step cost 中文意思是什麼

step cost 解釋
階梯式成本,階梯式變動成本
  • step : vi ( pp )1 走;跨步。2 踩,踏上 (on)。3 跳舞,輕快地走,合著步調走。4 跨入,踏進。5 走上。vt ...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  1. A false step could have cost the climbers their lives.

    爬山者一失足就會喪命。
  2. As an advanced materials preparation technology, spray - deposition has shown remarkable superiority in producing large - sized alloys and metal matrix composites. however, the spray deposeted preforms usually contain a certain quantity of porosity. besides, the oxide films on the surface of the particles lead to week metallurgic conjunction between the particles. in order to obtain an ideal structure and performance, the porous preforms need further densifying and plastical forming. in this paper, a new technology named wedge pressing was used to densify spray - deposeted 5a06 aluminium alloy, in which the large deformation can be obtained through the sum - up of local deformation and multi - step small deformation. this method can also solved the problems in traditional processing and greatly decreased the producing cost. what ’ s more, the reserch on the wedge pressing desification rules about the large - sized spray deposeted preforms was significant it was vital not only to the further densification of the prefoums but also to the further research on plastical deforming the research was also benefit to the industrialization an the application of the spray deposeted porous materials

    坩堝移動式噴射沉積技術作為一種先進的材料制備新技術,在制備大尺寸合金及金屬基復合材料方面具有顯著的優越性。然而噴射沉積坯件特別是大型坯件通常存在一定量的孔隙,顆粒表面存在一定量的氧化膜,顆粒之間未能完全達到良好的冶金結合狀態,因此需要進行后續緻密化和塑性變形才能獲得理想的組織和性能。本文採用一種新型的楔形壓制工藝,即通過局部變形、多道次小變形累積實現大變形的緻密化加工方法,對噴射沉積多孔坯料進行后續緻密化和塑性變形,很好地解決了傳統加工工藝的難題,大大降低了生產成本。
  3. A false step could have cost the climbers their lives

    爬山者一失足就會喪命
  4. On the basis of this study, the author try to bring design of the peacetime and wartime combination and prime cost into this research, as a result, the research method take a great step from the qualitative analysis to quantitative

    在以上研究的基礎上,本文試圖平戰結合的轉換設計和成本核算納入研究范圍中來,使研究方法從定性分析邁入定量分析。
  5. Three steps of the method are, first, genetic algorithm is adopted in the whole planning area to hunt the possible traverse sequence of the substations ; second, the least weight match algorithm in graph theory is adopted to optimize the tie lines between each substation and its neighbors according to the traverse sequence determined in the first step ; finally, the scheme which has the least cost of investment in tie lines will be taken as the ultimate scheme

    第一層優化是在整個規劃區域內,應用遺傳演算法搜索可能的變電站的遍歷順序;第二層優化是按照第一層優化確定的遍歷順序,應用綱絡圖論中的最小權匹配演算法分別對每一個變電站與其相鄰站之間的聯絡線進行優化。
  6. Abc cost - mearing system design studied is composed of activated - based cost - measuring treatment procedure and cost data treatment system, activated - based cost - measuring treatment procedure design involves the definition of cost item and object, the design of cost process, the design of cost measure step and the design of cost measure procedure

    作業成本法的成本核算體系是企業應用作業成本法的基礎,本文所進行的設計研究是在作業成本法基本理論的指導下,對作業成本核算處理程序以及應用作業成本法所需的成本處理體系的設計。
  7. Based on decreasing the production cost and enhancing the high rate performance of this material, this paper adopted a two - step solid - state reaction to improve lifepo4 ` s behavior mainly using carbon coated or doped and mg2 + doped method

    本文從降低材料生產成本的同時提高材料的大電流放電性能出發,採用球磨高溫固相法主要針對碳摻雜/包覆和金屬離子摻雜對磷酸亞鐵鋰進行改性。
  8. Urban planning control and the externalities of urban land use, a very classical problem just to be tackled by this paper is going to follow the very new progress of current economics and take cases of " village within the city ", a problem appeared in the urbanization in china, massive demolishing of illegal buildings in urban area, and the property dispute about the right of sunlight and green land as examples to conduct the study step by step on the externality of land use, transaction cost, property right, government regulation and the rule by law with the help of the author ' s experience gained from years of management in the grass - root office work

