steam boiler plant 中文意思是什麼

steam boiler plant 解釋
蒸汽鍋爐裝置
  • steam : n 1 蒸汽,水蒸氣,水氣,霧,蒸氣壓力。2 〈口語〉精神,精力,氣力;怒氣。3 輪船,乘輪船旅行。vi 1 ...
  • boiler : n. 1. 煮器(壺、鍋等);熬煮東西的人。2. 汽鍋,鍋爐;〈美俚〉酒類干餾器。3. 〈俚語〉導彈。
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. The thesis analyze the steam blending coal quality influence upon boiler and power plant. the linear and nonlinear mathematical models for steam coal blending were established

    本文首先分析了煤質特性、尤其是配煤特性對鍋爐及電廠工作的影響。
  2. The article takes a 600mw natural cycle drum boiler ( soot blow using steam ) as investigating object, establishes soot accumulation loss and soot blowing energy loss models for its water cooling wall, superheater, economizer and air preheater respectively, set up instructions for soot blower operating. simulating calculation results are compared with site data to verify usefulness of key models. the article introduced the operation optimizing design of soot blowers of yanzhou no2 power plant based on theoretical research

    本文以600mw汽包自然循環鍋爐(蒸汽吹灰)為具體分析對象,分別建立其水冷壁、過熱器、省煤器、空預器的積灰損失和各受熱面吹灰能量損失的模型,建立相應的吹灰器運行規則指導,對設計中的關鍵模型問題,通過模擬計算及與現場數據作比較的方法,驗證其可用程度。
  3. The application study is carried out for the pid parameter optimal adjustment for the boiler steam temperature control system of a power plant

    對某電廠300mw直流機組鍋爐過熱汽溫控制系統的參數優化整定進行了應用研究。
  4. What " s more, using the no. 01 steam power plant, experiments was carried out to study the operating process of the marine boiler

    同時,在現有的「 01 」蒸汽動力裝置上進行了實驗研究,數據的採集及處理採用了一套鍋爐模擬動態監測系統,數據真實、準確。
  5. Through analysis and comparison of formation mechanisms for slagging and fouling on beating surfaces of coal - fired boilers, as well as experiences of applying steam sootblowers, hydraulic sootblowers, and fuel - gas pulsating sootblowers on boiler no. 6 in dezhou power plant, in has pointed selected type of sootblowers should be directed against the fouling property and soot cleaning requirements of different heating surfaces in the large - scale coalfired boiler

    摘要通過對蒸汽吹灰器、水力吹灰器、燃氣脈沖吹灰器在德州電廠6號爐應用結果的分析比較,指出大型燃煤鍋爐應根據不同受熱面的積灰特點及清灰需要,有針對性的選擇吹灰器類型。
  6. To meet the need of timely and accurate acquaint and analysis of the power plant fuel consumption in the reform of power industry in china, studies in this paper were mainly focused on the following several aspects : online calculation of the thermal economical performance of boiler, steam turbine and heat system was discussed and studied, and the dynamic relationship between real - time unit

    本論文從機組的熱力特性和負荷因素出發,深入地探究了火電廠的實時負荷與煤耗量的依變關系,通過計算程序得出其變化曲線;然後進一步計算出年、月、日的煤耗量,為燃料部門的購煤提供依據,以便及時做出購煤的計劃;同時分析環境溫度、煤質變化對機組煤耗量的影響。
  7. And then made simulation of the 135mwe cfb boiler of xin xiang power plant with msc2000 and analyzed the simulation result. at last, we put forward a primary design of a 600 mwe supercritical cfb boiler. the main areas of focus in the design of this large cfb boiler with advanced steam conditions were described

    然後,利用該模型,在msc2000模擬平臺上對一臺135mwe循環流化床鍋爐的額定負荷工況、變負荷工況、變過量空氣系數和變二次風率等工況進行模擬,並對模擬結果進行了分析。
  8. In the end, the control system and its hardware diagram for steam - gas temperature of boiler in the power plant is designed

    最後論文討論了電廠鍋爐過熱汽溫的模糊控制系統,並設計了其硬體電路實現圖。
分享友人