station height 中文意思是什麼

station height 解釋
站點高度
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  • height : n 1 高,高度;身高;海拔。2 〈常 pl 〉高地,山丘。3 高貴,卓越。4 絕頂,頂點;【聖經】天。5 〈罕...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. Tidal height datum plane of the station

    測站潮高基準面
  3. A general talk about total station apparatus triangulated height measurement

    淺談全站儀三角高程測量
  4. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工控制網為例進行了比較計算。
  5. At the hong kong international airport, ceilometers and cloud searchlight are installed to facilitate accurate measurements of the height of the base of low clouds above the station

    天文臺在香港國際機場設有雲冪儀及雲冪燈,可以準確量度該站上空低雲的雲底高度。
  6. By using a zone model, simulates the behaviour of smoke temperature, height, volume fraction of co changing with time under different smoke control and extraction conditions in the station and introduces three critical conditions as a criterion for judging the effects of different smoke control and extraction methods

    摘要運用區域模型模擬車站內不同防排煙工況下煙氣溫度、高度、 co體積分數隨時間的變化規律,以三項危險臨界條件是否實現作為衡量防排煙效果的判據。
  7. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  8. By using the total station, the surveyors can determine a set of measurable factors, such as upper diameter, diameter at breast - height and tree height, and then calculate the volume

    其測量樹高的精度可達1 / 1400 ,測量任一處直徑的精度可達1 / 200 ,且均高於其它測樹方法的精度,完全能夠滿足林業測量的精度要求。
  9. The shenzhen rainbow bridge is near to the northern railway station, which has big cut bag to span over twenty - nine tracks. arch bridge structure, which has a widely application these years, is taken considering of the bridge height limitation and the site used in downtown. the girder of the bridge is constructed with composite structure of steel and folding concrete slab

    深圳市彩虹大橋地處深圳火車北站,需跨越29股火車軌道,跨徑大,又處於市中心,對橋梁的梁高有所限制,經研究分析,採用近年來廣泛應用的鋼管混凝土拱橋橋型,梁體採用鋼- -混凝土疊合板組合梁組合結構。
  10. In this paper, the climatic variation features and spatial and temporal distribution of the flood and drought in zhejiang province were analyzed by using 36 monthly and seasonal station data during 1961 - 1999 observed over zhejiang province, 160 rainfall and temperature data during 1951 - 1999 observed over china, northern hemisphere 500mb height data during ! 961 - 1999, the planting and flood disasters area data in zhejiang province during 1949 - 1998. we used many method : calculated trend coefficient of rainfall and temperature, used eof, reof, ssa ( singular spectrum analysis ) and mem ( maximum entropy spectrum ) method and synoptic method. we first studied the climatic variation features of summer and autumn and characters of the flood and drought in zhejiang

    本文用1961 - 1999年浙江省36個氣象觀測站的降水量和氣溫資料、 1951 - 1999年全國160站的降水量和氣溫資料、 1961 - 1999年500hpa月平均高度資料和1949 - 1999年浙江省11個地市的受災面積、成災面積、耕地面積等資料,通過計算趨勢系數、變量場eof分解、旋轉eof分解、奇異譜分析和最大熵譜分析等多種統計學方法和天氣學方法,研究了浙江省氣候變化特點及旱澇災害時空分佈的特徵。
  11. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水庫大壩為目前在建的河床趾板建在深厚覆蓋層上國內首座百米級的混凝土面板堆石壩。
  12. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在馬灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主壩1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  13. Baoji guomao hotel guomao hotel is a three - star foreign tourist spot hotel, located in the palitics, economy, culture and communications center in the middle of jing er road and opposite to the baoji railway station square. with the area of 27000 square meter, 25 floors height and 250 guestrooms

    國貿大酒店是三星涉外旅遊定點飯店,坐落於歷史名城青銅器之鄉的寶雞市政治經濟文化交通中心的經二路中段,與寶雞火車站廣場要相對應,總建築面積27000平方米,樓高25層,擁有不同類型的房間250餘套。
  14. Given that the drawing of plane arrangement maps of electrified railway contact net is one of the important junctures of the whole contact net design, starting from the perspective of system, the paper firstly analyzes the drawing task of the plane arrangement maps of railway contact net in details and presents the structure and function of the system, secondly discusses the formulation of consumer menu and dialogue frame and lists the main controlling program of dialogue frame, then by analyzing the involved data of originally drawing course gives and realizes the management of the original drawing data, which achieves the drawing of choosing inter - station and station, the establishment of drawing papers and drawing form, the setting - up of character height and the drawing form coordinate points and drawing starting points and the preserving routes of data documents of drawing form and the note - marking column and the size of subsidiary table

