steam and power system 中文意思是什麼

steam and power system 解釋
蒸汽動力系統
  • steam : n 1 蒸汽,水蒸氣,水氣,霧,蒸氣壓力。2 〈口語〉精神,精力,氣力;怒氣。3 輪船,乘輪船旅行。vi 1 ...
  • and : n. 1. 附加條件。2. 〈常 pl. 〉附加細節。
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • system : n 1 體系,系統;分類法;組織;設備,裝置。2 方式;方法;作業方法。3 制度;主義。4 次序,規律。5 ...
  1. The four departments generation set of 360 mw power plant from french alstom by huaneng luohuang power plant, its steam machine control system, including steam machine regulation and steam machine protection system are designed by french gec - alstom dem company

    華能珞璜電廠四臺360mw燃煤發電機組系由法國alstom全套引進,其汽機控制系統,包括汽機調節、汽機保護系統均由法國gec - alstomdem公司開發設計。
  2. Presents the steady - state programming with constant coolant average temperature and constant live steam pressure, an ideal programming for marine nuclear power plant ( npp ), under which, both the coolant average temperature and the live steam pressure of nuclear steam supply system ( nsss ) are constant when the steady state operating condition is varied, and points out that in comparison with the steadysate programming with constant coolant average temperature, the ideal programming can improve the overall operating performance of npp effectively, especially in low - load range, for instance, raise the heat efficiency of npp, decrease the operating noise of main coolant pump, and improve the conditions of design, operation and control of the secondary loop system

    雙恆定運行方案是船用壓水堆核動力裝置的理想運行方案.在這種運行方案下,當裝置穩態功率變化時,冷卻劑平均溫度與蒸汽壓都保持不變,與通常採用的冷卻劑平均溫度恆定運行方案相比,有效地改善了核動力裝置的總體運行性能,特別是在低負荷運行時,可以提高裝置經濟性、降低主泵運行噪聲、改善二迴路系統的設計、運行和控制條件,這對于提高船用核動力裝置的運行可靠性和安全性具有實際意義
  3. The # 9 and # 10 142mw heat supply units in gansu xigu power plant, the steam extraction main pipe system adopt westation control system of westing house company and deb coordination control policy in design. the coordination control policy successfully expand the whole the running range, from the normal running condition to abnormity running condition and start or stop condition, which simplicity base on burthen and main steam pressure coordination control

    甘肅西固熱電廠# 9 、 # 10142mw抽汽母管制供熱機組,選用美國西屋公司westation控制系統,設計、應用了deb協調控制策略,從單純作為負荷和主蒸汽壓力控制協調的基本功能,成功擴展到整個運行范圍,即從正常運行工況到異常運行工況及啟、停工況。
  4. It is widely in sectors of petroleum, chemical engineering, power, printing and dyeing textile for heating and steaming system, condensation water recycling and over heating steam projects

    該閥廣泛用於石油、化工、電力、紡織印染、等行業的各種蒸汽加熱設備,蒸汽管網、凝汽管網、凝結水回收工程和低過熱蒸汽工程。
  5. Drying and solidification system : multi - formed oven and path. forms of heating : power, steam, gas, fuel and coal

    烘乾固化系統:多種形式的烘烤爐、各種形式的烘道,加熱源形式有:電力、蒸汽、燃氣、燃油、燃煤。
  6. On the deep foundation that studies and understands thermaldynamic system of steam power plant, this text is to compare analytic theories and computation method constantly used at present on the economy of thermaldynamic system of steam power plant, calculate the influences on thermal economy with theory of equivalent enthalpy drop when high pressure heater is into stoppage, prove influences degree on thermal economy when the composition of heater stoppage is diffrent, define regenerator rate and offer theoretical direction for heater stoppage

    本文在對火力發電廠熱力系統深入學習、掌握的基礎上,對目前幾種常用的火力發電廠熱力系統經濟性分析理論和計算方法進行了比較,以等效焓降理論對高壓加熱器停運時熱經濟性的影響進行了計算,說明了高壓加熱器各種停運組合對熱經濟性的影響程度;提出了加熱器回熱率概念,從而為高壓加熱器切除提供了理論指導。
  7. It has a rich supply system of water, power and steam