    本文正是抓住「城市土地使用的外部效果與規劃控制」這一涉及我國土地資源利用和經濟發展的重大問題,利用主流經濟學的最新進展,以中國城市化中的「城中村」問題、大規模拆除違章建築行動、小區居民捍衛「陽光權」 、 「綠地權」等房產糾紛為背景,結合筆者在廣州市十多年的管理經驗,圍繞外部效果、交易費用、產權、政府規制等深層上的問題展開研究。
  9. The hlsip ' s newly - built projects carry out supervision system, which is favorable to improving investment environment, optimizing project design, improving the quality of projects and the project ' s adaptability to market. the innovated projects " supervision system is favorable to lowering the cost, changing the ageing of projects and bringing in advanced administration equipment and technology, enabling the projects get rid of the dilemma and step into the track of benign cicle

    高揚程梯級提水灌溉工程新建項目推行監理制有利於改善項目投資環境,優化工程設計,提高工程質量,使工程建成後有較強的市場適應能力;更新改造項目監理制的推行有利於降低工程運行成本,改變工程原有缺陷,引進先進的管理設備和技術,使工程盡快走出困境,逐步走上良性運營之路。
  10. The cost control of hlsip shoud take a method of quota design step by step during the design stage ; during the construction seage, the emphasis should be attached to optimizing construction scheme, check and signing the working drawing and making a strict demand on metering pay. at the same time, the cost out - of - control should be avoided, and the constructor should treat the project change cautiously and properly handle the claim

    高揚程梯級提水灌溉工程的投資控制,在設計階段應逐步推行限額設計的作法;施工階段以優化施工方案,審簽施工圖紙,嚴格計量支付為重點,防止投資失控,同時要謹慎對待工程變更,正確處理索賠事宜。
  11. During the construction of the water pile, every key step needs floating crane. compared with cable crane, the floating crane has the characteristics of low cost, large lifting capacity, easy assembling and operating. it is a good method and can be spread and used in the deep - water construction

    在水中橋墩的施工過程中,每個關鍵步驟都需要浮吊作業,有了浮吊,無需纜索吊,就完成了施工,而且浮吊造價低、操作靈活、拼裝簡易、起重量大,在深水作業中,是一種值得推廣和使用的好方法。
  12. Because some of us are only the determined confidence of sum. especially an unattractive rural peasant ‘ s environmental group such as us, without any economic base, so striding every step each time, demands the enormous blood and cost of the tears

    但由於長期參與了我們的義務環保活動,誤工、費時方面不說,還耽誤了不少的農忙季節,影響了農作物的種植收成,已經給他們的生產生活帶來了很大地困難。
  13. It has been deduced that the search direction remains the same but that the step length decreases in optimizing the improved cost function with the conjugate gradient algorithm from the gradient of the cost function that the fir filter apporaches the contrary point spread function ( psf ) more, and that the estimated image is closer to the original one

    從代價函數的梯度入手推導出共軛梯度演算法,其搜索方向保持不變而搜索步長變小,使濾波系數更加退近於點擴展函數逆運算元,從而使估計圖像與原始圖像更加接近。
  14. The usage quantity of chemical fertilizer and diesel 0 : 1take the first place in our province, the effective irrigated area is ninety percent of the cultivated area with the development of the economy and the improvement of the quality of the people who are engaged in agriculture, the agricultural production also changes : one aspect is the number of the labours who are engaged in agricultural prosecution is decreasing year by year. the labours of the rural areas are liberated from farming step by step and more and more labours take up the third industries and processing industries of the agricultural products and so on. the agricultural production calls for saving cost, racing against time and decreasing consumption. the other aspect is the quality of the people who are engaged in the agricultural production has some changes, that is the number of the labours whose ages are below 25 is

    隨著經濟的發展和從業人員素質的提高農業生產也發生了變化,一方面人力投入糧食生產的比例在逐年下降,從事農業生產的農村勞動力逐年縮少,農村勞動力逐步從農業勞作中解放出來,走向農村第三產業和農產品加工行業等等,農業生產也隨時要求實現節本、爭時、減耗;同時,農業生產中一家一戶小規模生產經營方式和產業結構調整帶來的「插花地」的種植模式,使常規的保護性耕作措施不能完全適應現代農村農業生產的實際需要,結合秸稈還田以耙耕或旋耕代替傳統的鏵式犁翻耕是當前農業生產最為適宜的耕作方式。
  15. The first step is to build up the mind to satisfy the customers, nail down the direction of development and the mission of the enterprise, formulate the object which is composed of market, innovation, profit and society, and determine the direction of development. the following step is to analyze comprehensively the opportunities and threats from the external environment, and also the advantages and disadvantages in the internal environment, as to construct and foster the core competence of the flour manufacturers. the third step is to exert comprehensively the strategy of cost - leading strategy, difference strategy integrate strategy target - focus strategy and diversification strategy to foster and maintain the core competence