    系統是基於autocad2002平臺,在visuallisp環境下,採用面向對象的編程方法,運用參數化設計的原理,設計開發了運行於windows9x ~ xp上的電氣化鐵路接觸網平面布置圖參數化繪圖系統。電氣化鐵路接觸網平面布置圖的繪制是接觸網整體設計中極其重要的一環,本文從系統的觀點出發,首先對鐵路接觸網平面布置圖的繪制工作做了詳細分析,提出了系統的結構和功能;然後詳細討論用戶菜單及對話框的定製,並列出主要的對話框控製程序;接著通過對初始化繪制圖形過程中所涉及的數據的分析,提出並實現對初始化繪圖數據的管理。
  15. Under the consideration of the engineering geological condition of dahuashui hydropower station, the pre - splitting blasting technology and reasonable construction method are adopted for the excavation of the dam foundation in accordance with the analysis on the rock strata therein, in which the design of the blasting parameters and powder charging structure as well as the angle control and the height of the excavating steps are particularly determined, and then better splitting effect is got for the slope excavation and the quality requirement of the construction is satisfied as well

    摘要結合大花水水電站大壩工程地質條件,通過分析巖層具體情況,採用預裂爆破施工技術,合理施工方法進行壩基開挖,並對爆破參數和裝藥結構的設計,鉆孔的角度控制和梯段高度精心確定,使該邊坡開挖預裂取得良好的效果,保證了壩基開挖的質量要求。
  16. With an analysis of the influence of service frequency, the cars organization on the available length of the platform, and the influence of the station, the circumstance control system, as well as the equipment on the scales of station, the author agrues that the station scale shall be reduced by way of increasing the service frequency, cutting down the length of the platform, compressing the structural height of the station, so as to reach the goal of rational distribution of the auxiliary establishments

    摘要通過分析發車頻率及列車編組對站臺有效長度的影響,以及車站結構型式、環控系統制式的選取和車站設施的布置對于車站面積的影響,初步探討了縮小車站規模的方法和途徑:提高發車頻率,以縮短站臺有效長度;選擇合理的車站層數來壓縮車站的高度;從環控系統的選取以及各種設施用房的合理布置上來減少車站用房面積。
  17. The numerical simulation for adjustable - blade pump on - line autoregulation in diversion works has been studied in this paper whose background is modification works of dongjiang - shengzhen diversion works. the problems include autoregulation on water height of the fore bay in single pump station, autoregulation on output of adjustable - blade pump in single pump station, and autoregulation on flow equation of multilevel pump stations

    本論文以東江深圳供水改造工程為背景,對輸水工程中應用轉槳泵進行在線自動調節數字模擬進行了研究,其中包括單級泵站中對前池水位進行自動調節,單級泵站中對轉槳泵的輸出流量進行自動調節,以及多級泵站輸水系統流量平衡自動調節。
  18. In his reply to a question raised at the sitting on 9 october this year regarding the town planning board s approval of a property development plan, which includes a high - rise building of 400 metres in height, at the site of the hong kong central station of the airport railway, the secretary for planning environment lands stated that the requirement that new building developments in the central district on hong kong island should not protrude the view of victoria peak and its ridgeline is no more than an administrative guideline

    在本年十月九日立法局會議上,規劃環境地政司回答有關城市規劃委員會批準機場鐵路港島中環站上蓋物業的發展計劃,其中包括興建1座高400米的多層大廈的質詢時表示
  19. Several transient simulation programs have been developed based on the models above, and were put into practice of the transient simulations of following : ( 1 ) autoregulation on water height of the fore bay in single pump station, and the influence of governor parameters ; ( 2 ) autoregulation on output of adjustable - blade pump in single pump station, and the influence of governor parameters ; ( 3 ) on - line autoregulation on flow equation of multilevel pump stations system

    本文應用上述方法編制了過渡過程模擬程序, ( 1 )進行了單級泵站中轉槳泵在線自動調節泵站前池水位的動態模擬計算,並對調節參數的影響做了比較研究; ( 2 )進行了單級泵站中轉槳泵在線自動調節泵輸出流量的動態模擬計算,並對調節參數的影響做了比較研究; ( 3 )進行了多級泵站中轉槳泵在線自動調節輸水系統流量平衡的動態模擬計算。
  20. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    高壩洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,壩軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
分享友人