in advance once the engineering facilities positions were preliminarily determined, thus to mitigate the delay of the engineering project due to the new standard, and discussed the principles and methods for determining the key factors in the first investigation in advance, including the times and scope of the investigation, the arrangement of sections and stations, the items and contents, etc

    為減輕由此造成的海洋工程建設周期的施延,提出在工程設施位置基本確定后,提前進行第一次生態環境現狀調查,並探討了提前進行第一次生態環境現狀調查的調查范圍、調查斷面和站位、調查項目和內容等調查要素的確定原則和方法。
  20. In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period

    摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖壩段碾壓混凝土溫度控制標準,介紹景洪水電站縱向圍堰高溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。
分享友人