steel reinforcement 中文意思是什麼

steel reinforcement 解釋
鋼筋;鋼條
  • steel : n 1 鋼,鋼鐵。2 鋼製品;刀,劍,打火鐮;(女人胸衣等中的)松緊鋼條[絲];鋼磨;〈美國〉剃刀,小刀...
  • reinforcement : n. 1. 增強,加固;補強物,強化物;補給品。2. 增援,支援;〈pl. 〉增援部隊,援軍;救援艦。
  1. Sub - standard cement and steel reinforcement work were commonplace but contractors were able to cover up, with the connivance of government officers, by sending special cement samples to the government laboratory

    不合規格的石屎和鋼筋充斥地盤,他們更讓承建商以特製石屎樣本供政府化驗,以求瞞天過海,掩飾偷工減料的情況。
  2. The steel reinforcement can be simulated in cementing a strip of ordinary photoelastic material along the crack edge.

    沿著裂縫的邊緣粘接由普通光彈性材料製成的窄條,即可模擬鋼筋。
  3. In chapter 3, the steel reinforcement character semantics in construction drawing is firstly analyzed, and then the method of steel reinforcement quantity extraction based on character semantics is presented, which recognize and calculate the steel reinforcement quantity with character semantics of label and autoeciousness

    第三章,分析了工程施工圖紙中包含的信息,歸納出施工圖中鋼筋的特徵語義,提出了基於鋼筋特徵語義的鋼筋識別和工程量計算方法,利用鋼筋的標注和寄生特徵語義來識別並計算出鋼筋工程量。
  4. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆水利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇出了適合該防滲墻工程施工干擾大、工期緊、質量標準高的要求的施工技術,解決好了孔口塌孔的預防、處理及鋼筋籠和預理灌漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  6. The use of steel reinforcement with structures of this type greatly increases their strength.

    這種類型結構物使用鋼筋加固后大大增加其強度。
  7. High - tensile steel reinforcement bar fixture

    高強度鋼筋夾具
  8. To best achieve the working performance of the said concrete, with the help of theology theory in the research, we have analyzed the principle of free - vibration densifying and shaping of mixed concrete, that is, with the perquisite of fluidity, the concrete should have good property of filling - up - space, penetration through voids of fixed steel reinforcement, adherence and prevention from losing water and segregation, and the conflict between anti - segregation and deforming capability should be sorted out

    為得到自密實高性能混凝土的最佳工作性能,在研究中藉助流變學理論,分析研究了混凝土拌合物免振搗成型和密實的機理,在大流動性的前提下,要求混凝土具有良好的填充性、鋼筋間隙通過性和粘聚性,防止泌水、離析,解決變形能力與抗離析性能力的矛盾。
  9. Based on analysis and comparison of existing test data applied to existing ultimate strength prediction models, interfacial stress at the end of plate is deduced. after formulas for calculating the effective moment of inertia for frp - strengthened beams being revised and adjustment coefficient related to nominal main steel reinforcement ratio and curtailment length ratio being put forward, strength prediction formulas of compound beams under plate end debonding failure are established. in analysis of strength of compound beams under intermediate crack induced interfacial debonding failure mode, several bond strengths and their relation are introduced

    對于板端剝離破壞,在總結現有承載力模型的基礎上,利用已有試驗數據對各承載力計算公式進行了分析比較,進一步採用分階段分析法,推導了板端界面應力的計算公式,在此基礎上,採用加固復合梁有效慣性矩的修正公式,建立了考慮名義配筋率和板端偏移比影響的板端剝離破壞梁承載力的計算公式;對于跨中受彎裂縫導致的粘結破壞,闡述了常見的幾種粘結強度之間的區別和聯系,並基於拉剪粘結強度,提出了跨中受彎裂縫導致粘結破壞的承載力計算公式,並利用現有試驗結果確定了模型中的一些參數;最後,利用試驗數據對本文建立的兩種粘結破壞承載力計算公式進行了檢驗,結果基本吻合。
  10. Steel reinforcement laying machine

    鋼筋敷設機
  11. Standard test method for determining the effects of chemical admixtures on the corrosion of embedded steel reinforcement in concrete exposed to chloride environments

    混凝土暴露于氯化物環境時確定化學混合物對埋置鋼筋腐蝕作用的標準試驗方法
  12. Corrosion of steel reinforcement is now universally recognised as the major factor affecting the material stability and structural integrity of concrete structures

    摘要鋼筋腐蝕已被公認為影響混凝土結構的材料穩定性及結構完整性的主要因素。
  13. Chlorides from deicing salts, groundwater, and seawater corrode steel reinforcement embedded in concrete, causing the most common form of concrete deterioration

    引起混凝土中鋼筋腐蝕的氯鹽,來自化冰鹽、地下水和海水,造成大量混凝土的破壞。
  14. In this paper, the data and function model of engineering budget are constructed, the method of steel reinforcement quantity extraction based on character semantics and the management of a great lot data of engineering budget are presented, then the work flow model of engineering budget is set up, finally two subsystems that are steel reinforcement extracting and engineering budget are realized

    本文建立了工程預算的數據和功能模型,提出了基於特徵語義的鋼筋識別和工程量計算方法以及工程預算數據的關聯與轉換方法,建立了工程預算的工作流程模型,並實現了工程預算中鋼筋工程量提取和預算編制兩個子系統。
  15. The depth of carbonization exceeds the position of reinforcement in concrete beams, nevertheless, the steel reinforcement is still good. 4

    在所調查使用時間比較長的橋梁中,混凝土碳化的深度有很多已經大大超過了鋼筋的部位,但鑿去鋼筋保護層后,可以看到鋼筋完好如初。
  16. The constructional technics of post - inserted the steel reinforcement cage in bored pile and associated equipment

    長螺旋鉆機成孔壓灌砼樁后插鋼筋籠施工工藝及配套裝置的應用
  17. Scheduling, dimensioning, bending and cutting of steel reinforcement for concrete - specification

    混凝土鋼筋的工序尺寸選定彎曲和切削.規范
  18. Steel reinforcement bar delivering roller

    鋼筋輸送輥
  19. During the above iteration, the stress resultants of the concrete in the cross section are evaluated by integrating the concrete stress - strain curve over the compression zone, while those of the structural steel and the steel reinforcement ( if any ) are obtained using the fiber element method

    迭代計算過程中混凝土的截面抗力通過對混凝土應力-應變曲線在截面上的精確積分求得,而型鋼和鋼筋部分的截面抗力則採用纖維元方法求得。
  20. Steel reinforcement bar pre - drawn platform

    鋼筋預拉臺
分享友人