    麵粉製造企業的核心競爭力管理的過程包括: ( 1 )樹立顧客滿意的戰略思想,明確企業的發展方向和企業使命,並制定由市場目標、創新目標、盈利目標和社會目標組成的戰略目標,決定麵粉製造企業核心競爭力的發展方向; ( 2 )對麵粉製造企業外部環境的機會和威脅、內部環境的優勢和劣勢進行綜合的戰略分析,構建和培育麵粉製造企業核心競爭力; ( 3 )綜合運用成本領先戰略、差別化戰略、集中目標戰略、一體化戰略和多樣化戰略來培育和維護麵粉製造企業核心競爭力; ( 4 )制定職能戰略、進行以企業核心競爭力為載體和顧客滿意為最終奮斗目標的組織結構變革,提高企業領導人的核心競爭力意識,維廣東工業大學管理學碩士學位論文護和發展麵粉製造企業核心競爭力: ( 5 )發展和再造麵粉製造企業核心競爭力等五個步驟。
  16. Powerformer is a new high voltage generator , which use xlpe cable as stator winding instead of rectangular conductor bars , thereby it overcome the shortcomings which the shape of these conductors results in an uneven electric field distribution with high electric field strenghs at the corners especially and prevents the output voltage of the conventional generator from exceeding about 36kv powerformer offers a direct connection to the network without the need for a step - up transformer as a consequence, there are some merits in the total plant equipped with powerformer, such as high effiency, high availability, low maintaining cost and giving less environmental impact

    Powerformer是一種新型的高壓發電機,它採用電纜代替矩形導體作為定子繞組,從而克服了矩形導體電場分佈不均勻,特別是在矩形導體在導體拐角處電場過于集中而使常規發電機的輸出電壓等級不能高於36kv的缺點,使其能夠直接和輸配電網相聯,這樣就不需要升壓變壓器,同時也使裝配powerformer的電廠具有如下優點高效率、可利用率提高、維修費用降低和降低了對環境的負面影響。
  17. The cost engineer plays an important part in the program investment process, from the feasibility study stage, the design stage, the bidding and tendering stage, the construction stage, to the final accounting stage, the cost engineer should fix on the conceptual control purpose and measure of the program, take the step of beforehand control, in - hand control and after - hand control, in order to carry out the controlling of all the project process and direction

    造價工程師在項目投資控制中具有重要的作用,從項目可行性階段、設計階段和招投標階段、施工階段到竣工結算階段,造價工程師負擔著確定項目控制目標和措施,採取事前控制、事中控制、事後控制的手段,實現對工程項目全過程、全方位控制。這是造價工程師在項目投資管理活動中所承擔的責任。
  18. The prediction of oil - gas operation cost is the first step of cost budget and control

    摘要油氣操作成本預測是成本預算與控制的首要環節。
  19. In chapter 3, we give an equivalent form of semi - infinite programming, and a locally convergent ssle method is proposed for sip. we only need solve a linear system equations and a subproblem with a parameter per step, also a modified algorithm which saves cost of computations is given, at the end of the paper, we give a proof of the convergence for the algorithms

    第三章通過適當的變形,得到半無限規劃問題的一個等價形式,並給出一個局部收斂的序列線性方程組演算法,這個演算法在每一步,只需求解一個線性方程組和一個帶參數的非線性子問題,證明了演算法的收斂性,同時,給出了一個修正演算法,與前面演算法相比較,修正演算法節約一定的計算量,同樣具有較好的收斂性。
  20. Optimal periodic control with the lowest operational cost by limiting total substrate discharge mass was studied. through adding new state variable and using supplement functions, the problem with restriction conditions was converted into nonrestriction problem. in addition, the dynamic searching method of optimal step coefficient was developed to modify the conventional gradient method, consequently the calculation problem of the multivariable optimal periodic control was able to be resolved better. it was found that the operational costs of optimal control under various initial states are distinctly different. a new concept of optimal control under optimal initial state was presented. it is pointed out emphatically that to the treatment system without optimal control condition, the suboptimal control with extensive practical value can be realized according to the results of optima control

    著重研究了在限制有機物排放總量時,使其運行費用最低的最優周期控制問題.通過增加新的狀態變量和用補償函數法,將本課題的有約束條件問題化為無約束條件問題,並提出了最優步長參數的動態搜索法來修改傳統的梯度法,從而較完善地解決了多變量最優周期控制的計算問題.研究中還發現了不同初始條件下最優控制所需要的運行費用也大不相同,進而提出了最優初始狀態下最優周期控制的新概念,這對保證出水質量的同時進一步降低污水處理成本來說具有更重要的意義.本文還強調指出:對于尚不具備實現最優控制條件的處理系統,可根據最優控制的研究結果實現具有廣泛實用價值的準最優控制
分享友人