    萬噸,從雲南貴州購得。
  8. Establishing on the foundation of the project of " the monitoring state and maintenance assist support system of feed pump for 300mw unit, shiheng power plant, shandong ", this paper ' s content comprise on - line monitoring and thermodynamic calculation on small steam turbine for feed water pump, and supply the necessary data for feed water pump ' s performance analysis, trouble analysis and small steam turbine ' s performance analysis, optimization, heat stress calculation and tremble monitoring

    =本論文的內容是建立在「山東石橫電廠給水泵狀態監測與維修輔助支持系統」項目基礎上,涉及大型機組鍋爐給水泵驅動用小汽輪機進行在線監測和熱力計算,為給水泵的性能分析、故障分析以及小汽輪機的性能分析和優化、熱應力計算和震動監測提供必需的數據。
  9. With the engineering thermophysics subject as a main theory basis, the boiler, the steam turbine, the internal combustion engine and the other new, being developed power machinery and system as the research object, the application of engineering thermodynamics , heat transfer, computer system control theory, environmental science, microelectronics technology, energy - saving technology and other knowledge , study the process and the basic law of fuels chemical energy and liquid kinetic energy to converse to the power securely and efficiently and low ( or no ) impurely ; study the energy conversion process systems and technology of equipment automatic control ; study the producing mechanism and emission control technology of combustion pollutants ; study energy - saving technologies and the development of new energy technologies

    熱能工程是以工程熱物理學科為主要理論基礎,以鍋爐、汽輪機、內燃機和正在發展中的其它新型動力機械及系統為研究對象,運用工程熱力學、傳熱學、計算機自動控制理論、環境科學、微電子技術、節能技術等學科的知識,研究燃料的化學能和液體的動能安全、高效、低(或無)污染地轉換成動力的基本規律和過程;研究能量轉換過程中的系統和設備的自動控制技術;研究燃燒污染物生成機理與排放控制技術;研究節能技術與新能源的開發技術。
  10. Their titles are : 《 the investigation of aca in the optimization of controller parameters in the thermal automation system 》, 《 realization of simulative simulation in wan 》, 《 inspired simulator and application in steam system of power units 》, 《 study and realization of wet flue gas system simulator in power plant 》

    其中,張倩同學的論文題目是《蟻群演算法在熱工自控參數優化中的應用研究》 ,陳孝偉同學的論文題目是《激勵式模擬系統在廣域網中的實現》 ,何麗娜同學的論文題目是《激勵式模擬機及其在火電機組蒸汽系統中的應用》 ,白永鳳同學的論文題目《火電廠濕法煙氣脫硫系統模擬機的研究及實現》 。
  11. After fully heat - exchanged inner individual processes, the further integration for heat sources and heat sinks of processes with utility system of steam - power cogeneration was made, including the balance between energy use and heat recovery, cogeneration of steam and power, optimization of steam levels, and synthesis of turbine networks

    在實現各過程內部熱量交換的基礎上,進行各過程之間的剩餘熱阱和熱源與蒸汽動力系統的全局能量集成,包括廢熱回收、熱功聯產、蒸汽系統設計和透平網路綜合。
  12. Unit no. 1 in huaneng beijing thermal power plant is a 145 mw extraction steam turbine manufactured by ural steam turbine factory in russia, and has adopted a governing system with co - existence of electric and hydraulic modes

    摘要華能北京熱電公司1號機組為俄羅斯烏拉爾汽輪機製造廠生產的145mw抽汽式汽輪機,採用電液並存調節系統。
  13. Technical retrofit for the domestic water heating system in residential quater of one thermal power plant has been carried out by adopting the boosting and heating technology based on supersonic steam - liquid two - phase flow, to replace the original water pump and tube type heat exchanger

    摘要採用超音速汽液兩相流升壓加熱技術對某熱電廠福利區生活熱水系統進行了技術改造,以取代原有的水泵及管式換熱器。
  14. The condensing length increases with the boiler heating power and air content increasing, while it decreases with the system pressure increasing. under the normal pressure, the wall temperature and the centerline temperature along the condensing length nearly remain constant for pure steam, while they decrease continuously for steam / air mixture. however, when the steam condenses over, the temperatures drops rapidly

    常壓下,純凈蒸汽冷凝時,有效冷凝段管壁壁溫基本保持不變,但是當蒸汽冷凝完畢進入過冷水階段后,管壁壁溫會急劇下降;蒸汽中含有空氣時,冷凝管中心溫度變化不大,但管壁壁溫始終呈下降趨勢。
  15. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的過程中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同時為了更加系統地對龍鳳熱電廠設備及管道的保溫現狀進行分析,開發了一套「絕熱工程信息決策系統」軟體,利用該軟體可以實現絕熱工程的設計、評估及施工指導,並可以查閱設計及施工標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的選擇。該套軟體的設計填補了國內空白,避免了絕熱工程改造、設計及施工過程中的無序現象,規范了絕熟工程市場,從而為我國絕熱工程的選材、設計、施工及管理提供科學依據。
  16. To meet the need of timely and accurate acquaint and analysis of the power plant fuel consumption in the reform of power industry in china, studies in this paper were mainly focused on the following several aspects : online calculation of the thermal economical performance of boiler, steam turbine and heat system was discussed and studied, and the dynamic relationship between real - time unit

    本論文從機組的熱力特性和負荷因素出發,深入地探究了火電廠的實時負荷與煤耗量的依變關系,通過計算程序得出其變化曲線;然後進一步計算出年、月、日的煤耗量,為燃料部門的購煤提供依據,以便及時做出購煤的計劃;同時分析環境溫度、煤質變化對機組煤耗量的影響。
  17. Main propulsion equipments have been gradually improved. in addition, some additional systems are provided, such as the power station, deck machinery, refrigeration and air condition plant, freshwater generators, drinking water system, steam generating system, ballast and bilge system, and fire fighting system. the management of ship ' s power plant is also known as the engineering management, which is supervised and controlled by the engine department under the direction of the company ' s engine technology management department of the headquarters. owing to the complexity of power plant, the changeability of navigational conditions, and the seriousness of accident ' s consequences, it is essential to explore how to manage the power plant economically and reduce the occurrence of troubles so as to raise the shipping efficiency

    隨著科學技術的發展,不僅推進設備逐步得到完善,而且還增設了諸如船舶電站、起貨機械、冷藏和空調裝置、制淡水裝置以及飲水、蒸汽、壓縮空氣、壓載、艙底、消防等系統。船舶動力裝置的管理即輪機的管理,是在船公司機務部門指導下由船上輪機部具體負責實施。因為船舶動力裝置的復雜性、船舶航行條件的多變性、發生事故後果的嚴重性,所以探討如何對輪機進行經濟性管理,減少故障,從而提高船舶的營運效率非常重要。
  18. This company have been engaging manily in saling some n & h technology facilities which was provided by foreign corporation to the plant in some sector such as sinopec, petrochina, cnooc and power generation etc., and was a unique representative in china of some famous trademark including steam turbine, compressor, valve, pressure transmitor, flow - meter, level - meter and control system etc

    我公司主要從事國外進口機械、電氣、儀表等高新技術設備在國內石化、石油、海油、電力等行業的銷售推廣等業務,並且是一些知名品牌的汽輪機、壓縮機、閥門、壓力變送器、流量計、液位計、控制系統在中國的唯一指定代理。
  19. Key siemens projects in zhejiang includes ultra supercritical steam turbine power plant in yuhuan, container capacity upgrade for beilun container terminal phase iv of ningbo port, advanced imaging system for zhejiang people ' s hospital and turn - key project for the hangzhou qige waste water plant, to just name a few

    西門子在浙江的主要項目包括:玉環電廠超超臨界汽輪機組,寧波港北侖四期集裝箱碼頭集裝箱容量升級,浙江省人民醫院先進的影像系統以及杭州市七格污水處理廠的整體承包工程等。
  20. Whole company has reasonable layout, with accessorial water, power, steam and sewage disposal system, with conditions of modernized producing and research

    全公司布局合理,有與之相配套的水電汽及污水處理等公用工程。具備現代化生產科研的條件。
分享友人